American Mortgage & Equity Consultants, Inc. v. Everett Financial, Inc.
D. Minnesota2/28/2020
AI Case Brief
Generate an AI-powered case brief with:
đKey Facts
âïžLegal Issues
đCourt Holding
đĄReasoning
đŻSignificance
Estimated cost: $0.10â$0.50 per brief, depending on opinion length and retries
Full Opinion
UNITED STATES DISTRICT COURT DISTRICT OF MINNESOTA American Mortgage & Equity Consultants, File No. 20-cv-426 (ECT/KMM) Inc., Plaintiff, v. OPINION AND ORDER Everett Financial, Inc., d/b/a Supreme Lending, Defendant. ________________________________________________________________________ Ari Karen, Offit Kurman, Fulton, MD; Sarah A. Kleinman, Offit Kurman, Philadelphia, PA; Glen E. Schumann and John P. Boyle, Moss & Barnett, PA, Minneapolis, MN, for Plaintiff American Mortgage & Equity Consultants, Inc. F. Matthew Ralph, Briana Al Taqatqa, and Michael A. Lindsay, Dorsey & Whitney LLP, Minneapolis, MN, for Defendant Everett Financial, Inc, d/b/a Supreme Lending. In this breach-of-contract suit between competitors in the mortgage lending industry, Plaintiff American Mortgage & Equity Consultants (âAMECâ) seeks a preliminary injunction forbidding Defendant Supreme Lending from recruiting AMEC employees. AMEC claims that Supreme Lendingâs recruiting activities violate a binding letter of intent executed as part of failed negotiations over Supreme Lendingâs possible acquisition of AMEC. AMECâs motion will be denied because the law and facts do not show at this preliminary stage that AMEC is likely to prevail on the merits or to suffer irreparable harm. I The Partiesâ negotiations began in June 2019. That month, AMECâs chief executive officer, Todd Ellestad, and Supreme Lendingâs president, Scott Everett, discussed Supreme Lendingâs acquisition of AMEC. See Everett Decl. ¶¶ 1â3 [ECF No. 34]. The two quickly agreed on basic terms of the acquisition, and Everett then asked Supreme Lendingâs chief operating officer and chief legal counsel, Jeff Joyce, to prepare the deal papers and negotiate remaining details. Id. ¶ 4; Joyce Decl. ¶ 3 [ECF No. 38]. Joyce and Ellestad began by negotiating a letter of intent pursuant to which AMEC and Supreme Lending would âagree[] to negotiate and enter into an Asset Purchase Agreement and related transaction agreements.â Ellestad Decl. ¶ 4 [ECF No. 16]. On June 21, 2019, Joyce emailed a first draft of the letter of intent (or âLOIâ) to Ellestad. Joyce Decl., Ex. 4 [ECF No. 38-10]. Among other things, this first draft provided: âThis LOI must be accepted and a signed copy returned to [Supreme Lending] . . . within ten (10) days of the date of this LOI[.]â Id. § 11. Ellestad did not sign and return the first draft, so on July 25, Joyce sent a second, updated draft to Ellestad. Joyce Decl., Ex. 5 [ECF No. 38-11]. Like the first draft, the second draft included a term requiring signed acceptance within 10 days. Id. § 11. That same day, Ellestad transmitted to Joyce by email a signed copy of the second draft that included a lengthy addendum with revisions. Joyce Decl., Ex. 6 [ECF No. 38-12]. Ellestadâs proposed revisions effectively created a third draft of the letter of intent. Importantly, Ellestadâs proposed revisions in this third draft included the addition of the following paragraph: âIn the even[t] of a non-successful closing Supreme agrees to not solicit and no[t] hire [] AMEC employees for 24 months after the conclusion of the LOI without written consent from AMEC CEO. The information available to Supreme could be damaging to AMEC.