WERNICK, Justice. In June of 1970, the Lewiston, Greene and Monmouth Telephone Company filed with the Public Utilities Commission a complaint, pursuant to 35 M.R.S.A. § 251, 1 against the New England Telephone and Telegraph Company (New England). Alleging that the existing arrangement between it and New England for so-called âExtended Area Serviceâ (EAS) and âExtended Local Serviceâ (ELS) 2 settlements *898 was unfair and unreasonable, the complaint asked the Commission to establish a more equitable settlement arrangement. The Commission regarded the complaint as precipitating the generalized question: âWhat are the proper procedures and methods for determining EAS/ELS settlements between the telephone companies in the State of Maine rendering this type of interexchange (between exchanges) service to the telephone-using public in Maine?â In the exercise of discretionary and investigatory powers reposing in it, the Commission ordered the proceeding broadened to include as parties all telephone companies which provide intrastate telephone service in the State of Maine. Extensive hearings were held. On May 24, 1972 the Commission issued a âDecree and Orderâ embodying various findings of fact and conclusions. On June 22, 1972, purportedly pursuant to 35 M.R.S.A. § 303, 3 (hereinafter âSection 303â) New England filed a notice of âappealâ and thereafter took all appropriate steps to complete the record on appeal and to have the appeal docketed in the Law Court. Lewiston, Greene and Monmouth Telephone Company and all of the other independent telephone companies whom the Commission had made parties to the proceeding have filed a motion to dismiss this appeal of New England on the ground that the appeal is âprematureâ in that the Commission had not yet made a âfinal decisionâ within the meaning of Section 303. The Commission has joined in the motion. Two other motions are before us for decision. They arise because New England, in addition to its Section 303 âappealâ and likewise in June of 1972, filed a âcomplaintâ in the Law Court to invoke the jurisdiction conferred by 35 M.R.S.A. § 305 (hereinafter âSection 305â). 4 The Independent Telephone Companies (the Public Utilities Commission joining with them) have filed a motion to dismiss this Section 305 âcomplaint.â They rely on two grounds (1) âprematurityâ and (2) âa waiver of the right of New England . to proceed under ... § 305 because of New Englandâs having concurrently taken a ... § 303 appeal.â The second motion concerning New Englandâs Section 305 âcomplaintâ proceeding is a motion by New England, as the complainant asking the Law Court to order the taking of additional evidence. This motion was filed on September 6, 1972 and claims to be pursuant to the provisions of Section 305: â . . . â that in cases where issues of confiscation or of constitutional right are involved the court may order such additional evidence as it deems necessary for the determination of such issues to be taken before the commission upon such terms and conditions as to tjie court may seem proper.â New Englandâs motion specifies 'that its Section 305 âcomplaintâ raises issues of âconfiscationâ and âof constitutional right.â The motion further calls special *899 attention to alleged facts that (1) the Commissionâs Decree and Order of May 24, 1972 was forthcoming more than a year after the evidentiary record before the Commission had been closed (on May 4, 1971); (2) more than fifteen months had elapsed between the close of evidence and the motion for additional evidence (September 6, 1972) ; and (3) âsubstantial changes have occurred in facts relevant to the issues of confiscation and constitutional right involved . . ..â For reasons assigned hereinafter, we decide the two motions pertaining to the Section 305 âcomplaintâ proceeding by (1) denying the Independentsâ (and Commissionâs) motion to dismiss the proceeding and (2) granting, with limitations, New Englandâs motion for additional evidence. It is our further conclusion, as hereinafter more fully discussed, that our disposition of the motions concerning the Section 305 proceeding renders presently unnecessary a decision upon the third motion before us â that of the Independents (and the Commission) to dismiss the âappealâ taken by New England under Section 303; and, accordingly, we retain this motion upon our docket, as continued without decision, to await future developments. I Adequate comprehension of the problems presently involved requires extensive description of particular facets of the Commissionâs Order of May 24, 1972. First, the Commission found fundamental deficiencies in the existing âinterimâ settlement agreement, known as the Originating Responsibility Plan (ORP) and which New England sought to have the Commission approve, â as follows: (1) as to the Independents, their âaverage cost per minute of use (on a fully allocated cost basis) is substantially higher than the New England[âs] . average cost per minute of useâ and (2) ORP is âunreasonableâ because it fails to result in the Independentsâ recovering in the form of settlements these average relatively higher fully allocated costs as the Independentsâ contribution to EAS/ELS operations in this State. 5 Second, the Commission conceived the key to any reasonable and equitable settlement arrangement to lie in acceptance of the principle that all telephone customers in the State of Maine must be afforded a reasonable, relatively equal, and equitable opportunity to participate in ânon-tollâ services âbetweenâ exchanges; and, therefore, the settlement question on these ânon-tollâ services âbetweenâ exchanges must be resolved in a manner that will not unduly burden any segment of the present or prospective ânon-toll between exchangesâ customer body in Maine. On this basis, âsignificantâ as an âelementâ in the proper resolution of the issue, in the view of the Commission, is: ârecognition of the Independentsâ [as compared to the Bell Systemâs] relatively higher costs incurred per minute of use of plant and facilities, allocated or as *900 signed to the âbetweenâ exchanges ânon-tollâ services.â Third, the Commission evaluated the plan sponsored for Commission approval by the Independents, known as the âStolz-OâDonnellâ, or âUSITAâ, Plan. The Commission summarized it as follows: â. . . the USITA Plan envisions development of EAS/ELS revenue requirements by allocating or assigning the plant investment and associated expenses of all toll services, both intrastate and interstate, consistent with existing toll settlement procedures. The remaining investment and expenses would be associated with combined (a) intraexchange local service, and (b) the interexchange EAS/ELS service. Plant used exclusively for interexchange EAS/ELS, or for intraexchange service would be directly assigned. Plant used jointly for EAS/ELS and intraexchange local service would be apportioned to each service on the basis of relative use. A composite rate curve would then be developed for each class and grade of service reflecting the scope of the local (non-toll) calling area. EAS/ELS revenues would be derived from the composite rate curves by reading and determining the difference on the curve points of the exchange involved, both excluding and including EAS/ELS.â Fourth, as to the advisability of adopting the USITA Plan, the Commission concluded that âwhile the concepts underlying [it] may have meritâ, the âdata to support the application of the Plan to [the Commissionâs] satisfactionâ had not been adequately provided. As the Commission saw the evidence, âmany questions were left open . . .â including (a) âwould the composite rate curves such as those proposed by the USITA Plan be frozen from the time of installation of EAS, or would the readings on the curves change as growth occurred in each of the exchangesâ and (b) if so, âhow often would the readings be taken on the curve ?