MEMORANDUM OPINION EMMET G. SULLIVAN, District Judge. Plaintiff Leroy Montgomery seeks judicial review of a February 4, 2005 determination by the Pension Benefit Guaranty Corporation (âPBGCâ or âagencyâ) that he is not entitled to benefits under the LTV Steel Hourly Pension Plan (âPlanâ), the successor to the Pension Plan for Hourly Employees of Youngstown Sheet and Tube Company and Affiliates (âYS & T Planâ). Although plaintiff acknowledges that he did not work sufficient calendar years to qualify for benefits under the YS & T Plan, he claims that he is entitled to benefits based on the number of hours he actually worked during that time. Pending before the Court is the PBGCâs Motion for Summary Judgment. Upon consideration of the motion, response and reply thereto, the applicable law, the entire administrative record, and for the reasons stated herein, the Court GRANTS the PBGCâs motion. I. Legal Framework A. Statutory Background The Employee Retirement Income Security Act of 1974 (âERISAâ or âActâ), 29 U.S.C. § 1001 et seq., is a âcomprehensive and reticulated statuteâ imposing a wide range of requirements on private pension plans. Nachman Corp. v. Pension Benefit Guar. Corp., 446 U.S. 359, 361 , 100 S.Ct. 1723 , 64 L.Ed.2d 354 (1980). One such requirement contained in ERISA is minimum vesting standards, which include a ceiling on the amount of time an employee may be required to work before his benefits vest. See 29 U.S.C. § 1053 (a)(2). These requirements were enacted to protect employees who were otherwise being denied access to benefits despite long periods of employment. See Holt v. Winpisinger, 811 F.2d 1532, 1536-37 (D.C.Cir.1987) (âOne of ERISAâs principal aims in reforming the Nationâs employee pension plans was to establish vesting ceilings so that employees with lengthy service would no longer lose accrued benefits simply because their employment terminated before they became eligible to retire.â). The vesting provisions contained in ERISA, however, apply only prospectively to âpersons actually employed when [ERISA] became effectiveâ on January 1, 1976. Cohen v. Martinâs, 694 F.2d 296, 298 (2d Cir.1982) (reasoning that because the vesting requirements in 29 U.S.C. § 1053 (a) refer to âemployeesâ and are subject to the applicability provision in § 1061(b)(2), which limits application to âplan years beginning after December 31, 1975,â § 1053(a)âs requirements apply only to individuals employed as of that date); Fremont v. McGraw-Edison Co., 606 F.2d 752, 755 (7th Cir.1979) (applying similar reasoning and concluding that § 1053(a) âonly protects against forfeiture the benefits of those who are in an employee status on January 1, 1976, or thereafterâ); see also Stewart v. Nat'l Shopmen Pension Fund, 563 F.Supp. 773, 777 (D.D.C.1983) (relying on above interpretations of the vesting requirements in distinguishing another ERISA provision on the basis that the latter provision referred to âparticipantsâ rather than âemployeesâ), revâd on other grounds, 730 F.2d 1552 (D.C.Cir.1984). *141 ERISA, through Title IV of the Act, also established a mandatory federal insurance program to protect certain private-sector employees and their beneficiaries from being âdeprived of anticipated retirement benefits by the termination of pension plans before sufficient funds have been accumulated in the plans.â Pension Ben. Guaranty Corp. v. LTV Corp., 496 U.S. 633, 637 , 110 S.Ct. 2668 , 110 L.Ed.2d 579 (1990) (quoting Pension Benefit Guar. Corp. v. R.A. Gray & Co., 467 U.S. 717, 720 , 104 S.Ct. 2709 , 81 L.Ed.2d 601 (1984)); see also Nachman Corp., 446 U.S. at 374 , 100 S.Ct. 1723 (âOne of Congressâ central purposes in enacting this complex legislation was to prevent the âgreat personal tragedyâ suffered by employees whose vested benefits are not paid when pension plans are terminated.â (footnote omitted)). In addition, Title IV created the PBGC, a wholly owned U.S. corporation that administers the insurance program. See 29 U.S.C. § 1301 et seq. Thus, â[w]hen a plan covered under Title TV terminates with insufficient assets to satisfy its pension obligations to the employees, the PBGC becomes trustee of the plan, taking over the planâs assets and liabilities. The PBGC then uses the planâs assets to cover what it can of the benefit obligations.â LTV Corp., 496 U.S. at 637 , 110 S.Ct. 2668 (citing 29 U.S.C. § 1344 ). The PBGC guarantees âall nonforfeitable benefits,â 29 U.S.C. § 1322 , which are defined as benefits âfor which a participant has satisfied the conditions of entitlement under the plan.â Id. § 1301(a)(8). When the PBGC becomes the trustee of a terminated plan, the agency obtains both plan and participant records and determines how much each participant is or will be due. Def.âs Mot. Summ. J. at 4. The agency then sends a determination letter to the participant, who may challenge the benefit determination by appealing to the PBGC Appeals Board. See 29 C.F.R. §§ 4003.21 , 4003.51. âIn reaching its decision, the Appeals Board shall consider those portions of the file relating to the initial determination, all material submitted by the appellant and any third parties in connection with the appeal, and any additional information submitted by PBGC staff.