â Id. [ECF No. 38-12 at 8]. Joyce responded that he would review Ellestadâs changes and get back to him. Joyce Decl., Ex. 7 [ECF No. 38-13]. On July 30, Joyce emailed a fourth draft letter of intent to Ellestad. Joyce Decl., Ex. 8 [ECF No. 38-14]. The fourth draft incorporated many of the changes Ellestad proposed in the third draft but did not fully incorporate Ellestadâs non-solicitation, non-hiring clause. Joyceâs fourth draft provided only that Supreme Lending would not solicit AMEC employees for 24 months; Joyce did not incorporate Ellestadâs proposed no- hiring clause. Id. § 1.b.ii. Joyce âspecifically rejected Ellestadâs limitation on âhiringâ AMEC employeesâ because he knew employees from other companies âfrequently initiated contact with Supreme Lending,â and he did not want to forbid Supreme Lending from hiring AMEC employees who initiated contact. Joyce Decl. ¶ 17. On August 3, Ellestad responded by email to the fourth draft letter of intent, stating â[h]ere is the signed LOI.â Joyce Decl., Ex. 9 [ECF No. 38-15]. But it wasnât that simple. The letter of intent attached to Ellestadâs email was not signed and included a handwritten edit reinserting the no-hire provision in the non-solicitation paragraph. Id. at § 1.b.ii. Ellestadâs handwritten edit thus created a fifth draft letter of intent. Notably, all five drafts of the letter of intent included this provision: [E]xcept for the terms, provisions, and conditions of Paragraphs 6 (Confidentiality), 7 (Expenses and Fees), and 10 (Term and Termination) and this sentence, this LOI is not a binding agreement or contract and no binding legal agreement with respect to the subject matter of this LOI will arise until the execution by the parties of the Definitive Agreement. Joyce Decl., Exs. 4â6, 8â9 at § 9. Each draft also required Ellestad to sign and return it to Supreme Lending. No further drafts of the letter of intent were exchanged or discussed. In a letter dated January 17, 2020, Supreme Lending âwithdr[ew] its offer to enter into an Asset Purchase Agreement with [AMEC] or to otherwise acquire the assets or to assume the liabilities of AMEC.â Joyce Decl., Ex. 11 [ECF No. 38-17]. As an alternative to litigation over the failed negotiations, Supreme Lending offered AMEC a mutual release of claims âarising out of or relating to any conduct, event, occurrence, act, or failure to act by [Supreme Lending or AMEC] existing or occurring on or before January 17, 2020.â Id. AMEC and Supreme Lending have different explanations for why their relationship soured and why the acquisition ultimately never occurred. According to AMEC, during and after the Partiesâ letter of intent negotiations, Everett began disparaging Ellestad to AMEC employees. Harazin Decl. ¶ 4 [ECF No. 18]. AMEC says specifically that Everett told AMECâs president and chief operating officer, Jennifer Harazin, that she âcould not trust Ellestad, [] that [she] was underpaid, manipulated, and misled,â and that Everett âwas going to fire Ellestad once theâ acquisition was complete. Id. This disparagement assertedly led Harazin to resign from AMEC. Id. ¶ 5. After her resignation, Harazin received text messages from Everett soliciting her to join Supreme Lending. Id. ¶ 6â7. AMEC also says that, despite the Partiesâ agreement not to disclose the acquisition negotiations to AMEC employees, Supreme Lending did just that. Ellestad Decl. ¶¶ 10â 12. According to AMEC, Supreme Lendingâs assertedly improper disclosure prompted a second AMEC employee to resign. Id. ¶ 13. And in his declaration, Ellestad testifies that a third AMEC employee, Joe Kolesar, reported learning from various Supreme recruiters that AMEC was being sold. Id. ¶¶ 14â15. Ellestad says he âimmediatelyâ reached out to Everett, who confirmed that Supreme Lendingâs chief strategy officer had leaked information regarding the acquisition negotiations to one of Supreme Lendingâs recruiters. Id. ¶ 17. According to Supreme Lending, the acquisition did not occur because âas Supreme Lending began investing the resources necessary to perform due diligence and finalize the deal, AMEC began to fall behind the pace and, ultimately, to engage in acts of outright stalling.