â Fifth, having rejected the acceptability of both the settlement plan ORP favored by New England and the plan USITA advocated by the Independents, the Commission concluded that âthe public interest reasonably requiresâ that the status quo (i. e., the continuing effectiveness of ORP) be changed.' In particular, the Commission believed that the public interest demanded cessation of New Englandâs opportunity, in effect, to force the continuance of ORP, despite the Commissionâs conclusion of its inequities, by a resort to the expedient that New England âon the one hand, . . . refrain[s] from developing and filing a uniformly applicable âbetweenâ exchanges ânon-tollâ tariff containing rates and charges for . ânon-tollâ services applicable to its Bell customers and in which the Independents can concur and make the same rates and charges applicable to . customers [of Independent Companies]; and on the other hand, take[s] the position that either (a) the present composite âlocal serviceâ rates cannot be divided to obtain the EAS/ELS portion of such rate for revenue contribution and settlement purposes, or (b) that the .methods of division proposed are unsound without recommending a method of division Bell considers sound.â Such technique the Commission characterized as New Englandâs âeffectively block [ing] reasonably comparable treatment of Bell and Independent Company customers in this State desiring to receive or receiving âbetweenâ exchanges ânon-tollâ services.â Sixth, to break this continuing obstruction to the adoption of any new EAS/ELS settlement plan, the Commission promulgated, in the public interest, a settlement *901 plan of its own, to be operative on an interim basis and designated by the Commission as the âInterim Maine EAS/ELS Settlement Plan.â According to the Commission; (1) it is clearly not just or reasonable âthat the New England Telephone Company, serving approximately 90% of the telephones in the State of Maine because of its dominant position should be permitted to continue to exclude the subscribers of the Independent telephone companies to their economic detriment, constituting only 10% of the telephones in this State, from receiving on a comparable basis âbetweenâ exchanges ânon-tollâ services any more than it would be just or reasonable to treat the customers of the Independents, constituting 10% of the telephones in this State, differently with respect to âbetweenâ exchanges âtollâ service and (2) hence, the âInterim Maine Planâ of the Commission represents an attempt to achieve a solution based on the fundamental principle âestablishing equity among and between telephone customers in the State of Maine.â The full significance of this principle, in the Commissionâs view, is that âtelephone companies, although different corporate entitiesâ, are subject to the responsibility of providing âan integrated telecommunications system to telephone customers within this Stateâ; and, therefore, they have a âresponsibility of equitable and non-discriminatory treatment of telephone customers [which] extends not only to the customers of one corporate entity, but to customers of all telecommunications of corporate entities within the State of Maine, to the end that customers substantially similarly situated should receive comparable and substantially similar treatment in measuring the degree of the relative burden the various classes of customers might reasonably be expected to assume by the way of paying rates and charges for âbetweenâ exchanges services, whether it is classified as âtollâ or ânon-tollâ.â Seventh, having thus delineated the philosophy and controlling general principles of its âInterim Maine Planâ, the Commission made findings that (1) settlements by New England (Bell) to the Independents shall recognize âthe Independentsâ relative contribution of . investment in plant and associated expenses, allocated or assigned to EAS or ELS operations in the State of Maineâ and (2) âthe contribution of the Independents by way of investment and expenses in exchange plant, allocated or assigned to ELS/EAS operations in the State of Maine, is $.022 per minute of originating EAS/ELS minute of use, and $.022 per terminating EAS/ELS minute of useâ as compared with $.009 in each of the foregoing categories for New England (Bell). Using these figures as a foundation, the Commission then presented, in detail, formulas and calculating methodology by which data essential to the determination of equitable settlement amounts should be developed. Eighth, the Commission ordered that action be taken by New England, in conjunction with the Independents, as follows: (1) by following the specifications of the findings (above summarized), they âdevelop in the most expeditious, mutually acceptable mannerâ the informational dataâ this to be done prior to the expiration of ninety (90) days, in order that (2) âwithin ninety (90) days they furnish to . [the] Commission ... an estimate of settlement amounts that will result from the use of [the] data developed . . .â this to be embodied in a schedule showing, in addition, âmonthly EAS/ELS settlement *902 amounts presently being received under existing EAS/ELS settlement agreements.â Ninth, and finally, the Commission announced that after the completion of the aforesaid action by New England and the Independents, the Commission, to avoid âsudden economic impact on any companyâ and âto bring about a smooth transition from present proceduresâ, would by further supplemental decree âset the effective date or dates when . . . [any] payments in whole or in part shall commence.â 6 11-A The Motion To Dismiss the Section 305 âComplaintâ Proceeding We consider initially the motion (of the Independents and the Commission) to dismiss New Englandâs Section 30S âcomplaintâ proceeding. II-A-(l) As to the first of the two grounds underlying this motion â that the Section 305 âcomplaintâ proceeding is âprematureâ, âwe note, at the outset, that the literal language of Section 305 reposes jurisdiction in the Law Court in relation to âany ruling or order of the commissionâ (emphasis supplied) the âconstitutionalityâ of which is, as here, âin issue.â In this respect, the language of Section 305 is, on its face, immediately and directly in contrast with the wording of Section 303 by which the âappealâ jurisdiction of the Law Court âon questions of lawâ is restricted to âa final decision of the commissionâ (emphasis supplied), and as to which the statute explicitly analogizes the jurisdiction of the Law Court to that conferred in âan appeal from a judgment of the Superior Court in a civil action.â This explicit language differentiation suggests, prima facie, that the Legislature intended the Section 305 remedy by âcomplaintâ to be available notwithstanding that a Commission âruling or orderâ, attacked for constitutional infirmity, might not have attained âfinalityâ â in the sense signified by that concept (in contradistinction to âinterlocutorinessâ) as it is utilized to prescribe when an âappealâ will lie from a Superior Court âjudgmentâ entered in a âcivil action.â The prima facie indication is confirmed by historical developments reasonably cognizable as factors contributing to the enactment of Section 305. Persons whose rights were being affected in particular respects in proceedings before administrative agencies had always been afforded opportunity to invoke collateral judicial interposition. Most often, such collateral judicial intervention was accomplished through resort to principles of equity jurisdiction (although at times other appropriate judicial power, applicable in the premises, might be asserted); and it was predicated on the basis that âerrors of lawâ of a special nature rendering the administrative action âinvalidâ â as constituted by lack, or excess, of âjurisdictionâ, or by unconstitutionality (including arbitrariness, confiscation or other violation of constitutional rights and guarantees) â had occurred. Spoffard, Petâr. v. Bucksport & Bangor Railroad Company, 66 Me. 26 (1876); New York ex rel. Consolidated Water Co. v. Maltbie, 303 U.S. 158 , 58 S.Ct. 506 , 82 L.Ed. 724 (1938). See: (Hamilton v. Caribou Water, Light & Power *903 Company, 121 Me. 422, 426 , 117 A. 582 (1922); S. D. Warren Company v. Maine Central Railroad Company, 126 Me. 23, 25 , 135 A. 526 (1926); Casco Castle Company Petâr., 141 Me. 222, 225 , 42 A.2d 43 (1945). 