An opinion was released in case 23-1067, Marin Audubon Society v. FAA
D.C. Cir.11/12/2024
AI Case Brief
Generate an AI-powered case brief with:
đKey Facts
âď¸Legal Issues
đCourt Holding
đĄReasoning
đŻSignificance
Estimated cost: $0.10â$0.50 per brief, depending on opinion length and retries
Full Opinion
United States Court of Appeals FOR THE DISTRICT OF COLUMBIA CIRCUIT Argued January 19, 2024 Decided November 12, 2024 No. 23-1067 MARIN AUDUBON SOCIETY, ET AL., PETITIONERS v. FEDERAL AVIATION ADMINISTRATION, U.S. DEPARTMENT OF TRANSPORTATION AND NATIONAL PARK SERVICE, U.S. DEPARTMENT OF THE INTERIOR, RESPONDENTS On Petition for Review of an Order of the Federal Aviation Administration Peter T. Jenkins argued the cause for petitioners. With him on the briefs was Paula Dinerstein. Justin D. Heminger, Attorney, U.S. Department of Justice, argued the cause for respondents. With him on the brief were Todd Kim, Assistant Attorney General, and Robert P. Stockman, Attorney. Before: SRINIVASAN, Chief Judge, HENDERSON, Circuit Judge, and RANDOLPH, Senior Circuit Judge. 2 Opinion for the Court filed PER CURIAM with respect to Parts I and III. Opinion for the Court filed by Senior Circuit Judge RANDOLPH with respect to Parts II and IV. Concurring opinion filed by Senior Circuit Judge RANDOLPH with respect to Part IV. Dissenting opinion filed by Chief Judge SRINIVASAN with respect to Parts II and IV. I. The Federal Aviation Administration is an agency within the Department of Transportation. The National Park Service is an agency within the Department of the Interior. The National Parks Air Tour Management Act of 2000 requires these two agencies to work together in developing plans regulating tour flights over national parks throughout the United States. See Pub. L. No. 106-181, §§ 801â809, 114 Stat. 61, 185â94 (2000) (codified as amended at 49 U.S.C. § 40128 and note). To that end, the Agencies issued an Air Tour Management Plan governing tourist flights over four national parks near San Francisco, California: the Golden Gate National Recreation Area, Muir Woods National Monument, San Francisco Maritime National Historical Park, and Point Reyes National Seashore. The Agencies determined that there was no need to prepare an environmental analysis under the National Environmental Policy Act because their Plan, as compared to what existed, would cause minimal additional or no environmental impact. 3 A group of organizations and one area resident brought this direct review action to set aside the Agenciesâ Plan. A. The National Parks Act requires commercial air operators to obtain approval from the FAA before conducting tourist flights over a national park. 49 U.S.C. § 40128(a)(1)â(2). The FAA may not approve an operatorâs application without first, âin cooperation withâ the Park Service, developing an Air Tour Management Plan for the park. See id. § 40128(a)(2)(D). âThe objective of any [Plan] shall be to develop acceptable and effective measures to mitigate or prevent the significant adverse impacts, if any, of commercial air tour operations upon the natural and cultural resources, visitor experiences, and tribal lands.â Id. § 40128(b)(1)(B). Such a Plan can prohibit air tours altogether or it may impose lesser limitations, including particular âroutes, maximum or minimum altitudes, time-of-day restrictions,â âmaximum number of flights per unit of time,â and âmitigation of noise, visual, or other impacts.â Id. § 40128(b)(3)(B). In formulating their plan, the Agencies must comply with the National Environmental Policy Act, id. § 40128(b)(2), and their Plan must go through notice and comment procedures, id. § 40128(b)(4)(B). The Parks Act specifies that the FAA âshall make every effort to act on any [commercial air tour operatorâs] application . . . and issue a decision on the application not later than 24 months after it is received or amended.â Id. § 40128(a)(2)(E). Recognizing that the process could take substantial time, Congress directed the FAA to enable existing air tour operators to apply for âinterim operating authority.â Id. § 40128(c)(1). Interim operating authority enables operators already conducting air tours to continue doing so while the Agencies develop 4 a Plan. Interim operating authority terminates 180 days after a Plan is put in place. Id. § 40128(c)(2)(E). The Parks Act also allows the Agencies to enter into voluntary agreements with tour operators in lieu of establishing a Plan. Id. § 40128(b)(7). A voluntary agreement need not undergo formal notice and comment procedures and is not subject to NEPA. See id. § 40128(b)(7)(C). B. NEPA requires federal agencies to prepare âa detailed statementâ assessing the environmental impacts of all âmajor Federal actions significantly affecting the quality of the human environment.â 42 U.S.C. § 4332(2)(C). âââNEPA itself does not mandate particular resultsâ in order to accomplish these ends. Rather, NEPA imposes only procedural requirements on federal agencies with a particular focus on requiring agencies to undertake analyses of the environmental impact of their proposals and actions.â Depât of Transp. v. Pub. Citizen, 541 US. 752, 756â57 (2004) (quoting Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 350 (1989)). The detailed environmental impact statement must analyze the âenvironmental impact of the proposed action,â any unavoidable âadverse environmental effectsâ of the action, and potential alternatives to the action. 42 U.S.C. § 4332(2)(C) (1970) (amended June 3, 2023). According to regulations issued by the Council on Environmental Qualityâabout which more laterâif the proposed action â[i]s not likely to have significant [environmental] effects or the significance of the effects is unknown,â then the agency can prepare an environmental assessment. 40 C.F.R. § 1501.3(a)(2) (2020); see generally 42 5 U.S.C. § 4342. An environmental assessment under CEQâs detailed regulations is a more concise document through which the agency either (i) determines that the action will have significant environmental impacts of a kind requiring an environmental impact statement or (ii) makes a finding of no significant impact, in which case no environmental impact statement is needed. Id. § 1501.5 (2020); see id. § 1501.6 (2020). CEQ regulations also state that the agency may forgo preparing an environmental impact statement or an environmental assessment if the proposed action is âcategorically excludedâ from NEPAâs usual requirements because it â[n]ormally does not have significant effectsâ on the environment. Id. § 1501.3(a)(1) (2020). C. Congress, as noted, directed these Agencies to âmake every effortâ to complete a Plan within twenty-four months of an air tour operatorâs application. 49 U.S.C. § 40128(a)(2)(e). The Agencies, though, became mired in âinfightingâ and âsquabbles.â In re Pub. Emps. for Envât Resp. (In re PEER), 957 F.3d 267, 270 (D.C. Cir. 2020). As of 2020, âapplications [had] been pending at twenty-five parks for nearly two decades,â but the Agencies had âfulfilled their statutory mandate at only two,â albeit even in those instances by reaching voluntary agreements with air tour operators rather than by establishing Plans. Id. at 269â71. Because of the Agenciesâ inaction, our court granted a petition for a writ of mandamus to compel the Agencies to bring all twenty-three parks with pending applicationsâincluding the four parks at issue in this caseâinto compliance with the Act. Id. at 275. Our court also retained jurisdiction to monitor the Agenciesâ progress. Id. at 275â76. 6 In 2011, the Agencies announced their intent to develop a Plan and prepare an environmental assessment for the Bay Area Parks. Notice of Intent to Prepare an Environmental Assessment, 76 Fed. Reg. 45,312 (July 28, 2011). No environmental assessment was ever completed, however. That is because the Agencies halted the process for developing Plans and environmental assessments/environmental impact statements at ten parksâincluding the Bay Area Parksâafter Congress amended the Parks Act in 2012. Termination of Previously Initiated Processes for the Development of Air Tour Management Plans and Environmental Assessments/Environmental Impact Statements for Various National Park Units, 85 Fed. Reg. 55,060, 55,060 (Sept. 3, 2020). The Agencies then formally âterminat[ed]â those processes in September 2020. Id. The initial pause was âdue to a focus on other program priorities,â namely âthe development of Voluntary Agreementsâ with tour operators because those agreements âdo not require compliance with NEPA.