â Everett Decl. ¶ 7. Essentially, Supreme Lending began to suspect that AMEC was stalling âin order to use Supreme Lendingâs offer as a stalking horse and to improve [its] negotiating position with other potential buyers.â Id. ¶ 9. Supreme Lending eventually gave AMEC a deadline by which it had to sign the acquisition agreement. Id. ¶ 10. When AMEC did not meet that deadline, Supreme Lending withdrew its offer. Id. This is the second-filed case arising from the Partiesâ failed negotiations. Supreme Lending filed the first suit against AMEC in the District Court of Dallas County, Texas, on January 24, 2020. ECF No. 29. In that case, Supreme Lending asserts claims of fraud, negligent misrepresentation, promissory estoppel, and exemplary damages, alleging essentially that AMEC had no genuine intention of entering into an acquisition agreement. Id. AMEC filed this case in Minnesota District Court, Hennepin County, three days later, on January 27, and Supreme Lending removed the case to this Court on January 31. ECF Nos. 1, 2. AMEC asserts a single breach-of-contract claim, alleging that the Parties agreed to a letter of intent â[o]n or about July 30, 2019,â and that Supreme Lending has and continues to breach the letter of intent by soliciting AMEC employees using information Supreme Lending âreceived during due diligence.â Id. at ¶¶ 7, 34. II1 AMEC characterizes its motion as one seeking a âtemporary restraining order,â Motion [ECF No. 13], but the motion does not comply with Federal Rule of Civil Procedure 65(b). Relevant here, Rule 65(b) provides: (b) Temporary Restraining Order. (1) Issuing Without Notice. The court may issue a temporary restraining order without written or oral notice to the adverse party or its attorney only if: (A) specific facts in an affidavit or a verified complaint clearly show that immediate and irreparable injury, loss, or damage will result to the movant before the adverse party can be heard in opposition; and (B) the movantâs attorney certifies in writing any efforts made to give notice and the reasons why it should not be required. Here, with respect to the requirements in subparagraph (b)(1)(A), neither AMECâs affidavits nor its complaint address the need for an ex parte hearing. Regarding subparagraph (b)(1)(B), AMECâs counsel filed no certification describing why notice 1 The Parties are diverse and the amount in controversy plausibly exceeds $75,000, so subject-matter jurisdiction exists under 28 U.S.C. § 1332. See Not. of Removal ¶¶ 5â6 [ECF No. 1]. Supreme Lending argues that personal jurisdiction is lacking because AMEC has yet to serve the summons and complaint. Mem. in Oppân at 14 [ECF No. 33]. Supreme Lending does not seek dismissal on this basis (at least not yet); it acknowledges this omission âis easily curableâ and argues only that âno preliminary injunction can issueâ until service has occurred. Id. No doubt the threshold question of personal jurisdiction ordinarily must be resolved before the merits. Here, however, the denial of AMECâs motion resolves any concern Supreme Lending has about the issuance of an injunction absent service of process. For this reason, it would make little practical sense to stay consideration of AMECâs motion or delay its inevitable denial until service has occurred. Fed. R. Civ. P. 1. should not be required. For these reasons, AMECâs motion has been adjudicatedâand will be decidedâas a motion for a preliminary injunction. See Buffalo Wild Wings Intâl, Inc. v. Grand Canyon Equity Partners, LLC, 829 F. Supp. 2d 836, 837â38 (D. Minn. 2011) (stating that because the defendants received notice and the motion for a temporary restraining order was fully briefed, âthe Court will treat [the motion] as one for a preliminary injunctionâ). A preliminary injunction is an âextraordinary remedy.