7 Such collateral judicial intervention into the proceedings of administrative bodies could occur even though the administrative processes had not been fully completed or the status of the proceedings, at the time of the collateral judicial attack, might have been regarded as âinterlocutoryâ rather than âfinalâ (as measured by the âfinalityâ standard operative to delineate when, within the internal structure of the judicial system itself, a higher Court would review a lower Courtâs âjudgmentâ). Leedom et al. v. Kyne, 358 U.S. 184 , 79 S.Ct. 180 , 3 L.Ed.2d 210 (1958); Western Pennsylvania Hospital v. Lichliter, 340 Pa. 382 , 17 A.2d 206 (1941); Howard Co. Jewelers v. New Jersey State Board of Optometrists, 133 N.J.Eq. 4, 29 A.2d 742 (1943). See: Shields v. Utah Idaho Central Railroad Co., 305 U.S. 177 , 59 S.Ct. 160 , 83 L.Ed. 111 (1938). Correlatively, however, the complexities of life during, and subsequently to, the fourth decade of the twentieth century were indicating a need that larger and more unhampered range be afforded the administrative process, and a tendency set in toward constriction of the availability and scope of collateral judicial interposition into the ordinary course of administrative proceedings. Illustrative of this public policy is the decision in Alabama Public Service Commission v. Southern Railway Company, 341 U.S. 341 , 71 S.Ct. 762 , 95 L.Ed. 1002 (1951) narrowing the exercise of the equity jurisdiction of the federal District Courts in relation to State administrative tribunals. A particularized aspect of such policy to limit collateral judicial intervention in the administrative process is reflected in Maine, specifically in relation to the Maine Public Utilities Commission, by the case of Stoddard v. Public Utilities Commission, 137 Me. 320 , 19 A.2d 427 (1941). As an actual decision confined to its strict facts Stoddard, supra, really signified nothing new in principle. It (1) reaffirmed the traditional doctrine that when the Public Utilities Commission âexceeds its authority it acts without jurisdiction and its orders are of no effect and are subject to collateral attackâ (p. 323, 19 A.2d p. 428) on the basis of the usual principles governing equity jurisdiction; and (2) decided on the special facts involved that conventional equity jurisdiction was lacking because the remedy provided at law (i. e., the remedy of âappealâ under then R.S.1930, Chapter 62, Section 63, now 35 M.R.S.A. § 303) was entirely adequate for decision of the non-constitutional issue being raised. 8 *904 Notwithstanding the unquestionable correctness of the actual decision in Stoddard, the case precipitated a problem because of the presence in the opinion of general language suggesting a broad principle that the special âappealâ provided by statute for the review of Public Utilities Commission decisions was legislatively intended as the âexclusiveâ method of judicial scrutiny of Public Utilities Commission action. By this language in Stoddard a likelihood was projected that Stoddard could be interpreted to have eliminated collateral judicial intervention, through the exercise of equity proceedings, even in the multitudes of situations in which the âappealâ remedy is really inadequate either because: (1) the statutory âappealâ being available only from a âfinalâ (rather than âinterlocutoryâ) order, the appeal might not lie, in many instances, to permit review of invalid or unconstitutional administrative action not yet âfinalâ until a time too late to avoid imminently irreparable injury or (2) even if the administrative order be âfinalâ, the scope of the âappealâ had become defined, OâDonnell, Petâr., 147 Me. 259 , 86 A.2d 389 (1952) and earlier cases cited therein, to exclude the constitutionally required independent judicial judgment on the facts (as well as the law) material to the adjudication of constitutional issues. 9 In light of the foregoing background, we find it reasonable to attribute as a primary purpose of the Maine statute, as first enacted in 1953 and amended in 1961 10 and all as now embodied in Section *905 305, a definitive relationship to the authorization of collateral judicial scrutiny, through the exercise of equity jurisdiction, of the administrative processes of the Public Utilities Commission. Regardless of whether the language âjustness or reasonablenessâ concerning ârates, tolls or chargesâ might be thought to extend beyond the constitutional concept connoted by the word âconfiscationâ, â and thus might include errors other than those of constitutional dimension which might produce âunjustness or unreasonablenessâ in any rate, toll or charge of a public utility, (an issue which we need not presently decide), 11 â it is undisputed that under Section 305 all constitutional issues precipitated by âany ruling or order of the commissionâ (emphasis supplied) are placed within a jurisdiction, sounding in equity, conferred upon the Law Court. Further, it is likewise beyond question that such Law Court jurisdiction exists under Section 305, ânotwithstandingâ the availability of the remedy by âappealâ for âerrors of lawâ as provided in Section 303. Such plain provisions of Section 305, in view of the historical antecedents, reveal, as the reasonable import of the statute, a legislative reaffirmation in the specific context of the Public Utilities Commission of a continuing availability of the equity jurisdiction which was operative traditionally, (1) if an administrative ruling, or order, was claimed unconstitutional and, therefore, invalid â the remedy at law being inadequate, as it is under the Section 303 âappealâ because it fails to allow independent judicial judgment as to the âconstitutionalâ facts OâDonnell, Petâr., supra, (irreparable damage being generally imputed) ; and (2) which could be invoked before the administrative process might have arrived at a terminal point identifiable as âfinalâ (rather than âinterlocutoryâ) as measured by the purposes generally contemplated for the undertaking of direct judicial review of Court judgments. Furthermore, Section 305 is reasonably to be interpreted as clear legislative reassurance that the general language appearing in Stoddard, supra, â purporting to delineate the âspecial remedy by statuteâ of an âappealâ (under then R.S.1930, Chapter 62, Section 63, now 35 M.R.S.A. § 303) as âexclusiveâ â lacks the force of law, at least in any situation in which constitutional infirmities are being asserted as to âanyâ ruling or order, âfinalâ or otherwise, of the Public Utilities Commission. Such objectives, reasonably attributable to the Legislature in its original enactment in 1953 of the substance of what is presently the first paragraph of Section 305, may be taken to have been corroborated in 1961 when, by P.L.1961, Chapter 300, the Legislature introduced the present second paragraph of Section 305 authorizing, inter alia, the Law Court, in relation to constitutional issues, to âorder such additional evidence as it deems necessary for the determination of such issues.â The Legislature thus afforded to the Law Court the fullest opportunity adequately to discharge a responsibility, reasonably interpretable as constitutionally imposed, of evaluating and deciding alleged constitutional infirmities in administrative action by an independent judicial judgment as to facts (as well as law), unhampered by inadequacies which the Court might find to exist in the record of the proceedings as made before the Commission. 