â Id. The Agencies then terminated the paused processes because, â[g]iven the length of time since [they] were initiated and actively worked, terminationâ would âallow the agencies to start anew with the development of [Plans] and associated environmental documents at these and other parks.â Id. Upon restarting the Plan process, the Agencies decided to prepare a single Plan for all four Bay Area Parks. They did so because of the âclose proximity of the parks, including shared borders,â and âthe fact that the same operators conducted tours overâ three of the parks, with some routes âoverfl[ying] multiple parks.â U.S. Depât of Transp., Fed. Aviation Admin. & U.S. Depât of the Interior, Natâl Park Serv., Record of Decision: Air Tour Management Plan for Golden Gate National Recreational Area, Muir Woods National Monument, San Francisco Maritime 7 National Historical Park, and Point Reyes National Seashore 4 (Jan. 10, 2023) (Record of Decision). For purposes of their NEPA analysis, the Agencies used existing air tours to determine the environmental baseline against which they would assess the Planâs environmental impact. At the time, two companies possessed interim operating authority to conduct flights over the Bay Area Parks. On paper, those operators together had authority to conduct 5,090 tours per year over the four Parks. Fewer flights were actually flown, however, and the Agencies decided to use the average annual number of actual flights to identify the baseline existing condition. The Agencies calculated that the operators conducted an annual average of 2,548 tours over Golden Gate and San Francisco Maritime from 2017 to 2019, and that 143 of those tours also flew over or close to Point Reyes. The Agencies treated that average volume as the existing environmental condition of the Bay Area Parks. The final Bay Area Parks Plan authorizes maintaining that âexisting condition,â albeit âwith measures designed to mitigate impacts [of the flights] on the Parksâ resources and visitor experience.â Id. at 7. Thus, the Plan authorizes 2,548 tours over Golden Gate and San Francisco Maritime, 143 of which may also fly over Point Reyes, but with certain limitations. For example, the Plan specifies the kinds of aircraft operators can use, imposes daily flight caps, and alters existing routes and schedules to avoid disturbing wildlife and impinging on visitorsâ aesthetic experiences. The Agencies concluded that they did not need to prepare an environmental assessment or environmental impact statement for â[c]hanges or amendments to an approved action when such changes would cause no or only minimal environmental impacts.â Id. at 8. The Agencies determined that the âimpacts 8 [of the Plan] will be beneficial compared to current conditions.â Id. (emphasis added). That was because the Plan would maintain the existing number of flights, currently flying under interim operating authority, but would reduce their environmental impacts through the prescribed mitigation measures. Id. In light of that conclusion, the Agencies finalized the Bay Area Parks Plan without completing any environmental assessment or environmental impact statement. Record of Decision, supra, at 9, 20â21; Record of Decision, supra, app. C (Categorical Exclusion Documentation Form) at 13â17. The Record of Decision for the Plan was a final order of the FAA, which we have jurisdiction to review. 49 U.S.C. § 46110(a); id. § 40128(b)(5). II. As the parties argue the case, it centers on whether the Agencies complied with regulations of the Council on Environmental Quality, an entity within the Executive Office of the President. We will not address these arguments. The CEQ regulations, which purport to govern how all federal agencies must comply with the National Environmental Policy Act, are ultra vires. CEQ traces its rulemaking authority not to legislation but to an Executive Order of the President. But âan executive order is not âlawâ within the meaning of the Constitution.â California v. EPA, 72 F.4th 308, 318 (2023). The Supreme Court, in one of its most significant separation of powers decisions, ruled that the Constitution does not permit the President to seize for himself the âlaw-making power of Congressâ by issuing an order that, âlike a statute, authorizes a government official to 9 promulgate . . . rules and regulations.â Youngstown Sheet & Tube Co. v. Sawyer, 343 U.S. 579, 588 (1952). The Court reiterated and emphasized this point in Chrysler Corp. v. Brown, 441 U.S. 281 (1970): âThe legislative power of the United States is vested in the Congress, and the exercise of quasi-legislative authority by government departments and agencies must be rooted in a grant of such power by the Congress and subject to the limitations which that body imposes.â Id. at 302.1 Yet both sides in this case took for granted CEQâs authority to issue binding NEPA regulations. Although questions about this were raised at oral argument, no party sought leave to file a post-argument brief. That is understandable. Petitioners claimed that the Agencies violated CEQ regulations; the Agencies denied the charge and defended by invoking CEQ regulations. Despite the partiesâ acquiescence in CEQâs regulatory authority, we âretain[] the independent power to identify and apply the proper construction of governing law,â and that is especially true when âthe proper construction is that a law does not govern because it is not in forceâ or is not legally binding. U.S. Natâl Bank v. Indep. Ins. Agents of Am., Inc., 508 U.S. 439, 446 (1993) (first excerpt quoting Kamen v. Kemper Fin. Serv., Inc., 500 U.S. 90, 99 (1991)). Here, CEQâs authority to issue regulations on the basis of an Executive Order raises what is essentially a âseparation of powersâ issue. Mexichem Fluor, 1 See, e.g., Food & Drug Admin. v. Brown & Williamson Tobacco Corp., 529 U.S. 120, 161 (2000) (â[N]o matter how âimportant, conspicuous, and controversialâ the issue, and regardless of how likely the public is to hold the Executive Branch politically accountable, . . . an administrative agencyâs power to regulate in the public interest must always be grounded in a valid grant of authority from Congress.â). 10 Inc. v. EPA, 866 F.3d 451, 453 (D.C. Cir. 2017) (Kavanaugh, J.). âTo the extent that this structural principle is implicated in a given case, the parties cannot by consent cure the constitutional difficulty for the same reason that the parties by consent cannot confer on federal courts subject-matter jurisdiction beyond the limitations imposed by Article III . . . .â Commodity Futures Trading Commân v. Schor, 478 U.S. 833, 850 (1986); see also Freytag v. Commissioner, 501 U.S. 868, 878â89 (1991); Plaut v. Spendthrift Farm, Inc., 514 U.S. 211, 232 (1995); Bahlul v. United States, 840 F.3d 757, 760 n.1 (D.C. Cir. 2016) (en banc) (Kavanaugh, J., concurring). There are good reasons, indeed there are compelling reasons, for us to determine the validity of the CEQ regulations once and for all. Over many years, our court has expressed serious concerns about whether CEQâs regulations had any âbinding effectâ because it was âfar from clearâ that CEQ had any âregulatory authority under [NEPA].â Nevada v. Depât of Energy, 457 F.3d 78, 87 n.5 (D.C. Cir. 2006) (quoting TOMAC v. Norton, 433 F.3d 852, 861 (D.C. Cir. 2006); City of Alexandria v. Slater, 198 F.3d 862, 866 n.3 (D.C. Cir. 1999)); see also Grand Canyon Tr. v. FAA, 290 F.3d 339, 341 n.* (D.C. Cir. 2002); Food & Water Watch v. U.S. Depât of Agric., 1 F.4th 1112, 1118 (D.C. Cir. 2021) (Randolph, J., concurring). It is time for our courtâs long-standing misgivings to be put to the test: âwhere there is so much smoke, there must be a fair amount of fire, and we would do well to analyze the causes.