â Winter v. Nat. Res. Def. Council, Inc., 555 U.S. 7, 24 (2008) (citation omitted); Watkins Inc. v. Lewis, 346 F.3d 841, 844 (8th Cir. 2003). The Eighth Circuitâs familiar Dataphase decision describes the list of considerations applied to decide whether to grant preliminary injunctive relief: â(1) the likelihood of the movantâs success on the merits; (2) the threat of irreparable harm to the movant in the absence of relief; (3) the balance between that harm and the harm that the relief would cause to the other litigants; and (4) the public interest.â Lexis-Nexis v. Beer, 41 F. Supp. 2d 950, 956 (D. Minn. 1999) (citing Dataphase Sys., Inc. v. C L Sys., Inc., 640 F.2d 109, 112â14 (8th Cir. 1981) (en banc)). The core question is whether the equities âso favor[] the movant that justice requires the court to intervene to preserve the status quo until the merits are determined.â Dataphase, 640 F.2d at 113 (footnote omitted). âThe burden of establishing the four factors lies with the party seeking injunctive relief.â CPI Card Grp., Inc. v. Dwyer, 294 F. Supp. 3d 791, 807 (D. Minn. 2018) (citing Watkins, 346 F.3d at 844). A âWhile no single factor is determinative, the probability of success factor is the most significant.â Home Instead, Inc. v. Florance, 721 F.3d 494, 497 (8th Cir. 2013) (citations and internal quotation marks omitted). Although this factor uses the term âprobability,â the movant need not show a greater than fifty percent likelihood of success. CPI Card Grp., 294 F. Supp. 3d at 807. â[T]he absence of a likelihood of success on the merits strongly suggests that preliminary injunctive relief should be denied.â CDI Energy Servs. v. W. River Pumps, Inc., 567 F.3d 398, 402 (8th Cir. 2009) (citation omitted). Under Minnesota law, â[t]o establish a breach-of-contract claim, a plaintiff must show that (1) a contract was formed; (2) the plaintiff performed any conditions precedent; and (3) the defendant breached the contract.â Ayala v. CyberPower Sys. (USA), Inc., 891 F.3d 1074, 1075 (8th Cir. 2018) (quoting Commercial Assocs., Inc. v. Work Connection, Inc., 712 N.W.2d 772, 782 (Minn. Ct. App. 2006)).2 â[T]he formation of a contract requires communication of a specific and definite offer, acceptance, and consideration.â Commercial Assocs., Inc., 712 N.W.2d at 782; see also United States v. White, 675 F.3d 2 As noted, this case is in federal court based on diversity jurisdiction under 28 U.S.C. § 1332(a). Therefore, state substantive law applies to AMECâs breach-of-contract claim. See Paine v. Jefferson Natâl Life Ins. Co., 594 F.3d 989, 992 (8th Cir. 2010); see also Erie R. Co. v. Tompkins, 304 U.S. 64 (1938). AMEC says Minnesota law applies but doesnât explain why. Supreme Lending âsimilarly assume[s] that Minnesota law applies,â but also says it âreserves the right to argue that Texas law applies in other venues or contexts or to other claims, most notably the claims it has asserted in Texas state court.â Mem. in Oppân at 16 n.5. Based on the Partiesâ agreement, and because the record provides no information to determine independently whether Minnesota or some other stateâs law governs AMECâs claim, Minnesota law will be applied here. See Neth. Ins. Co. v. Main St. Ingredients, LLC, 745 F.3d 909, 913 (8th Cir. 2014) (âBecause the parties do not dispute the choice of Minnesota law, we assume, without deciding, Minnesota law applies . . . .â). 1073, 1079 (8th Cir. 2012). Regarding acceptance, â[i]t is a settled rule of law [in Minnesota] that, in order to form a contract, an acceptance must be coextensive with the offer and may not introduce additional terms or conditions.â Podany v. Erickson, 49 N.W.2d 193, 194 (Minn. 1951); see also Commercial Assocs., Inc., 712 N.W.2d at 782. âAn acceptance which qualifies the terms of the offer amounts in legal contemplation to a rejection of the offer and is regarded as merely a counteroffer.