12 *906 By such action in 1961, in short, the Legislature may reasonably be said to have focused further upon, and to have highlighted, the potential inadequacy of the statutory remedy by âappealâ under Section 303 for the decision of âconstitutionalâ issues as raised by âany ruling or orderâ of the Public Utilities Commission âthereby (1) confirming the need that any ruling or order raising constitutional questions be subject to collateral judicial scrutiny in equity, and revealing the designation of the Law Court as the judicial instrumentality to accomplish satisfaction of the need and (2) reinforcing the ability of the Law Court adequately to discharge its newly conferred responsibility by being empowered to order the taking of additional evidence (before the Commission) where necessary. The foregoing analysis thus reveals with abundant clarity that historical antecedents, as well as the literal language of the statute, establish that Section 305 confers upon the Law Court a jurisdiction, sounding in equity, â with explicit authority conferred upon the Law Court âto enjoin or stayâ â to decide the constitutionality of any ruling or order of the Public Utilities Commission regardless of whether the order might have been forthcoming before the completion of the administrative tribunalâs processes or had achieved a status which could be deemed âfinalâ (whether in the conventional sense connoted by any statute, generally, authorizing âappealsâ from âfinal judgmentsâ of a Court or, specifically, the statute (35 M.R.S.A. § 303) authorizing an âappealâ from a âfinalâ decision of the Public Utilities Commission itself). 13 *907 We conclude, therefore, that the Independents (and the Commission) are wrong in their contention that the present Section 305 proceeding, notwithstanding that it claims the Commissionâs Order of May 24, 1972 to be invalid as unconstitutional, should be dismissed because it seeks to initiate judicial scrutiny of a Commission order which is not yet âfinal.â We decide that such showing of âfinalityâ is immaterial to the availability of the Law Court jurisdiction, sounding in equity, as conferred by Section 305 for the decision of the issues of constitutionality herein being raised by New England. Although, the âfinalityâ which might be requisite for âappealâ (as a direct judicial review, generally, of Court judgments or as a special direct judicial review by âappealâ, under 35 M.R.S.A. § 303, of âfinal decisionsâ of the Public Utilities Commission) is thus not a precondition of the Law Courtâs jurisdiction under Section 305, it fails to follow that the interposition of the Law Court may be invoked, through the mechanism of a claim of constitutional infirmity, under Section 305 in relation to any action of the Public Utilities Commission or at any stage of its proceedings. There has developed, separate from the âfinalityâ principle applicable in the conventional âappealâ situations, an independent principle which controls the appropiateness of collateral judicial intervention in the activities of administrative bodies, â a principle predicated on whether the action of the administrative tribunal has achieved the stage at which it might be thought "ripe" for judicial consideration and action. 14 The ripeness requirement, as analyzed by Professor Louis L. Jaffe in an excellent and comprehensive Chapter on âRipeness and Reviewable Ordersâ (Chapter 10 at pp. 395, et seq.), as contained in his Treatise, âJudicial Control of Administrative Actionâ â (See also: âRipeness and Reviewable Orders in Administrative Lawâ, Jaffe, 61 Mich.L.R. 1273) â is described: (1) â. . . as not so much a definable doctrine as a compendious portmanteau, a group of related doctrines arising in diverse but analogically similar situations. In its most general sense ripeness is a requirement not of the administrative action to be reviewed but of the judicial controversy between the plaintiff and the agencyâ (Id. p. 395) and (2) in terms of the approach of equity (the approach which explicitly underlies Section 305) as involving the proposition that âJudgment should be keyed to the relative value of early and later review as determined by practical considerations of judicial competence, administrative efficiency and party need.â (Id. p. 411) *908 We hold that, within the foregoing general contours indicated by Professor Jaffe and as subject to further development on a case by case basis to meet individualized combinations of circumstances, there is operative, in relation to the jurisdiction reposed in the Law Court under Section 305, a principle of âripenessâ by which the Law Court may control the appropriateness of its judicial intervention into proceedings before the Public Utilities Commission; and this principle of âripenessâ functions not to prescribe a lack of jurisdiction in the Law Court but as a guide, deriving from judicial self-restraint, to the Law Courtâs exercise of a jurisdiction avowedly existing under Section 305. We interpret the Independents (and the Commission), by their claim of âprematurityâ in the present Section 305 proceeding, to be making the additional contention that the actions of the Public Utilities Commission, as here involved and attacked for constititional infirmities, are not yet in a posture âripeâ for judicial consideration and determination by the Law Court â even though it be recognized that 35 M.R.S.A. § 305 permits Law Court review of a âruling or orderâ of the Public Utilities Commission not yet âfinal.â We conclude that, in the present circumstances, the contention of âprematurityâ, as constituted by an alleged lack of âripenessâ, is without merit. The Commission action here sought to be subjected to judicial scrutiny is patently an âorderâ not only in form but also in its extensive substance (Cf. United States v. Los Angeles & Salt Lake Railroad Company, 273 U.S. 299 , 47 S.Ct. 413 , 71 L.Ed. 651 (1927)), as clearly appears from our prior summary of its content; and it is an âorderâ which commands New England (as well as the Independents) to take specific action within prescribed time limits immediately operative. Further, the action required of New England â that it undertake traffic measurements and cost studies and' computations thereby to develop the data to be provided the Commission as a basis for the further implementation of the Commissionâs announced plan â imposes upon New England an immediate financial burden sufficiently large to justify the conclusion that if, as New England contends, it results from unconstitutional action by the Commission, considerations of equity require that it be prevented. Finally, the Commissionâs Order of May 24, 1972 reveals an avowed commitment by the Commission to effectuate its own plan in accordance with controlling principles, formulas and computations meticulously prescribed in the Order. âą Thus, the âOrderâ is not merely an abstract, tentative declaration by the Commission; it is a concrete, firm disposition of rights and obligations of the parties affected by the Commissionâs plan in form and substance sufficiently definitive to be suited to a judicial evaluation and determination of the constitutional issues it precipitates. 15 *909 In such circumstances we decide that judicial scrutiny should not be postponed until such time as the Public Utilities Commission might see fit to complete its present proceedings and subject New England to the ultimate impact of a future and âfurther supplemental decreeâ in which, as the Order of May 24, 1972 states, the Commission âwill set the effective date or dates when such payments [of the settlement amounts arrived at pursuant to the implementation of the Commissionâs Plan] in whole or in part shall commence.â The actions of the Commission, as embodied in the May 24, 1972 Order here being attacked for constitutional infirmity, present a subject-matter sufficiently âripeâ for evaluation and determination by the Law Court within its jurisdiction as conferred by Section 305. II-A(2) The foregoing analysis, rejecting âprematurityâ as a ground for dismissal of the Section 305 proceeding, establishes, in similar vein, the unsoundness of the contention of the Independents (and the Commission) that the Section 305 proceeding must be dismissed because New England â. . .by electing to appeal the Commissionâs decision [under Section 303] . has waived or barred its rights concurrently to file a Section 305 complaint.