â Henry J. Friendly, A Look at the Federal Administrative Agencies, 60 Colum. L. Rev. 429, 432 (1960). A. The National Environmental Policy Act of 1969 required each federal agency to issue a âdetailed statementâ addressing the environmental impact of any proposed âmajor Federal 11 action[] significantly affecting the quality of the human environment.â 42 U.S.C. § 4332(C). All federal agencies were required to develop procedures implementing NEPA. Id. § 4332(2)(B). NEPA also created a âCouncil on Environmental Qualityâ within the Executive Office of the President, to be run by three Commissioners appointed by the President and confirmed by the Senate. Id. § 4342. CEQâs job was to âreview and appraiseâ agenciesâ compliance with NEPA; to âmake recommendations to the President with respect theretoâ; and to âdevelop and recommend to the President national policies to foster and promote the improvement of environmental quality.â Id. § 4344(3)â(4). In 1970, President Nixon issued an Executive Order instructing CEQ to â[i]ssue guidelines to Federal agencies for the preparation ofâ the âdetailed statementsâ NEPA required. Exec. Order No. 11514, § 3(h), 35 Fed. Reg. 4247, 4248 (Mar. 7, 1970). In response, CEQ published a âmemorandumâ containing âguidelinesâ for federal agencies considering environmental impact statements. 36 Fed. Reg. 7724, 7724 (Apr. 23, 1971). At the time, several courts concluded that CEQâs role was âmerely advisoryâ because it lacked any âauthority to prescribe regulations governing compliance with NEPA.â Hiram Clarke Civic Club, Inc. v. Lynn, 476 F.2d 421, 424 (5th Cir. 1973) (citing Greene Cnty. Planning Bd. v. Fed. Power Commân, 455 F.2d 412, 421 (2d Cir. 1972)). These courts and others therefore viewed CEQâs guidelines as non-binding suggestions to assist agencies in developing their own NEPA procedures. See Aertsen v. Landrieu, 637 F.2d 12, 17 (1st Cir. 1980); Natâl Helium Corp. v. Morton, 455 F.2d 650, 656 (10th Cir. 1971). CEQ held a quite different view. It considered its guidelines to be mandatory, ânon-discretionary standards for 12 agency decision-making.â 43 Fed. Reg. 55,978, 55,978 (Nov. 29, 1978). These divergent views were at the center of Sierra Club v. Morton, 514 F.2d 856 (D.C. Cir. 1975). Our court sided with CEQ, treating its NEPA guidelines as the equivalent of legally binding rules, entitled to âgreat respectâ and âheightenedâ âdeference,â and rejected the Department of the Interiorâs environmental impact âstatementâ (a âstatementâ consisting of many thick volumes) because it failed to comply with those guidelines. Id. at 873 & n. 24. When the case reached the Supreme Court, the Solicitor Generalâin a quasi-confession of errorâadvised the Court that CEQâs guidelines were not mandatory and âdo not bind agencies of the Executive branch.â Brief for the Petitioners at 31 n.24, Kleppe v. Sierra Club, 427 U.S. 390 (1976) (Nos. 75-552 & 75- 561). As a result, the Supreme Courtâs Kleppe v. Sierra Club opinion, which reversed the D.C. Circuit, made no mention of CEQ or its guidelines. In 1977, President Carter took office and issued Executive Order 11991, 42 Fed. Reg. 26,967 (May 25, 1977), apparently in response to the Solicitor Generalâs position in the Kleppe Supreme Court case. President Carterâs Executive Order was meant to empower CEQ to issue âregulations,â rather than âguidelines,â âto Federal agencies for the implementation of the procedural provisions of [NEPA].â Id. His Executive Order required all federal agencies to âcomply with the regulations issued by [CEQ]â unless doing so would violate federal law. Id. at 26,968. President Carter imposed these duties â[b]y virtue ofâ his authority as President and âin furtherance of the purpose and policyâ of NEPA and several other environmental laws. Id. at 26,967. In so doing, he embarked on âthe most ambitious presidential foray into the nationâs environmental protection effort: the transformation of the CEQ from an advisory entity into a regulatory agency.â Scott C. Whitney, The Role of the 13 Presidentâs Council on Environmental Quality in the 1990âs and Beyond, 6 J. Envât L. & Litig. 81, 84 (1991). In compliance with President Carterâs Executive Order, CEQ issued what amounted to a massive new body of law âbinding on all Federal agencies,â the federal courts, and the non-federal litigants in NEPA cases and setting forth âuniform standards applicable throughout the Federal government.â 43 Fed. Reg. 55,978â79 (Nov. 29, 1978). In its initial foray, CEQ issued ninety-two NEPA mandatory regulations, many with numerous subparts containing extensive detailed and intricate explanations and directives. CEQâs 1978 regulations replaced âsome seventy different sets of agency regulations,â leaving the other Executive and independent agencies with only the residual authority to âissue implementing proceduresâ for applying CEQâs mandates. Id. As authority for its regulations, CEQ invoked Executive Order 11991 and âthe Presidentâs Constitutional and statutory authority.â Id. Those original CEQ regulations erected a framework that largely remains in effect to this day. The regulations described the âdetailed statementâ NEPA requires for proposed agency action âsignificantly affecting the quality of the human environment.â 42 U.S.C. § 4332(C); see also 40 C.F.R. § 1508.11 (1978). An agency must begin by determining whether the proposed action would have a significant environmental effect, and then document its findings in a concise statement CEQ called an âenvironmental assessment.â Id. §§ 1501.3â.4, 1508.9. If the agency finds that the actionâs environmental effect would be significant, it must prepare an âenvironmental impact statement.â Id. If it does not so find, the agency must issue a âfinding of no significant impactâ documenting its conclusion. See id. § 1508.13. CEQ also permitted agencies to comply with NEPA in one 14 other way: by invoking what CEQâcoining a phraseâcalled a âcategorical exclusion.â See id. §§ 1501.4, 1508.4. Under the regulations, an agency may identify categories of actions that have no significant environmental effects. Id. If a proposed action fits into one of those categories, the agency can invoke the categorical exclusion and avoid preparing an environmental assessment or an environmental impact statement. Id.2 In January 2023, the Park Service and the FAA issued a plan to manage commercial air tours over several national parks in and around San Francisco. In explaining their environmental analysis, they repeatedly relied on CEQâs NEPA regulations. See J.A. 8â9, J.A. 20â21, 24â25, 58, 151, 159â63. They asserted that they had complied with NEPA by applying the Park Serviceâs categorical exclusion for â[c]hanges or amendments to an approved action when such changes would cause no or only minimal environmental impacts.â J.A. 8â9. B. Federal agencies, whether executive agencies like the FAA and the Park Service or independent agencies like the Nuclear Regulatory Commission and the Federal Energy Regulatory 2 The National Parks Act contains one provision incorporating five CEQ regulations dealing mainly with the coordination between agencies in making NEPA determinations. 49 U.S.C. § 40128(b)(4)(c). Those regulations are not at issue, and CEQ has revised them since passage of the National Parks Act in 2020 and 2024. Noticeably absent even from the National Parks Actâs incorporation is CEQâs regulation dealing with âcategorical exclusion,â which is at issue in this case. 15 Commission,3 are creatures of statute and as such âliterally ha[ve] no power to actâ except to the extent Congress authorized them. FEC v. Ted Cruz for Senate, 596 U.S. 289, 301 (2022) (quoting La. Pub. Serv. Commân v. FCC, 476 U.S. 355, 374 (1986)). For CEQâs regulations to be legally binding on agencies, courts, and the public, âit is necessary to establish a nexus between the regulations and some delegation of the requisite legislative authority by Congress.â Chrysler, 441 U.S. at 304. Then-Judge Kavanaugh put it this way: âThe separation of powers and statutory interpretation issue that arises again and again in this Court is whether an executive or independent agency has statutory authority from Congress to issue a particular regulation.