â Id. § 4003.59(a). Such a decision constitutes the PBGCâs final agency action. Id. § 4003.59(b). After exhausting these administrative remedies, a plan participant may then seek judicial review of the PBGCâs determination. 29 U.S.C. § 1303 (f). B. Standard of Review Under Rule 56 of the Federal Rules of Civil Procedure, summary judgment is appropriate if the pleadings on file, together with the affidavits, if any, show that there is no genuine issue as to any material fact and that the moving party is entitled to judgment as a matter of law. Fed. R.Civ.P. 56(c). Material facts are those that âmight affect the outcome of the suit under the governing law.â Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 , 106 S.Ct. 2505 , 91 L.Ed.2d 202 (1986). The party seeking summary judgment bears the initial burden of demonstrating an absence of a genuine issue of material fact. Celotex Corp. v. Catrett, 477 U.S. 317, 322 , 106 S.Ct. 2548 , 91 L.Ed.2d 265 (1986); Tao v. Freeh, 27 F.3d 635, 638 (D.C.Cir.1994). In considering whether there is a triable issue of fact, the court must draw all reasonable inferences in favor of the non-moving party. Tao, 27 F.3d at 638 . The non-moving partyâs opposition, however, must consist of more than mere unsupported allegations or denials and must be supported by affidavits or other competent evidence setting forth specific facts showing that there is a genuine issue for trial. Fed.R.Civ.P. 56(e); see Celotex Corp., 477 U.S. at 324 , 106 S.Ct. 2548 . As a government agency, the PBGC is subject to the provisions of the *142 Administrative Procedure Act (âAPAâ). 5 U.S.C. § 551 et seq.; see LTV Corp., 496 U.S. at 636 , 110 S.Ct. 2668 . When reviewing agency action pursuant to the APA, the Court must determine whether the challenged decision is âarbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.â 5 U.S.C. § 706 (2)(A). In applying the âarbitrary and capriciousâ standard, a court âmay not supply a reasoned basis for the agencyâs action that the agency itself has not given,â but a court should âuphold a decision of less than ideal clarity if the agencyâs path may reasonably be discerned.â Motor Vehicle Mfrs. Assân v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 43 , 103 S.Ct. 2856 , 77 L.Ed.2d 443 (1983). Upon review of an agencyâs action, the Court must engage in a âthorough, probing, in-depth reviewâ to determine âwhether the decision was based on a consideration of the relevant factors and whether there has been a clear error of judgment.â Citizens to Preserve Overton Park v. Volpe, 401 U.S. 402, 415-16 , 91 S.Ct. 814 , 28 L.Ed.2d 136 (1971). The Courtâs review, however, is limited to the administrative record that was before the agency at the time that its decision was made. 5 U.S.C. § 706 ; Florida Power & Light Co. v. Lorion, 470 U.S. 729 , 743 â 44, 105 S.Ct. 1598 , 84 L.Ed.2d 643 (1985). II. Factual and Procedural Background Plaintiff was employed by Youngstown Sheet and Tube Company (âYS & Tâ) from May 19, 1959 until March 17, 1973 â a period totaling approximately thirteen years and nine months. Administrative Record (âA.R.â) 7. As a YS & T employee, he was a participant in the YS & T Plan. See generally id. at 122-81. Plaintiff claims that he left YS & T because he believed that the work environment was unhealthy, and attributes his subsequently diagnosed lung cancer to his employment at YS & T. Id. at 114-15. In June 1991, plaintiff applied to LTV Steel Company, the successor to YS & T, for pension benefits. Id. at 7. The administrative record does not reveal the precise disposition of the application, but given plaintiffs subsequent application to the PBGC for benefits, it appears that plaintiffs LTV application was denied. In September 2004, after the PBGC became the statutory trustee of the Plan, plaintiff applied to the agency for benefits. 1 Id. at 4-5. The PBGC issued a determination letter in October 2004, finding that plaintiff was not entitled to a pension benefit because he did not meet the fifteen-year service requirement contained in the YS & T Plan. Id. at 14. Plaintiff then filed an appeal with the PBGC Appeals Board, raising five issues for review. See id. at 18-19. Specifically, plaintiff claimed that he qualified for pension benefits because (1) the fifteen-year service requirement did not apply because of the vesting requirements contained in 29 U.S.C. § 1053 (a); (2) he had worked âenough overtime hours (500) to qualify for the 15 yearsâ; (3) he had served in the military for a number of years before his employment at YS & T began; (4) he retired on disability in 1990; and (5) other employees who had worked at the company for less time than he had were receiving pension benefits. Id. The Appeals Board denied plaintiffs appeal in February 2005. First, it explained *143 that 29 U.S.C. § 1053 (a) did not apply to plaintiff because his employment with YS & T ended before 1974. Id. at 28 . With respect to plaintiffs overtime hours, the Appeals Board stated that the YS & T Plan âmeasures continuous service from hire date until continuous service is broken, regardless of how many hours are worked.