â On the hypothesis, arguendo, that the Commissionâs Order of May 24, 1972 might have âfinalityâ sufficient to allow the Section 303 âappealâ to lie (a proposition which, as will appear, we find it unnecessary presently to decide, see infra p. 913), 16 the Section 303 âappealâ fails, as we have seen, to allow the Law Court to evaluate and decide constitutional issues by use of independent judicial judgment of âconstitutional factsâ, OâDonnell, Petâr., 147 Me. 259 , 86 A.2d 389 (1952) (and cases cited therein). Yet, such expanded review by the Law Court is the dominant objective of the Section 305 âcomplaintâ (in equity) proceeding. Precisely because, as to the constitutional issues raised by New England, the Section 305 âcomplaintâ provides a latitude of judicial scrutiny broader than that of the Section 303 âappealâ, New Englandâs resort to a Section 303 âappealâ must here be held without legal impact as a âwaiverâ or âbarâ in relation to the further right of New England concurrently to invoke the Section 305 âcomplaintâ jurisdiction of the Law Court. Central Maine Power Company v. Public Utilities Commission, 156 Me. 295 , 163 A.2d 762 (1960). The Independents (and the Commission) maintain that the 1961 amendment adding a second paragraph to Section 305 â under which the Law Court is empowered, as an incident of its review of constitutional issues, to order the taking of additional evidence before the Commission â deprives Central Maine Power Company, supra, of precedential validity and requires a conclusion that, since 1961, use of the âappealâ under Section 303 precludes a concurrent (or subsequent) Section 305 âcomplaintâ proceeding. We find the contention untenable. It rests on the premise that the authority of the Law Court to require additional evi *910 dence creates the potential of a record in the Section 305 âcomplaintâ proceeding different from that in the Section 303 âappealâ, with consequent dangers of inconsistency. 17 That we may hypothesize various combinations of particular concrete circumstances tending to develop the possibility of inconsistencies (or duplications) in Section 303 âappealâ and Section 305 âcomplaintâ proceedings in the Law Court cannot validly justify a principle â to be operative with generalized, automatic and absolute effect â that the initiation of a Section 303 appeal, eo ipso, must preclude a concurrent (or subsequent) undertaking to prosecute a Section 305 complaint proceeding â particularly since the Section 303 âappealâ is more restricted in the allowable judicial scrutiny of constitutional issues than the Section 305 âcomplaint.â Individualized situations in which a partyâs actions as to a Section 303 âappealâ might present a particular factual matrix showing a true âwaiverâ of the Section 305 right, in the sense of an intentional relinquishment of it as a known right, or otherwise barring it under the special legal principles of âforfeitureâ, âelectionâ, âes-toppelâ or âres adjudicataâ, may be left to be decided as they might arise. In the present situation, however, and even should it eventuate that the Commissionâs Order of May 24, 1972 is a âfinalâ order âappealableâ under Section 303, the concurrent undertaking of New England to proceed with a Section 305 âcomplaintâ allows the Law Court a full flexibility of control over the continuing course of the two proceedings. Thus, even though there should be additional evidence ordered in the Section 305 proceeding, the Law Court, by its supervisory power over its own docket, can prevent any likelihood that the Court might be reviewing the same constitutional issues on differing records; and the Court will be able, generally, to ensure that all the legal issues (constitutional and otherwise) being raised are adequately decided, without duplications or inconsistencies, by appropriate allocation of the issues between the two proceedings in accordance with the authorized ranges of review, respectively, which they embrace. That New England has undertaken a Section 303 âappealâ from the Commissionâs Order of May 24, 1972 does not, in the present situation, preclude New England from a concurrent resort to a Section 305 âcomplaintâ proceeding seeking Law *911 Court determination of constitutional issues. II-B The Motion for Additional Evidence in the Section 305 âComplaintâ Proceeding We now consider the motion of New England, filed in the Section 305 proceeding, requesting the Law Court to order additional evidence asserted to be critical to the decision of the constitutional issues raised. Our examination of the record made before the Commission confirms the contention of New England that additional evidence bearing upon the constitutionality of the substance, and the practical effects, of the plan promulgated by the Commission is necessary to allow this Court adequately to fulfill its responsibility to decide the constitutional issues by an exercise of independent judicial judgment on the facts as well as the law. The record corroborates the assertions of New England that the Commission plan (1) is ânot a compromise between the Originating Responsibility Plan and the Independentsâ plan on which the Record focusedâ but is, relative to each of those plans, essentially new and unique in its philosophy and its principles; and (2) was promulgated by the Commission without prior indication sufficient to enable the parties reasonable time to anticipate that it would be forthcoming â with the result that the record, as it presently exists, is âbarren of any evidence either in support of or against the Commissionâs Plan which can be scrutinizedâ by the Law Court to allow it to exercise independent judgment as to the facts critical for the evaluation and decision of the constitutionality of the Commissionâs plan in its controlling principles and applications. Moreover, there was a substantial gap in time (more than one year) from the date of the close of the evidence before the Commission (May 4, 1971) to the date of the Commissionâs Order of May 24, 1972, as well as a further gap of an additional four months to the time (October 1972) when the Law Court heard oral argument on the motion for the taking of additional evidence. The Law Court is thus entirely uninformed as to the potential materiality of changes or developments which, according to New England, occurred during the prolonged periods from May 4, 1971 to May 4, and October, 1972. This creates the clear need for an âupdatingâ of the evidence to permit the Law Court to be informed, and evaluate the constitutional significance, of any factual changes or developments. We conclude, therefore, that New Englandâs motion for additional evidence should be granted to allow the taking of further evidence in kind and scope as follows: (1) evidence bearing upon whether the Commissionâs âInterim Maine Planâ in practical operation would require New England, its stockholders and its rate payers to subsidize EAS/ELS service to Independent Telephone Company exchanges; (2) evidence of the costs which would result to New England and its stockholders and rate payers were the Commissionâs plan to be effectuated; (3) evidence relevant to an adequate understanding of whether the Commissionâs plan in its philosophy, principles and practical effect might be considered to go beyond the legitimate bounds of constitutional governmental regulation of a privately owned utility business; 18 and (4) evidence of any facts, *912 changes or developments occurring subsequent to the close of the evidence before the Commission (May 4, 1971) and which may be considered relevant to the constitutional issues raised concerning the Commissionâs plan. Accordingly, the Public Utilities Commission is herewith directed promptly to take out evidence, in accordance with the foregoing delineations, from New England and any other of the parties who might wish to present evidence. After it has heard and taken such additional evidence the Commission, as it deems appropriate by reason thereof, is authorized, in accordance with Section 305, to modify its original findings, conclusions and Order, or to make new findings and conclusions and a new Order. The Commission shall report all the additional evidence which it has taken to the Law Court promptly and in manner such that, as required by Section 305, â . . . the proof may be brought as nearly as possible down to the date of its report thereof to the court.