â Mexichem, 866 F.3d at 453. The âseparation of powers and statutory interpretation issueâ that CEQâs regulations present is thus unremarkable. What is quite remarkable is that this issue has remained largely undetected and undecided for so many years in so many cases. One apparent reason for the oversight is that CEQ publishes its âregulationsâ in the Code of Federal Regulations, as if that were a credential. The temptation for litigants and courts is to treat publication in the C.F.R. as equal to publication in the United States Code. Trouble is that publication in the C.F.R. is no measure of an agencyâs authority to issue rules that appear there, as Professor Merrill has explained. Thomas W. Merrill, Judge Williams on Administrative Law, 16 N.Y.U. J. L. & Liberty 98, 100â02 (2022) (discussing Health Ins. Assân v. Shalala, 23 F.3d 412 (D.C. Cir. 1994)). The provisions of 3 The Federal Energy Regulatory Commission is a five-member âindependent regulatory commissionâ within the Department of Energy. 42 U.S.C. § 7171(a). Both it and the Nuclear Regulatory Commission are considered independent agencies pursuant to 44 U.S.C. § 3502(5). 16 NEPA provide no support for CEQâs authority to issue binding regulations. No statutory language states or suggests that Congress empowered CEQ to issue rules binding on other agenciesâthat is, to act as a regulatory agency rather than as an advisory agency.4 NEPA contains nothing close to the sort of clear language Congress typically uses to confer rulemaking authority. See Thomas W. Merrill & Kathryn Tongue Watts, Agency Rules with the Force of Law: The Original Convention, 116 Harv. L. Rev. 467, 471â76 (2002). No statute confers rulemaking authority on CEQ. President Carterâs Executive Order cited section 309 of the Clean Air Act. 42 Fed. Reg. 26,967 (May 25, 1977). Under this provision, the Administrator of the Environmental Protection Agency reviews the environmental impact of other federal agenciesâ proposed actions. 42 U.S.C. § 7609(a). If the EPA Administrator finds that the proposed action is âunsatisfactoryâ from an environmental-quality standpoint, he must âpublish his determinationâ and refer the matter to CEQ. Id. § 7609(b). That provision is consistent with CEQâs advisory role; it says nothing about CEQâs rulemaking authority. The Executive Order also cites the Environmental Quality Improvement Act of 1970, which established an Office of Environmental Quality headed 4 The legal status of the Council of Economic Advisors, another entity in the Executive Office of the President, provides an example and a contrast. As our court observed, the duties Congress assigned to the Council of Economic Advisors âare, for all practical purposes, identicalâ to the duties Congress assigned to CEQ. Rushforth v. Council of Econ. Advisers, 762 F.2d 1038, 1041â42 (D.C. Cir. 1985) (citing 15 U.S.C. § 1023(c)). Unlike CEQ, no Executive Orders âexpandedâ the powers of the Council of Economic Advisors and it has remained exactly where Congress initially put it: in âthe realm of entities the sole function of which is to advise and assist the President.â Id. 17 by the chairman of CEQ. 42 U.S.C. § 4372(a). Even as the director of that Office, however, CEQâs chairman only has the authority to âassist[]â other federal agencies. Id. § 4372(d)(2), (5), (6). The Chairman may âpromulgate regulationsâ but only related to a fund used to finance the Officeâs projects and research studies.5 Id. § 4375. The Supreme Courtâs pronouncements in this area cannot rescue CEQâs regulations. The Court once wrote that CEQâs regulations under NEPA are âentitled to substantial deference.â Andrus v. Sierra Club, 442 U.S. 347, 358 (1979). But that Chevron-like statement did not result from an examination of CEQâs authority to issue judicially enforceable regulations and cannot be credited in light of the Supreme Courtâs ruling in Loper Bright Enterprises v. Raimondo, 144 S. Ct. 2244 (2024). In another case, the Supreme Court stated that CEQ was âestablished by NEPA with authority to issue regulations interpreting it.â Pub. Citizen, 541 U.S. at 757. The statement appeared without any accompanying legal analysis. We must obey âcarefully considered language of the Supreme Court, even if technically dictum.â Winslow v. FERC, 587 F.3d 1133, 1135 (D.C. Cir. 2009) (quoting United States v. Dorcely, 454 F.3d 366, 375 (D.C. Cir. 2006)). But we are not bound by every stray remark on an issue the parties neither raised nor discussed in any meaningful way. See Webster v. Fall, 266 U.S. 507, 511 (1925); Cohens v. Virginia, 19 U.S. (6 Wheat.) 264, 399â400 (1821) (Marshall, C.J.). 5 Also worth mentioning is the âhousekeeping statute,â 5 U.S.C. § 301, which empowers âthe head of an Executive departmentâ to âprescribe regulations forâ the governance of his department and its operations. This is âsimply a grant of authority to the agency to regulate its own affairsâ and internal functions. Chrysler, 441 U.S. at 309. 18 The CEQ regulations are by no means a mere delegation of the Presidentâs authority under the Take Care Clause. See U.S. Const. art. II, § 3; 3 U.S.C. § 301; see also Whitney, supra, at 91. Executive Orders focused solely on the internal management of the Executive Branch create no private rights and are not judicially reviewable. California v. EPA, 72 F.4th at 318. NEPA, by contrast, âimposes statutory obligations that agencies must execute consistent with the requirements of the APA,â and affect private parties who may seek judicial review of agenciesâ compliance. Id. (citing Cmtys. Against Runway Expansion, Inc. v. FAA, 355 F.3d 678, 689 (D.C. Cir. 2004)).6 If all federal agencies are bound by the CEQ regulations and must follow them in carrying out their obligations under NEPA, and if the regulations are enforceable by courts, then those regulations cannot be justified solely as an exercise in a Presidentâs oversight of his Administration. Besides, upholding the CEQ regulations on the theory that these amount to Presidential oversight would raise additional problems. The regulations âreplace[d]â the rules of some seventy federal agencies, 43 Fed. Reg. at 55,978, and limited the agenciesâ role to supplementing CEQâs work with âimplementing procedures,â 40 C.F.R. § 1507.3(a) (1978). Once the CEQ rules went into effect, they served as binding regulations across the whole of government. And yet Supreme Court decisions hold that the Take Care Clause cannot be used to bypass agenciesâ limited status as âcreatures of statute,â 6 See Pub. Citizen, 541 U.S. at 768 (âThe informational role of an [environmental impact statement] is to give the public the assurance that the agency has indeed considered environmental concerns in its decisionmaking process, and, perhaps more significantly, provide a springboard for public comment in the agency decisionmaking process itself.â). 19 âpossess[ing] only the authority that Congress has provided them.â Natâl Fedân of Indep. Bus. v. OSHA, 595 U.S. 109, 117 (2022). To repeat, the Constitution does not permit the President to seize for himself the âlaw-making power of Congressâ by issuing an order that, âlike a statute, authorizes a government official to promulgate . . . rules and regulations.â Youngstown, 343 U.S. at 588 (1952); see also Whitney, supra, at 92â94.7 7 See NLRB v. Noel Canning, 573 U.S. 513, 571--72 (2014) (Scalia, J., joined by Roberts, C.J., Thomas & Alito, J.J., concurring in the judgment): â[W]hen questions involving the Constitutionâs government-structuring provisions are presented in a justiciable case, it is the solemn responsibility of the Judicial Branch âto say what the law is.â Zivotofsky v. Clinton, 566 U.S. 189, 196 (2012) (quoting Marbury v. Madison, 1 Cranch 137, 177 (1803)). This Court does not defer to the other branches resolution of such controversies; as Justice KENNEDY has previously written, our role is in no way âlessenedâ because it might be said that âthe two political branches are adjusting their own powers between themselves.â Clinton [v. City of New York, 524 U.S. 417, 449 (1998)] (concurring opinion). Since the separation of powers exists for the protection of individual liberty, its vitality âdoes not dependâ on âwhether âthe encroached-upon branch approves the encroachment.