â Podany, 49 N.W.2d at 194. Further, â[t]he long-standing rule in Minnesota is that âwhere the parties make the reduction of the agreement to writing and its signature by them a condition precedent to its completion, it will not be a contract until that is done, and this is true although all the terms of the contract have been agreed upon.ââ Trautman v. JPMorgan Chase Bank, No. A12- 0300, 2012 WL 3263907, at *3 (Minn. Ct. App. Aug 13, 2012) (emphasis added) (quoting Lamoreaux v. Weisman, 161 N.W. 504, 506 (Minn. 1917)) (citing Minneapolis Cablesystems v. City of Minneapolis, 299 N.W.2d 121, 122â123 (Minn. 1980); Massee v. Gibbs, 210 N.W. 872, 873â74 (Minn. 1926); TNT Props., Ltd. v. Tri-Star Developers LLC, 677 N.W.2d 94, 100 (Minn. Ct. App. 2004)). Applying these long-standing Minnesota rules, the evidence at this preliminary stage shows that none of the letter-of-intent offers were accepted, and AMEC is therefore unlikely to succeed on the merits of its breach-of-contract claim. Each offered letter of intent included a provision entitled âDuration of this Offer.â Joyce Decl., Exs. 4â6, 8â9 at § 11. This term was identical in each offer, and provided that the âLOI must be accepted and a signed copy returned to [Supreme Lending] on or before 5:00 PST within ten (10) days of the date of this LOI, unless extended in writing by mutual agreement.â Id. (emphasis added). In other words, the offer expired unless a signed copy was returned. Therefore, the first, second, fourth, and fifth draft letters of intent were not accepted because Ellestad did not sign them. See Joyce Decl., Exs. 4â5, 8â9; Lamoreaux, 161 N.W. at 506. Nor was the third draft letter of intent accepted because, although Ellestad signed it, he made significant changes to the letter of intentâs terms in an attached addendum. Joyce Decl., Ex. 6. There is no suggestion by AMEC now, and there was no indication by Ellestad then, that the changes made by Ellestad were merely ârequested or suggested modificationsâ or that Ellestad was clearly accepting the letter of intent regardless whether the changes were accepted by Supreme Lending. See Podany, 49 N.W.2d at 194. Though Ellestad never signed and returned a mirror image of the offer, AMEC argues that a contract was formed because there was a meeting of the minds between the Parties as to the fifth and final draft letter of intent. See Reply at 7â8 [ECF No. 40].3 However, Minnesota law is clear that â[w]hen the parties make the reduction of the agreement to writing and its signature by them a condition precedent to its completion, it will not be a contract until that is done, and this is true although all the terms of the contract have been agreed upon.â Lamoreaux, 161 N.W. at 506. Therefore, even if the Parties agreed on all terms in the fifth draft letter of intent, Minnesota law makes clear that this letter was not a contract because it required a signature but was not signed. See Joyce Decl., Ex. 9 at § 11. 3 AMEC argued in its briefing and at the hearing on this motion that the Parties had a meeting of the minds on the fifth draft letter of intent. But in its complaint, AMEC relies on the fourth draft letter of intent. The non-solicitation provision referenced in the complaint differs from the non-solicitation provision in the fifth draft LOI in that the latter also includes a handwritten edit restricting Supreme Lending not merely from soliciting AMEC employees, but from hiring them. Compare Compl. ¶ 12, with Joyce Decl., Ex. 9. Even if the Parties agreed to the fifth draft letter of intent, the non-solicitation provision is not binding or enforceable under the terms of that letter. Under Minnesota law, â[n]o contract is formed by the signing of an instrument when the offeree is aware that the offeror does not intend to be bound by the wording in the instrument.â Hamilton v. Boyce, 48 N.W.2d 172, 174 (Minn. 1951). Further, âwhere the parties have agreed that an agreement to negotiate or letter of intent, in its entirety, is not a binding legal agreement, Minnesota courts have refused to enforce an individual provision of the letter as a freestanding contract promise.