â If the Commission has modified its original findings of fact or made new findings of fact, or modified its original Order, or made a new Order, it shall file' with the Law Court such modified findings of fact or Order or such new findings of fact or Order, if any. Reserved to all parties are the rights provided under Section 305 in rĂ©lation to such changed, or new, findings of facts or orders, including the right to filĂ© âspecification of errorsâ as additional matter to be considered by the Law Court during the further course of the Section 305 âcomplaintâ proceeding. Ill The Motion to Dismiss the Section 303 "Appeal.â The third motion presently before us, the motion of the Independents (and the Commission) for dismissal of New Englandâs âappealâ under Section' 303, remains for consideration. In our prior discussion we emphasized that in the present situation, in which both the âappealâ under Section 303 .and the *913 âcomplaintâ proceeding under Section 305 have been brought before the Law Court concurrently, the Court has opportunity fully to control the continuing course of the proceedings to avoid potential duplication or inconsistency. We have already decided, supra, that (1) the Section 305 âcomplaintâ proceeding is validly before us regardless of whether the Section 303 âappealâ has been properly brought (as dependent upon whether the Commissionâs Order of May 24, 1972 might be held to be âfinalâ within the meaning of Section 303); and (2) as an incident of the Section 305 âcomplaintâ proceeding, the Commission shall take out additional evidence by reason of which the Commission is empowered, as it might deem appropriate, to come forward with changed, or new, findings of fact or orders. Such decision creates various possibilities reasonably to be projected concerning the further course of the Section 303 âappealâ proceeding. In particular, it could eventuate that (1) further action of the Commission might well have deprived the Order of May 24, 1972 of the âfinalityâ, if any, it might have had when originally issued, and (2) New England- â in light of a new posture which might be assumed by the Section 303 âappealâ and the Section 305 âcomplaintâ proceeding after the Commission has completed the taking of additional evidence â will find it unnecessary to press the Section 303 âappeal.â In addition to these not unlikely eventualities there seems need, in any event, that the âappealâ should presently be held in abeyance and should remain pending on the Law Courtâs docket to await the completion of the taking of new evidence in the Section 305 âcomplaintâ proceeding. This is plainly necessary to avoid (a) potential duplication of effort, (b) possibilities of variations in the contents of records and (c) incompleteness in the judicial evaluation of constitutional issues (as raised in the Section 303 âappealâ) because of the limitations upon the scope of the âappealâ to deal with âconstitutional facts.â Hence, we conclude that it is presently unnecessary and inappropriate that we decide whether the Commissionâs Order of May 24, 1972 is a âfinal decisionâ, within the meaning of Section 303, qualifying it as subject to the âappealâ therein prescribed; and whether if the âOrderâ is not thus âfinalâ, the motion of the Independents (and the Commission) to dismiss the Section 303 âappealâ should be granted. In the exercise of our supervisory power to control our own docket, we, therefore, retain the motion on the docket of the Law Court as pending, without decision, and continued until further Order of Court. 1 â The entries (for the docket of the Law Court) are: (a) The motion to dismiss the 35 M.R. S.A. § 305 âcomplaintâ proceeding is denied; (b) the motion in the 35 M.R.S.A. § 305 âcomplaintâ proceeding for the taking of additional evidence is granted ; and the additional evidence is to be taken out by the Commission in manner and scope, and with rights reserved to the Commission and all parties, as set forth in the opinion herein; and (c) the motion to dismiss the 35 M.R.S. A. § 303 appeal is continued until further order of court. 2 â The Commission is directed to act promptly pursuant to the opinion herein. So ordered. WEBBER, J., sat at oral argument, but did not participate in the decision. 1 . This statute provides in part: âIf . telephone or telegraph companies do not agree upon the division between them of the cost of . . . physical connection or connections or the division of the joint rates, tolls or charges established by the commission over through lines, the commission shall have authority, after . . . hearing, to establish such division by . . . order.â 2 . The Commission has revealed that it considers these different designations to refer to a single underlying service by which, as instituted by one or more telephone companies, âthe local (non-toll charge calling area of an exchange is enlarged by expanding the local (non-toll charge) calling area by combining it with one or more additional exchanges in order to eliminate the toll charges on individual messages.â According to the Commission, the Independents in their tariffs refer to this service as âExtended Area Service (EAS)â, but recently New England changed its tariff references to the service to label it âExtended Local Service (ELS).â Viewing the underlying service to be tbe same notwithstanding the duality of appellations, the Commission employed the single symbol, âEAS/ELS.â The Court will use the same designation throughout this opinion. EAS/ELS is provided in the State of Maine in three different contexts: (1) by New England between two or more of its own exchanges (e. g., toll free calls between New Englandâs âPortlandâ and âWindhamâ exchanges) and which (because New England is an operating part of the Bell system) is generally designated âB-B EAS/ELSâ; (2) by a given Independent (non-Bell) Telephone Company between its own exchanges (e. g., toll free calls between Lewiston, Greene and Monmouthâs âWintliropâ and âGreeneâ exchanges) so-called âI-I EAS/ELSâ and *898 (3) by New England and an Independent, acting together (e. g., toll free calls between New Englandâs âAugustaâ and Lewiston, Greene and Monmouthâs âWintliropâ exchange) so-called âB-I EAS/ELS.â 3 . 35 M.R.S.A. Section 303 states : âAn appeal from a final decision of the commission may be taken to the law court on questions of law in the same manner as an appeal from a judgment of the Superior Court in a civil action.â 4 . Section 305 provides: âNotwithstanding section(s) 303 . . ., in all cases in which the justness or reasonableness of a rate, toll or charge by any public utility or the constitutionality of any ruling or order of the commission is in issue, the law court shall have jurisdiction upon a complaint to review, modify, amend or annul any ruling or order of the commission, ... to the extent of the unlawfulness of such ruling or order.â 5 . ORP, ns the Commission viewed it, is based on the principle that âeach company pays the fully allocated cost of originating and carrying to the point of termination the EAS/ELS calls its customers initiate for the time duration of the EAS/ELS telephone connection established.â The Commission further criticized ORP as âfallaciousâ in principle because âthe purpose of holding the telephone communication is to permit a two-way communications pathâ and, therefore, âonce a telephone connection is established, it is absolutely immaterial . . . which party to the connection initiated the attempt to establish the connection.