â â Free Enterprise Fund, 561 U.S. 477, 497 2010)(quoting New York v. United States, 505 U.S. 144, 182 (1992)); see also Freytag v. Commissioner, 501 U.S. 868, 879â880 (1991); Metropolitan Washington Airports Authority v. Citizens for Abatement of Aircraft Noise, Inc., 501 U.S. 252, 276â277 (1991). Rather, policing the âenduring structureâ of constitutional government 20 CEQ therefore had no lawful authority to promulgate these regulations. One wrinkle remains. Many agencies, including the parent departments of the agencies here (the Department of the Interior, for the Park Service, and the Department of Transportation, for the FAA), have issued their own NEPA regulations. If an agency adopts CEQâs rules or incorporates them by reference into its NEPA regulations, would that be a permissible exercise of its own rulemaking authority?8 The question is a good one, but it does not describe this case. CEQâs regulations, as mentioned, instruct agencies to âconfine themselvesâ to issuing only âimplementing proceduresâ that âcomply with [CEQâs] regulations.â 40 C.F.R. § 1507.3(a)â(b) (1978). The implementing procedures âshall not paraphraseâ CEQâs rules. Id. So the CEQ regulations represent the framework for all agenciesâ compliance with NEPA, leaving the agencies to fill in certain details specific to their programs. As a result, the Agencies here have neither adopted the content of the CEQ regulations nor incorporated those rules by reference. Instead, they obeyed CEQâs command and accepted the CEQ regulations as a stand-alone body of law that they must when the political branches fail to do so is âone of the most vital functions of this Court.â Public Citizen v. Department of Justice, 491 U.S. 440, 468 (1989) (KENNEDY, J., concurring in judgment).â 8 This court has explained in other contexts that an agency cannot outsource authority over the content of its regulations to an entity that itself lacks rulemaking authority. See Assân of Am. R.R.s. v. U.S. Depât of Transp., 721 F.3d 666, 670â71 (D.C. Cir. 2013), vacated & remanded on other grounds, 575 U.S. 43 (2015); NRDC v. EPA, 464 F.3d 1, 8â9 (D.C. Cir. 2006). 21 obey and the courts must enforce. The Department of the Interiorâs NEPA rules, for example, are meant to be used âfor compliance withâ the CEQ regulations. 43 C.F.R. § 46.10(a)(2). Interiorâs regulations âsupplement, and [are] to be used in conjunction with, the CEQ regulations.â Id. § 46.20(a). And although the Department of the Interior once stated that it was âincorporat[ing]â certain CEQ guidance documents, it never said the same of the regulations. 73 Fed. Reg. 61,292, 61,292, 61,298 (Oct. 15, 2008). The Department of Transportationâs rules are similar: they are ânot a substitute forâ the CEQ regulations; do not ârepeat or paraphrase the language of those regulationsâ; and merely âsupplement[] the CEQ regulations by applying them to DOT programs.â Depât of Transp., Order 5610.1C, at 2 (July 30, 1985). The Agenciesâ NEPA analysis in this case reflected that reality. They repeatedly invoked the CEQ regulations, not their own rules, as the source of the overarching regulatory framework they applied. See J.A. 8â9, 20â21, 24â25, 58, 151, 159â63. Their own NEPA regulations came up only to deal with certain agency-specific aspects of the analysis. See J.A. 9, 20, 161, 169â73, 192, 194, 204â05, 220. Even if Interior and Transportation had incorporated CEQâs regulations as their own, they would have been able to do so only for the original 1978 version of the CEQâs rules. Interiorâs current rules went into effect in 2007; Transportationâs in 1985. The CEQ regulations were revised twice before 2023, when the Agencies formulated the Plan. See 87 Fed. Reg. 23,453 (May 20, 2022); 85 Fed. Reg. 43,304 (July 16, 2020). See Wild Va. v. Council on Envât. Quality, 56 F.4th 281, 291 (4th Cir. 2022). The Agencies could not have adopted a body of rules that did not exist at the time. Even if that were possible, nothing in the 22 agenciesâ rules evinced an intent to automatically incorporate every new iteration of the CEQ regulations.9 III. A. Petitioners, without invoking CEQ regulations, argue that the Agencies relied on an improper baseline for their environmental analysis by using the existing level of flights under interim operating authority as the baseline for assessing the environmental effects of the Plan. We agree and hold that it was arbitrary and capricious for the Agencies to treat interim operating authority as the status quo for their NEPA analysis. We reject or decline to reach the rest of Petitionersâ arguments. When conducting an environmental analysis of a proposed action under NEPA, an agency compares the actionâs projected environmental effects to the existing condition of the environment. Through that comparison, the agency can ascertain the magnitude of the proposed actionâs environmental impacts. The agencyâs choice of the baseline for comparison matters a great deal. If the baseline is artificially high, the agency might erroneously conclude that even highly disruptive actions will have minimal incremental environmental effects. In that event, the agency might avoid conducting a more comprehensive environmental analysis required by NEPA. In preparing the Bay Area Parks Plan, the Agencies treated the existing air tours in the Parks as the status quo for purposes 9 It is worth considering whether, under the Administrative Procedure Act, each agency would be required to hold a separate notice and comment rulemaking proceeding before incorporating by reference any CEQ regulatory amendments. 23 of conducting their NEPA analysis. Those tours were conducted under interim operating authority. With the thousands of air tours conducted pursuant to interim operating authority serving as the baseline for comparison, the Agencies concluded that the Plan would have âno or minimalâ environmental impacts. Record of Decision, supra, at 8â9. But by treating interim operating authority as the baseline, the Agencies enshrined the status quo without evaluating the environmental impacts of the existing flights. That outcome stands at odds with the Agenciesâ duties under the Act and NEPA. Under the Act, â[t]he objective of any air tour management plan shall be to develop acceptable and effective measures to mitigate or prevent the significant adverse impacts, if any, of commercial air tour operations upon the natural and cultural resources, visitor experiences, and tribal lands.â 49 U.S.C. § 40128(b)(1)(B). The Act thereby confers a duty upon the Agencies to develop âacceptable and effectiveâ Plans that âmitigate or preventâ significant environmental harms. The Agencies cannot sidestep those obligations by tilting the scales in a way that obscures the true environmental effects of a Plan. That, though, is effectively what the Agencies have done here. The Agencies âdecided to implement the existing conditionââthat is, existing tours conducted under interim operating authorityâ in the Plan âbecause the impacts associated with the existing condition, together with reasonable mitigation measures included in the Plan, would not result in significant adverse impacts of commercial air tour operations upon the natural and cultural resources of any of the Parks or visitor experience in any of the Parks.