â Richie Co., LLP v. Lyndon Ins. Grp., Inc., 316 F.3d 758, 761 (8th Cir. 2003) (citation omitted). Here, § 9 of every version of the letter of intent provided that âexcept for the terms, provisions, and conditions of Paragraphs 6, . . . 7, . . . and 10 . . . and this sentence, this LOI is not a binding agreement or contract and no binding legal agreement with respect to the subject matter of this LOI will arise until the execution by the Parties of theâ acquisition agreement. See Joyce Decl., Exs. 4â6, 8â9 at § 9. The inclusion of § 9 in each version of the letter of intent shows that Supreme Lending did not intend to be bound by § 1.b.ii, the non-solicitation provision. It follows from Richie that if parties may agree that the entirety of a letter of intent is unenforceable, they also may agree that certain parts of a letter of intent are unenforceable, and that is what § 9 does here. See Huber & Sons, Inc. v. Serv. Corp. Intâl, No. 01-cv-1583 (RHK/AJB), 2002 WL 1338036, at *5 (D. Minn. June 17, 2002) (declining to dismiss a breach of contract claim arising out of a specific provision of a letter of intent because, although the letter of intent stated it was not binding, it also provided that the specific provision at issue was legally binding and enforceable). Therefore, if the Parties did agree to the fifth draft letter of intent, § 9 is fatal to AMECâs breach-of-contract claim because it must be understood to say that the non-solicitation provision in § 1.b.ii is non-binding and unenforceable. B The second Dataphase factor is irreparable harm. âIrreparable harm occurs when a party has no adequate remedy at law, typically because its injuries cannot be fully compensated through an award of damages.â Gen. Motors Corp. v. Harry Brownâs, LLC, 563 F.3d 312, 319 (8th Cir. 2009). The harm must be âlikely in the absence of an injunction,â Winter, 555 U.S. at 22 (citations omitted), âgreat[,] and of such imminence that there is a clear and present need for equitable relief,â Iowa Utils. Bd. v. FCC, 109 F.3d 418, 425 (8th Cir. 1996) (citation omitted). A plaintiff must show more than a future risk of irreparable harm; â[t]here must be a clear showing of immediate irreparable injury.â Berkley Risk Admârs Co. v. Accident Fund Holdings, Inc., No. 16-cv-2671 (DSD/KMM), 2016 WL 4472943, at *4 (D. Minn. Aug. 24, 2016) (citation and internal quotation marks omitted). âFailure to show irreparable harm is an independently sufficient ground upon which to deny a preliminary injunction,â and â[w]hen there is an adequate remedy at law, a preliminary injunction is not appropriate.â Watkins Inc., 346 F.3d at 844 (citations omitted); see also Gamble v. Minn. State Indus., No. 16-cv-2720 (JRT/KMM), 2017 WL 6611570, at *2 (D. Minn. Dec. 1, 2017) (collecting cases). AMEC contends it will suffer irreparable harm because â[n]umerous cases have held that irreparable injury is generally inferred from the alleged breach of a valid restrictive covenant.â Mem. in Supp. at 8 [ECF No. 14] (citing Medtronic, Inc. v. Gibbons, 527 F. Supp. 1085, 1091 (D. Minn. 1981); Eutectic Welding Alloys Corp. v. West, 160 N.W.2d 566, 569 n.4 (Minn. 1968)). If this assertion remains a correct rule of law, it does not support the issuance of a preliminary injunction here because, as just explained, the restrictive covenant AMEC relies on is not valid. AMEC has not made âa clear showing of immediate irreparable injuryâ based on Supreme Lendingâs solicitation of AMEC employees. Berkley Risk Admârs Co., 2016 WL 4472943, at *4. If there were a valid restrictive covenant, AMEC has not shown it is likely to suffer irreparable harm in the absence of an injunction. The cases AMEC cites for the proposition that a violation of a restrictive covenant may cause irreparable harm do not focus solely on the breach of the covenant, but the effects of that breach. In Benfield, Inc. v. Moline, the plaintiffs were likely to suffer irreparable harm âin the form of lost good will, reputation, and business relationshipsâ because former employees were allegedly breaching restrictive covenants in their employment contracts by soliciting the plaintiffsâ business clients. 