â The Commission specified: âas a matter of fact, that there is a mutual benefit to each party to the ELS/EAS telephone connection, and that the benefit or value does not solely and exclusively accrue to the party . . . originating] or attempt [ing] to establish the connection.â 6 . On August 21, 1972 the Commission ordered that the 90 day period be stayed âfor a period of seven (7) days from the date of August 24, 1972, or until further order of this Commission.â On September 25, 1972 the Commission extended the time for the furnishing of the (lata until November 27, 1972 and prescribed additional methodology for development of the estimates specifically in relation to the determination of âoriginating and ter-inating EAS/ELS minutes of use.â 7 . Indeed, it had been held that there was even equity power reposing in the federal District Courts (if there existed diversity of citizenship or âfederal questionâ jurisdiction) to have the actions of an administrative body of a State subjected to judicial scrutiny when the administrative action was claimed âinvalidâ for jurisdictional or constitutional infirmity. See: Alabama Public Service Commission v. Southern Railway Company, 341 U.S. 341, 344, 345 , 71 S.Ct. 762 , 95 L.Ed. 1002 (1951); Smyth v. Ames, 169 U.S. 466, 516 , 18 S.Ct. 418 , 42 L.Ed. 819 (1898); Willcox v. Consolidated Gas Company, 212 U.S. 19, 40 , 29 S.Ct. 192 , 53 L.Ed. 382 (1909); Bacon v. Rutland Railroad Co., 232 U.S. 134, 137 , 34 S.Ct. 283 , 58 L.Ed. 538 (1914); Detroit and Mackinac Railway Company v. Michigan Railroad Commission, 235 U.S. 402 , 35 S.Ct. 126 , 59 L.Ed. 288 (1914); Oklahoma Natural Gas Company v. Russell, 261 U.S. 290, 293 , 43 S.Ct. 353 , 67 L.Ed. 659 (1923); Prendergast v. New York Telephone Co., 262 U.S. 43, 47 , 43 S.Ct. 466 , 67 L.Ed. 853 (1923); Pacific Telephone & Telegraph Company v. Kuykendall, 265 U.S. 196, 201 , 44 S.Ct. 553 , 68 L.Ed. 975 (1924); Railroad and Warehouse Commission of Minnesota v. Duluth Street Railway Company, 273 U.S. 625, 628 , 47 S.Ct. 489 , 71 L.Ed. 807 (1927). 8 . In Stoddard the order was manifestly âfinalâ, even as tested by the âinterlocutory-finalâ criterion to define a âjudgmentâ as ready for direct review by *904 âappealâ, and was, therefore, plainly subject to the âappealâ remedy conferred by then R.S.1930, Chapter 62, Section 63 (now 35 M.R.S.A. § 303). Further, since the issue raised concerned only the statutory âjurisdiction" of the Commissionâ as involved in an interpretation of the âgrandfatherâ clause of the State statute subjecting contract carriers engaged in the trucking business to Public Utilities Commission regulation and control, no constitutional issue was presented as to which â pursuant to the doctrine deriving from cases such as Ohio Valley Water Company v. Ben Avon Borough, 253 U.S. 287 , 40 S.Ct. 527 , 64 L.Ed. 908 (1920); Crowell v. Benson, 285 U.S. 22 , 52 S.Ct. 285 , 76 L.Ed. 598 (1932); and St. Joseph Stock Yards Company v. United States, 298 U.S. 38 , 56 S.Ct. 720 , 80 L.Ed. 1033 (1936) â argument might be made to justify collateral judicial scrutiny jurisdiction (Cf. New York ex rel. Consolidated Water Co. v. Maltbie, 303 U.S. 158 , 58 S.Ct. 506 , 82 L.Ed. 724 (1938)) in that (1) it is constitutionally requisite that there be an independent judgment of a Court upon the fads (as well as the law) incident to that part of the (general) unlawfulness created by alleged unconstitutionality of administraitve action, and (2), hence, the remedy by âappealâ, as operative to review issues of law without independent judicial judgment as to the facts material to the disposition of constitutional issues, would be constitutionally inadequate. 9 . Were Stoddard to be taken as importing such total exclusion of collateral judicial authority to intervene in the administrative processes, especially through resort to traditional equity powers and principles, Stoddard would project a serious constitutional problem insofar as the scope of the âappealâ remedy precludes opportunity for an independent judicial judgment on the facts material to constitutional deficiencies and, hence, the Stateâs action in purporting to make it exclusive could be a denial of a constitutionally required independent judicial evaluation and judgment of facts essential to the appropriate determination of constitutional issues, whether of confiscation of property or otherwise. See: Opinion of the Justices, 328 Mass. 679 , 106 N.E.2d 259 (1952). Cf. New York ex rel. Consolidated Company v. Maltbie, 303 U.S. 158 , 58 S.Ct. 506 , 82 L.Ed. 724 (1938). 10 . In 1953 the statute was worded to make plain that the jurisdiction sounded in equity, as invoked procedurally by an original petition in equity initiated in the Law Court. P.L.1953, Chapter 377, Section 3. The modification effected in 1961 by which under P.L.1961, Chapter 317, Section 94, the language âpetition in equityâ was supplanted by âcomplaintâ was a procedural alteration calculated to etab-lish only a procedural uniformity with the Rules of Civil Procedure which had become effective December 1, 1960. This procedural change must not be allowed to obscure the critical point that the substantive scope of the jurisdiction conferred upon the Law Court was governed by the principles of equity. 11 . There might well be doubt that intimations in Auburn Water District v. Public Utilities Commission, 156 Me. 222 , 163 A.2d 743 (1960) and Calais v. Calais Water & Power Co., 157 Me. 467 , 174 A.2d 36 (1961), bearing upon this issue, are correct. The appropriate resolution of the question must await a future ease in which it is squarely raised for decision. 12 . We reject the contention of the Independents (and the Commission) that in Alabama Public Service Commission v. Southern Railway Company, 341 U.S. 341 , 71 S.Ct. 762 , 95 L.Ed. 1002 (1951) *906 the Supreme Court of the United States definitively establishd that no federal constitutional problem would arise were a statute to require that a Court be confined to the record made before the Commission, notwithstanding that the Court might believe that, because of inadequacies in such record, the Court was precluded from an adequate independent judgment upon the facts material to its decision of constitutional issues. The statement in Alabama Public Service Commission v. Southern Railway Company, supra, that the Constitution does not require ârelitigationâ of factual issues was, it seems plain to us, a reference only to the absence of a federal constitutional mandate of a plenary ele novo evidentiary judicial hearing â as becomes particularly clear by the Courtâs discussion (in footnote 11 at p. 349, 71 S.Ct. 762 ) of the problem which appeared in the case of Bacon v. Rutland Railroad Co., 232 U.S. 134 , 34 S.Ct. 283 , 58 L.Ed. 538 (1914). See also: Central Maine Power Company v. Public Utilities Commission, et al., 156 Me. 295 , 163 A.2d 762 (1960) in which this Court had itself recognized that the constitutional obligation to provide independent judicial judgment as to the facts material to the decision of the constitutionality of the action of an administrative body (specifically the Public Utilities Commission) had been âreduced and abridgedâ (p. 299, 163 A.2d 762 ) to the extent that no plenary de novo evidentiary judicial hearing was constitutionally requisite and that, so far as possible, the reviewing Court should â . . . exercise the prescribed âindependent judgmentâ as to the facts . . . âinformed and aidedâ by findings of the Public Utilities Commission.â (P. 304, 163 A.2d p. 768) A decision that no constitutional issue arises when a State fails to require a plenary de novo evidentiary hearing as the basis for a requisite independent judicial judgment as to the facts material to the decision of constitutional issues falls far short of settling that it would likewise be constitutional for a State to deprive a Court, charged with the constitutional obligation of making an independent evaluation and judgment of the facts material to the decision of constitutional issues, of opportunity to have the record as made before the Commission supplemented by the taking of additional evidence should the Court believe such record inadequate to allow its own adequate independent judgment of âconstitutional facts.