â Record of Decision, supra, at 14. But the âthe impacts associated with the existing conditionâ along with the âmitigation measuresâ in the Plan would ânot result in significant adverse impactsâ only because they were compared to the existing condition itself. It was 24 unreasonable for the Agencies to avoid fully treating the environmental effects of the Bay Area Parks Plan on the ground that those effects would minimally alter a status quo that itself has never been adequately assessed. See id. at 21 (âThe agencies acknowledge that no previous NEPA analysis of [interim operating authority] occurred. â). The Agencies insist that Congress set interim operating authority as the status quo and that their choice of interim operating authority as the baseline thus was reasonable. True, Congress provided for granting interim operating authority as a means of smoothing the transition between the pre- and post-Air Tour Management Act worlds. But Congress did not intend for the Agencies to treat the level of pre-Act air tours as a legal status quo against which to compare all potential Plans. Under such an approach, the Agencies could grandfather in all pre-Act air tours without ever conducting a NEPA analysis. Congress, though, enacted the Act to âpreserve, protect, and enhance the environment by minimizing, mitigating, or preventing the adverse effects of aircraft overflightsâ on national parks. Pub. L. No. 106-181, § 802(2), 114 Stat. at 186. To achieve those objectives, Congress constructed a detailed scheme by which any operator of national-park air tours would be required to obtain approval from the Agencies, and the Agencies would likewise be required to develop detailed plans governing commercial air tour operations. See 49 U.S.C. § 40128(b). While that process plays itself out, existing operators can continue conducting flights pursuant to interim operating authority, but that authority can be revoked at any time for cause and it automatically expires six months after establishment of a Plan. Id. § 40128(c)(2)(D)â(E). Interim operating authority thus was always meant to be interimâthat is, temporary. Indeed, the Agencies themselves describe interim operating authority as a âstopgap measure.â Record of Decision, 25 supra, at 23. But by treating interim operating authority as the baseline for assessment of a Plan, the Agencies effectively transform a stopgap into a permanent part of a Plan that never undergoes NEPA analysis. This case is unlike Conservation Law Foundation v. FERC, 216 F.3d 41 (D.C. Cir. 2000), on which the Agencies rely. There, we upheld the Federal Energy Regulatory Commissionâs decision to use the existing conditions of an operating dam as the baseline for analyzing the environmental effects of relicensing the dam. But we noted that the relevant statute âsays nothing about whether the baseline for the Commissionâs comparative inquiry should be today or sometime other than today.â Id. at 46. By contrast, the Parks Act makes clear that the provisional grant of interim operating authority should not function as the baseline for environmental analysis. In addition, we noted in Conservation Law Foundation that, regardless of the Commissionâs choice of baseline, it had âfully examinedâ the environmental effects of its proposed action and the alternative options. Id. Here, however, the Agencies failed to fully consider the Planâs environmental effects because they treated the effects of the existing flights as a starting point. For these reasons, we hold that the Agencies acted arbitrarily by using the air tours conducted under interim operating authority as the baseline for evaluating the Bay Area Parks Planâs environmental effects. Because we hold that the Agencies measured environmental impacts against an improper baseline, we need not consider Petitionersâ argument that the Agencies erred by excluding 2015â2016 flight data from that baseline. Nor need we address their contention that interim operating authority does not qualify as an âapproved actionâ for purposes of the approved-action categorical exclusion. 26 B. Petitioners argue that the Agenciesâ decision not to prepare an environmental assessment or environmental impact statement was arbitrary for two additional reasons: (i) the Agencies had previously decided to prepare an environmental assessment for the Bay Area Parks and abandoned that plan, and (ii) the Agencies have preparedâor are planning to prepareâenvironmental assessments for other, allegedly similar national parks. We reject both arguments. First, it was not arbitrary for the Agencies to reverse course and decline to prepare an environmental assessment for the Bay Area Parks. In 2011, the Agencies published a notice in the Federal Register stating their intent to prepare an environmental assessment for the Parks. See 76 Fed. Reg. at 45,312. The Agencies âpausedâ that process upon amendment of the Act in 2012 and later âformally terminatedâ the process in 2020. Record of Decision, supra, at 2â3. When an agency reverses course, it must âdisplay awareness that it is changing positionâ and âshow that there are good reasons for the new policy.â FCC v. Fox Television Stations, Inc., 556 U.S. 502, 515 (2009) (emphasis omitted). Here, the Agencies acknowledged their change of course and provided a reasonable explanation for it: to initiate fresh environmental review processes better suited to current circumstances. See 85 Fed. Reg. at 55,060; accord Record of Decision, supra, at 4. Second, it was not arbitrary for the Agencies to decline to prepare an environmental assessment for the Bay Area Parks even though they prepared or are planning to prepare environmental assessments for purportedly similar national parks. Petitionersâ argument boils down to a simplistic comparison between the number of air tours conducted in the Bay Area Parks and the number of air tours conducted 27 elsewhere. But the Agencies must consider a slew of factors in addition to the absolute number of air tours. Those factors include air tour routes, the altitudes for those tours, restrictions for particular events, noise consequences, and visual impacts. See 49 U.S.C. § 40128(b)(3)(B). And the Agencies must consider the effects upon the ânatural and cultural resourcesâ and âvisitor experiencesâ of the relevant park. Id. § 40128(b)(1)(B). The Agencies are therefore tasked with conducting a highly park-specific inquiry involving far more than simply counting the number of air tours. We extend agencies considerable discretion to weigh an open-ended set of factors, see Natâl Wildlife Fedân v. EPA, 286 F.3d 554, 570 (D.C. Cir. 2002), especially when the agency must make a âpredictive judgment regarding a matter within its sphere of expertise,â Fresno Mobile Radio, Inc. v. FCC, 165 F.3d 965, 971 (D.C. Cir. 1999). In that light, we decline to second-guess the Agenciesâ decision not to prepare an environmental assessment for the Bay Area Parks solely because they prepared environmental assessments for other parks. IV. We come then to the question of remedy. Pursuant to section 706(2) of the Administrative Procedure Act, 5 U.S.C. § 706(2), a reviewing court âshall . . . hold unlawful and set asideâ agency action that violates the APA. Our precedents have authorized remand without vacatur but âonly if an agencyâs error is âcurable.ââ Bridgeport Hosp. v. Becerra, No. 22-5249, --- F.4th ----, 2024 WL 3504407, at *7 (D.C. Cir. July 23, 2024) (quoting U.S. Sugar Corp. v. EPA, 844 F.3d 268, 270 (D.C. Cir. 2016)). As discussed in Part III above, the Agenciesâ actions were ultra vires when they determined that their Plan would have no environmental impact as compared with the existing tour flights permitted on an interim basis. The Agencies will now need to take a completely different tack to complete their 28 NEPA review. Because the Agencies have not shown âat least a serious possibilityâ that they will be able to reach the same outcome on remand, we must vacate the Plan. Id. (quoting Allied-Signal, Inc. v. U.S. Nuclear Regul. Commân, 988 F.2d 146, 151 (D.C. Cir. 1993)). If the Agencies and Petitioners desire to keep the current Plan in place while the Agencies restart their NEPA review, the parties may move for a stay of our mandate. Honeywell Intâl Inc. v. EPA, 374 F.3d 1363, 1375 (D.C. Cir. 2004) (Randolph, J., concurring); accord Griffin v. HM Fla.-ORL, LLC, 144 S. Ct. 1, 2 n.1 (2023) (statement of Kavanaugh, J.). This approach has several practical advantages. It allows the court to hear from both sides, and perhaps from intervenors or amici curiae, gather information about the consequences of granting or denying relief, and decide the question in accordance with our well- established standards for issuing a stay. See NRDC v. EPA, 489 F.3d 1250, 1263â64 (D.C. Cir. 2007) (Randolph, J., concurring). A stay can also place limits and reporting requirements on an agency, thus giving âthe agency an incentive to act in a reasonable time.