351 F. Supp. 2d 911, 918 (D. Minn. 2004). Similarly, in Medtronic, Inc. v. Advanced Bionics Corp., the Minnesota Court of Appeals explained that âirreparable injury can be inferred from the breach of a restrictive covenant if [a] former employee came into contact with the employerâs customers in a way which obtains a personal hold on the good will of the business.â 630 N.W.2d 438, 452 (Minn. Ct. App. 2001) (citations omitted). In other words, irreparable injury isnât inferred merely from a restrictive covenantâs breach, but from a breach âin a way which obtains a personal hold on the good will of the business.â Id. AMEC has not shown here how Supreme Lendingâs solicitation of AMEC employees obtains a hold on AMECâs good will or business relationships. AMEC has not shown, for example, that particular employees have such a strong personal hold on the good will of AMEC that recruitment of those employees inevitably would harm AMECâs reputation. Nor has AMEC introduced evidence tending to show that its clients, or some of them, are likely to follow recruited employees. It is not difficult to accept that AMEC might suffer financially depending on who among its employees Supreme Lending is able to recruitâ perhaps from having to pay recruited employees more to keep them, perhaps from some decrease in revenuesâbut these amounts seem ââreparableâ through money damages.â Wells Fargo Ins. Servs. USA, Inc. v. King, No. 15-cv-4378 (PJS/JJK), 2016 WL 299013, at *8 (D. Minn. Jan. 25, 2016). C The remaining two Dataphase factors do not change things. The balance-of-harms factor involves âassess[ing] the harm the movant would suffer absent an injunction,â as well as the harm other interested parties âwould experience if the injunction issued.â Katch, LLC v. Sweetser, 143 F. Supp. 3d 854, 875 (D. Minn. 2015). Though AMEC has not shown it is likely to suffer irreparable harm in the absence of an injunction, Supreme Lendingâs ongoing recruitment of its employees poses, at least, challenges for AMEC. By comparison, Supreme Lending characterizes its loss if an injunction were entered as a denial of âthe opportunity to improve its business.â Mem. in Oppân at 32. At least on this record, Supreme Lendingâs loss of this opportunity seems less harmful to it than the challenges its recruiting poses to AMEC. Supreme Lending also argues that an injunction would harm AMEC employees by limiting their employment opportunities, but that loss seems modest because the injunction AMEC seeks would not prevent its employees from seeking employment at Supreme Lending (or elsewhere). It would prevent only Supreme Lendingâs recruitment of them. Finally, the public interest seems insubstantial because this case implicates primarily business interests, see Nilfisk, Inc. v. Liss, No. 17-cv-1902 (WMW/FLN), 2017 WL 7370059, at *7 (D. Minn. June 15, 2017), and the record at this stage does not show that Supreme Lendingâs ability to solicit AMEC employees holds the potential to adversely affect competition in the mortgage lending industry, see Gibbons, 527 F. Supp. at 1095. ORDER Based on the foregoing, and all the files, records, and proceedings herein, IT IS ORDERED THAT Plaintiffâs Motion for a Temporary Restraining Order [ECF No. 13] is DENIED. LET JUDGMENT BE ENTERED ACCORDINGLY. Dated: February 28, 2020 s/ Eric C. Tostrud Eric C. Tostrud United States District Court
Case Information
- Court
- D. Minnesota
- Decision Date
- February 28, 2020
- Status
- Precedential