â This is the point cogently made by the Opinion of the Justices, 328 Mass. 679 , 106 N.E.2d 259 (1952). We agree with it. 13 . It might be arguable, in the light of the above analysis, that insofar as such equity jurisdiction under Section 305 is reposed in the Law Court to evaluate any constitutional issue arising from any ruling or order of the Public Utilities Commission, *907 whether âfinalâ or otherwise, â it should be held exclusive and as superseding the equity jurisdiction of the Superior Court for the same purposes. This argument could be buttressed by assertion of the need, previously discussed, to avoid undesirable wholesale interference with the administrative processes of the Public Utilities Commission through the raising of ingenious constitutional issues to justify invocation of the collateral intervention of individual judges endowed with equity powers. There might well be cogency to a contention that precisely to prevent such roving commissions the Legislature wisely chose to narrow the potential for intervention and to ensure that it not be undertaken too lightly â by conferring the equity jurisdiction as to constitutional issues relating to Public Utilities Commission activities exclusively upon the Law Court. This issue is not presently before us. Decision of it must await a case in which it is squarely raised. Our mention of the question is neither an expression, nor intimation, of opinion as to a correct disposition. 14 . The âripenessâ doctrine is theoretically distinct from the considerations of âappealâ âfinality.â The failure to recognize the differences tends to induce assessment of the meaning, and measurement of the scope, of one principle by the other, and can only lead to an erroneous attenuation of both principles with consequent serious confusions in practice. 15 . New England has maintained that constitutional issues arise, inter alia, because the Commissionâs plan is based on a general principle of cutting across the bounds defining separate legal corporate entities to impose a responsibility of equitable and non-discriminatory treatment of telephone customers extending not only to the customers of one corporate entity but to customers of all telecommunications of corporate entities within the State of Maine. New England maintains that such principle, and its implementation, produce a confiscation of the property of New England, its rate payers and stockholders, in violation of constitutional due process, insofar as, in New Englandâs language, âthe rate payers and stockholders of . . . New England . . . are being compelled to subsidize, for the benefit of independent rate payers and stockholders, the cost of EAS/ELS calling, not only on routes where one exchange is1 within and the other without the areas served by New England . . . but also on routes between two exchanges when both are completely outside any area served by *909 . . New England . . . and thus involve no New England . . . subscribers at all.â 16 . Clearly, if the Commission order were not thus âfinalâ, and the Section 303 appeal were premature, the conclusion would be a fortiori that the purported taking of the Section 303 appeal could not constitute a âwaiverâ of, or âbarâ to, tho right concurrently to prosecute the Section 305 âcomplaintâ proceeding. An attempt to seek a Section 303 âappealâ which fails for untimeliness could not, in sound theory or practical fairness, be regarded as a âwaiverâ or âbarâ (in any of the usual legal senses signified by those concepts) in relation to a Section 305 proceeding which would otherwise be in order. 17 . The Independents (and the Commission) have suggested that the statutory authorization to the Law Court to order additional evidence to assist independent judgment of the facts critical to the decision of constitutional issues, as a basis for modification or amendment (rather than entire nullification) of a Public Utilities Commission ruling or order, confers a legislative power upon the Law Court, a judicial tribunal, and thus causes a violation of the Maine Constitutionâs prohibition against the exercise of legislative power by a judicial tribunal. The claim is without merit. If it be assumed that the Public Utilities Commission, in its action now under scrutiny, was discharging a legislative function, on the analogy that it acts legislatively in fixing public utility âratesâ, it fails to follow that when a Court modifies or amends the Commissionâs ruling or order to remove from it any unconstitutional (and, therefore, âinvalidâ) aspects â and even if the Court utilizes evidence additional to the original record on which the Commission acted and exercises an independent judgment concerning âconstitutional factsâ, â the Court is acting legislatively. That such action is a judicial function was settled, in our view, as long ago as the decision in Marbury v. Madison, 1 Cranch (5 U.S.) 137, 2 L.Ed. 60 (1803) â and especially as conjoined with the further principle of âseverabilityâ which 'allows a Court to strike down portions of legislative action for unconstitutionality. Under the provisions of Section 305 the judicial functioning of the Court is the more strongly highlighted since it 4s the Public Utilities Commission which is directed to act to take out additional evidence ; and the Commission is empowered to make modified, or new, findings and orders in light of the additional evidence, before the Law Court proceeds with its Section 305 judicial scrutiny and arrives at its determinations thereunder. , 18 . We have refrained from ordering directly and explicitly that the Commission take out evidence of the nature described in item â(c)â of New Englandâs motion, to-wit: âevidence of the absence of any facts upon which the Commission might base statutory jurisdiction to order . . .â its plan. We have so acted because it is *912 not patently dear to us, at this juncture, that New England is correct in its effort to characterize action by the Commission ordering New England to make payments to the Independents in implementation of a plan beyond the Commissionâs âstatutory jurisdictionâ to promulgate as, ipso facto, an âunconstitutional taking of property without due process of law.â We have, therefore, chosen to avoid requiring the acceptance of such evidence by the Commission. Rather, we have left it open for the Commission, in the first instance, to reach a judgment as to whether such evidence as New England proposes to present to show lack of âstatutory jurisdictionâ bears reasonably upon questions genuinely constitutional in nature. It is our intention that such procedure will be available under our evi-dentiary item â(3)â, above, insofar as New England may undertake to satisfy the Commission that facts bearing upon absence of âstatutory jurisdictionâ are relevant to the ultimate issue of whether the âphilosophy, prineijdes and practical effectsâ of the Commissionâs plan trans-scend the bounds of âconstitutional regulation of a privately owned utility business.â We have used the same approach as to that portion of item â(d)â of New Englandâs motion in which it has sought to have an order for the taking out of âevidence that the Commissionâs plan is unjust and unnecessary, is contrary to established principles, and has no precedent anywhere . . . .â Here, too, there is serious question that such information, in and of itself, establishes, or is material to, alleged unconstitutionality of the Commissionâs plan. Under our said' item "(3)â above, therefore, it will be for the Commission to make the preliminary determination that the âunjustnessâ, âun-necessarinessâ and âcontra-precedentialâ or âunprecedentedâ novelty of theâCommissionâs plan bear materially upon the âconstitutional regulation of a priyately owned utility business.â
Case Information
- Court
- Me.
- Decision Date
- January 26, 1973
- Status
- Precedential