â Id. at 1264 (Randolph, J., concurring). One might expect that the Agencies will move âpromptlyâ on remand. But an expectation is not an obligation. This court has already had to issue a writ of mandamus to force the Agenciesâ hands. See In re PEER, 957 F.3d at 269. Petitioners should not be saddled with having to clear the bar of mandamus relief if the Agencies take too long. The Agencies acted without authority; they should bear the burden of justifying a stay of the mandate. * * * The petition for review is granted, the FAAâs order is vacated, and the case is remanded to the FAA. So ordered. RANDOLPH, Senior Circuit Judge, concurring with respect to Part IV: As I have maintained, the Administrative Procedure Act requires courts to vacate agency action determined to be unlawful. See Checkosky v. SEC, 23 F.3d 452, 491 (D.C. Cir. 1994) (opinion of Randolph, J.); NRDC v. EPA, 489 F.3d 1250, 1262 (D.C. Cir. 2007) (Randolph, J., concurring); Comcast Corp. v. FCC, 579 F.3d 1, 10 (D.C. Cir. 2009) (Randolph, J., concurring). Section 706(2) provides that a reviewing court âshall . . . hold unlawful and set asideâ agency action that violates the APA. 5 U.S.C. § 706(2). âShallâ in § 706 conveys a âcommand,â as it does in ordinary usage. Loper Bright Enters. v. Raimondo, 144 S. Ct. 2244, 2265 (2024). And to âset asideâ is to vacate, as confirmed by the text, the structure, and the history of the APA, and the longstanding practices of this court and the Supreme Courtâall of which Justice Kavanaugh proved conclusively in Corner Post, Inc. v. Board of Governors of the Federal Reserve System, 144 S. Ct. 2440, 2462â64 (2024) (Kavanaugh, J., concurring). Section 706(2)âs text thus admits of only one meaning: a court mustânot mayâvacate agency action that is arbitrary or capricious or otherwise unlawful. A long line of this courtâs precedents reinforce that conclusion. See Comcast, 579 F.3d at 10â11 & n.2 (Randolph, J., concurring) (collecting cases); Checkosky, 23 F.3d at 491â93 & n.35 (opinion of Randolph, J.) (same). It is true that there are decisions of this court ordering remand without vacatur. E.g. Allied-Signal, Inc. v. U.S. Nuclear Regul. Commân, 988 F.2d 146, 151 (D.C. Cir. 1993). But not one of those decisions even attempted to explain how âshallâ and âset asideâ in § 706(2) could possibly mean âdisregardâ and âkeep in placeâ unlawful agency action. See Webster v. Fall, 266 U.S. 507, 511 (1925). 2 Internal deliberations of the Supreme Court in Bowen v. Georgetown University Hospital, 488 U.S. 204 (1988), unearthed with the release of the Thurgood Marshall papers, support this view. See Ronald M. Levin, âVacationâ at Sea: Judicial Remedies and Equitable Discretion in Administrative Law, 53 Duke L.J. 291, 351--52 (2003). Justice Kennedyâs draft opinion had initially stated that a reviewing court could remand an illegal rule without vacating it. Id. Justice Kennedy deleted that portion of his draft after Justice Scalia circulated a memorandum with which several other justices agreed. Id. Justice Scaliaâs memorandum first quoted § 706(2) with particular emphasis on the word âshallâ preceding âset aside,â and then said this: I think it would be buying grief to suggest that a court may exercise its equitable discretion to disregard [§ 706(2)] by leaving a regulation ânot in accordance with lawâ in effect, or by allowing a revised rule to be formulated and then applied as though it had been issued earlier. For one thing, since not all proceedings calling a rule into question are equitable proceedings â for example, a civil penalty suit brought by the agency for violation of the invalid rule â such a principle would create considerable potential for inconsistent application. (The ordinary statutory provision for direct court-of-appeals review of rulemaking does not, I think, establish an equitable proceeding . . . .) Even apart from this problem, however, I am sure it is not wise for us to invite agencies to seek exercise of âequitable discretionâ to let invalid rules stand. Id. Thus, § 706(2) forecloses judicial discretion, equitable or otherwise. See Miller v. French, 530 U.S. 327, 340â341 (2000). SRINIVASAN, Chief Judge, dissenting with respect to Parts II and IV: I join Part III of the courtâs opinion, in which we reject the Agenciesâ use of the existing level of flights under interim operating authority as the baseline for measuring the environmental effects of their Air Travel Management Plan. Respectfully, though, I am unable to join Parts II and IV of the courtâs opinion, in which my colleagues, respectively: (i) consider whether the CEQ has authority to issue binding NEPA regulations and conclude it does not; and (ii) determine that the Agenciesâ challenged action must be vacated even though the effect of vacatur is to put the prevailing party (petitioners) in a worse position. No party in this case asks us take either of those steps. And in substantially similar circumstances, our court has consistently refrained from unnecessarily deciding the CEQ regulationsâ validity or unnecessarily vacating agency action. I would follow the same course here. 1. In Part II of the courtâs opinion, my colleagues determine that the CEQ lacks authority to issue binding regulations implementing NEPA. There is no cause to reach that issue in this case. First and foremost, no party challenges the CEQâs regulations. In nonetheless reaching out to address the issue, the court contravenes âour established âprinciple of party presentation.ââ Keepseagle v. Perdue, 856 F.3d 1039, 1055 (D.C. Cir. 2017). That principle embodies the idea âthat appellate courts do not sit as self-directed boards of legal inquiry and research, but essentially as arbiters of legal questions presented and argued by the parties before them.â McBride v. Merrell Dow & Pharm., 800 F.2d 1208, 1210 (D.C. Cir. 1986). After all, â[o]ur adversary system is designed around the premise that the parties know what is best for them, and are responsible for advancing the facts and arguments entitling them to relief.â Castro v. United States, 540 U.S. 375, 2 386 (2003) (Scalia, J., concurring in part and concurring in judgment). And when no party raises an issue, we of course lack the benefit of the partiesâ presentation of briefing and argument on it. Of particular salience, we have specifically and steadfastly adhered to the party presentation principle in declining to address the exact issue my colleagues venture out to decide today. Time and again, we have refrained from questioning the CEQâs authority to adopt binding NEPA regulations because the parties did not raise the challenge. See, e.g., Nevada v. Depât of Energy, 457 F.3d 78, 87 n.5 (D.C. Cir. 2006) (âThe DOE accepts [the CEQ regulations] as binding, as do we for purposes of this appeal.â); Grand Canyon Tr. v. FAA, 290 F.3d 339, 341 n.* (D.C. Cir. 2002) (âNeither party challenges the regulatory authority of the CEQ, and hence we have no occasion to question the binding effect of the regulations on the FAA.â); City of Alexandria v. Slater, 198 F.3d 862, 866 n.3 (D.C. Cir. 1999) (âBecause the Administration does not challenge the Council's regulatory authority, we treat the Council's regulations as binding on the agency.â). There is all the more reason to abide by the party presentation principle in this case because we are already ruling in favor of the petitioners on another ground they did raise: that the Agenciesâ choice to use the existing level of flights as the baseline was improper. The relevant CEQ regulation enables the Agencies to rely on a âcategorical exclusionâ from NEPAâs otherwise-applicable requirement to prepare a formal environmental analysis. See 40 C.F.R. §§ 1501.3(a)(1), 1501.4 (2020); Maj. Op. 12, supra. Petitioners do not challenge the validity of the categorical-exclusion regulation, but instead argue (among other things) that the Agenciesâ reliance on the regulation was improper because it rested on an improper baseline. The court today agrees with petitioners on that score. 3 And because we hold that the Agenciesâ reliance on the categorical-exclusion regulation was improper, there is no need to consider whether the regulation is validâeven aside from the fact that no one is challenging the regulationâs lawfulness in the first place. My colleagues ground their decision to assess the CEQâs authority to issue binding regulations on the idea that the question implicates the separation of powers. See Maj. Op. 8, supra. But that of course was no less true in the repeated occasions in which we declined to address precisely the same issue because no party raised the challenge. Even if the parties could not âby consent cureâ the issue if it were squarely presented, id. (quoting Commodity Futures Trading Commân v. Schor, 478 U.S. 833, 850 (1986)), my colleagues do not suggest that the court is somehow obligated to address the issue even though no party has presented it. Rather, as our consistent line of decisions declining to address the validity of the CEQ regulations confirms, the normal rule that we do not take up a challenge unless a party raises it is fully applicable here. Even assuming the party presentation principle could give way in certain circumstances involving a separation-of-powers issue, this case would not be a prime candidate for that kind of exception. My colleagues reference Mexichem Fluor, Inc. v. EPA, 866 F.3d 451 (D.C. Cir. 2017), in support of their invocation of separation-of-powers principles as a reason to address the CEQ regulationsâ validity. Maj. Op. 8, 13, supra. Unlike in this case, the party in Mexichem raised the issue the court decidedâwhether EPA had authority to issue a rule restricting the manufacture of products containing a regulated chemical. 866 F.3d at 456. The restrictive effect of the challenged rule fell directly on a regulated private party, a context in which we are generally sensitive to the âbedrock separation of powers principle[]â of assuring the agencyâs 4 authority to impose the regulatory burden. Id.; cf. Seila Law LLC v. CFPB, 591 U.S. 197, 223 (2020) (âThe Framers recognized that, in the long term, structural protections against abuse of power were critical to preserving liberty.â) (quoting Bowsher v. Synar, 478 U.S. 714, 730 (1986)). Here, by contrast, the CEQâs relevant regulation operates directly on the Agencies, not on a regulated private party: the regulation enables the Agencies to forgo preparing a formal environmental analysis if a categorical exclusion is available. And by doing so, the regulation enables the Agencies to circumscribe their regulatory ambit, not expand it. What is more, to the extent my colleagues believe the party presentation principle should give way even if the party bound by a CEQ regulation is an agency rather than a regulated party, the regulation in question here does not in fact bind an agency. Instead, the regulation enables an agency to rely on a categorical exclusion without requiring the agency to do so. See 40 C.F.R. § 1501.4 (2020). Whatever interest there may be in determining the CEQâs authority to issue binding NEPA regulations, that interest is diminished in a case that does not involve a regulation that in fact binds. For all of those reasons, I would adhere to our consistent practice of declining to address the validity of the CEQ regulations when no party asks us to do so. 2. My colleagues not only address an issue that no party raises, but they also order a remedy that no party desires. That action, too, is out of step with our decisions in like circumstances. Petitioners, the prevailing parties in this case, understandably do not want a vacatur of the Agenciesâ Air Travel Management Plan. That remedy would leave 5 petitioners worse off than the status quo. A vacatur of the Agenciesâ Plan would reinstate the pre-Plan regimeâthat is, the level of flights permitted under the interim operating authority but without the mitigating environmental measures instituted by the Plan. Vacatur, then, âwould at least temporarily defeat . . . the enhanced protection of the environmental valuesâ at stake. Ctr. for Biological Diversity v. EPA, 861 F.3d 174, 188 (D.C. Cir. 2017) (alteration in original) (quoting North Carolina v. EPA, 550 F.3d 1176, 1178 (D.C. Cir. 2008) (per curiam)). Largely for that reason, â[n]o party to this litigation asks that the court vacate [the Plan].â Envât Def. Fund v. Admâr, U.S. EPA, 898 F.2d 183, 190 (D.C. Cir. 1990). Petitioners, while successfully challenging the Plan, submit that vacatur would be âunjustâ because it would only increase air toursâ environmental effects on the Bay Area Parks. Pet. Reply Br. 26. The Agencies, for their part, agree. While they defend the Plan, they allow that if petitionersâ challenge succeeds, then âvacating the Plan while the Agencies conducted more environmental analysis would cause disruptive consequences.â Agenciesâ Br. 67. And because âthe adverse consequences would fall on the very places and people that the Plan protects,â the Agencies explain, âthe Court should exercise its equitable discretion by leaving the Plan in place while the Agencies conduct more NEPA analysis.â Id. at 68. When confronted with similar circumstances, our court has repeatedly remanded to an agency without vacating a flawed but environmentally protective agency action. See, e.g., Ctr. for Biological Diversity, 861 F.3d at 188â89; North Carolina, 550 F.3d at 1178; Envât Def. Fund, 898 F.2d at 190; Sierra Club v. EPA, 167 F.3d 658, 664 (D.C. Cir. 1999); Natâl Lime Assân v. EPA, 233 F.3d 625, 635 (D.C. Cir. 2000); U.S. Sugar Corp. v. EPA, 844 F.3d 268, 270 (D.C. Cir. 2016) (per 6 curiam); Am. Fuel & Petrochemical Mfrs. v. EPA, 937 F.3d 559, 598 (D.C. Cir. 2019 (per curiam). I see no reason to do otherwise here. My colleagues express uncertainty about whether the Agencies would ultimately be able to achieve the same result as the successfully-challenged Plan. Maj. Op. 24, supra. The question, though, is what happens while the Agencies undertake that analysis. And in that regard, there is no cause here for putting the prevailing party in a worse position than the status quo while the proceedings before the Agencies move forward. To the contrary, â[w]e have [] frequently remanded without vacating when a ruleâs defects are curable and where vacatur would at least temporarily defeat . . . the enhanced protection of the environmental values covered by the [rule].â U.S. Sugar Corp., 844 F.3d at 270 (emphasis added) (quotation marks and citation omitted). The defect hereâthe Agenciesâ use of an improper baselineâis at least âcurable.â Id. In North Carolina v. EPA, for instance, we determined that the Clean Air Interstate Rule (CAIR) was âfundamentally flawedâ and that â[n]o amount of tinkering with the rule or revising of the explanations will transform CAIR, as written, into an acceptable rule.â 531 F.3d 896, 929â30 (D.C. Cir. 2008). But we remanded without vacatur, explaining that, ânotwithstanding the relative flaws of CAIR, allowing CAIR to remain in effect until it is replaced by a rule consistent with our opinion would at least temporarily preserve the environmental values covered by CAIR.â 550 F.3d at 1178. We described that âmethod of disposition [as] consistent with the courtâs precedents.â Id. Along the same lines, in Sierra Club v. EPA, we rejected EPAâs methodology in a rule as âhopelessly irrational.â 167 F.3d at 664. But we remanded without vacatur because Sierra 7 Club âexpressly requested that we leave the current regulations in place during any remand, rather than eliminate any federal control at all.â Id. We found it adequate that â[i]t is possible that EPA may be able to explainâ its approach. Id.; see, e.g., Natâl Lime Assân, 233 F.3d at 635 (âIn view of [the petitionerâs] request that we not vacate the EPAâs regulations, because to do so would at least temporarily defeat [its] purpose, the enhanced protection of the environment, we will leave the current [] regulations in place during remand.â) (internal quotation marks and citation omitted); Envât Def. Fund, 898 F.2d at 190 (remanding without vacatur because â[n]o party to this litigation asks that the court vacate the EPAâs regulations, and to do so would at least temporarily defeat petitionerâs purpose, the enhanced protection of the environmental values covered by the [regulations]â). I would apply the same approachâand reach the same conclusionâin this case.
Case Information
- Court
- D.C. Cir.
- Decision Date
- November 12, 2024
- Status
- Precedential