â Id. The Appeals Board thus concluded that âovertime may not be used to increase [plaintiffs] service.â Id. The PBGC likewise rejected plaintiffs claims regarding his military service and disability status, explaining that neither of those entitled him to pension benefits under either statutory provisions or the YS & T Plan language. Id. at 30 . Finally, the Appeals Board addressed plaintiffs statement about other employees receiving pensions while having worked for less time than plaintiff: Plan provisions are complicated and have varying effective dates. For example, with only 5 years of service a Plan participant who worked after 1988 could earn a vested benefit. Thus, seemingly similarly-situated participants may be affected by different Plan provisions. Therefore, other participants receiving a benefit with less service than [plaintiff] do not show [plaintiff] is entitled to a benefit. Id. The Appeals Board also explained that the PBGC âwill always, even after an appeal is closed, consider any new, specific evidence that you may be entitled to a different benefit.â Id. Plaintiff corresponded with the agency two more times in 2005, but the agency maintained its position that plaintiff was not entitled to benefits under the YS & T Plan. Plaintiff, acting through counsel, filed the instant lawsuit in December 2007. In his Complaint, plaintiff alleges that the PBGCâs determination âwas an abuse of discretion and was not in accordance with lawâ because (1) plaintiff worked âa substantial number of overtime -hours such that he effectively had far more than 15 years of continuous serviceâ; (2) hours of service, not calendar years, were used to determine pension eligibility for other YS & T Plan participants whose employment ended before ERISA went into effect; and (3) the fifteen-year service requirement was âunreasonable and unconscionableâ because it was actively concealed from plaintiff and other YS & T Plan participants by the company. Compl. ¶ 13. The PBGCâs Motion for Summary Judgment, filed in May 2008, is now ripe for decision by this Court. III. Discussion The agencyâs argument in favor of summary judgment is straightforward, mirroring the determination that it made in the administrative proceedings: Plaintiff âdid not have the requisite years of service to receive a benefit under the YS & T Plan that were in effect when he retired in 1973. Therefore, he is not entitled to a benefit.â Def.âs Mot. Summ. J. at 3. In particular, the PBGC argues that section 2.6 of the Pension Agreement for Employees of Youngstown Sheet and Tube Company (effective July 31, 1972) (âthe YS & T Agreementâ) unambiguously requires a participant to have fifteen years of continuous service in order to be eligible for benefits under the YS & T Plan. 2 Furthermore, *144 according to the PBGC, section 5.1 of the YS & T Agreement makes clear that service âis measured by the length of time that a participant was employed, not the number of hours worked.â Def.âs Mot. Summ. J. at 9. The agency therefore argues that even if plaintiff could demonstrate he worked overtime hours, such a showing would not be relevant to his benefit determination. Id. Plaintiff, in his Opposition to the agencyâs Motion for Summary Judgment, acknowledges that âthe full extent of [his overtime hours] was not developed in the administrative record.â Pl.âs Oppân to Def.âs Mot. Summ. J. at 4. He argues, however, that âYS & Tâs practice was to calculate a participantâs years of continuous service based on the total number of hours worked rather than on the number of calendar years the individual was employed.â 3 Id. at 8 . According to plaintiff, this past practice created an implied term in the YS & T Agreement. See id. at 7 . Furthermore, he claims that because the administrative record does not contain evidence as to âwhether this implied contractual term existed and, if it did, whether Plaintiff had sufficient overtime hours to qualify for a pension benefit under it,â the Court should remand to the agency for additional investigation. Id. at 8 (citing Florida Power & Light Co., 470 U.S. at 743-44 , 105 S.Ct. 1598 ). Upon review of the relevant terms of the YS & T Agreement, the Court concludes that the PBGCâs interpretation of that agreement is not only reasonable, but indeed is the only reasonable reading. See, e.g., United Mine Workers of Am.1974, Pension v. Pittston Co., 984 F.2d 469, 473 (D.C.Cir.1993) (âIn cases requiring the court to construe the meaning of a contract, the dispute may be resolved as a matter of law if the contested agreement admits of only one reasonable interpretation.â). As the agency notes, section 5.1 does not speak in terms of hours. The term âhoursâ actually appears nowhere in the YS & T Agreement. Rather, section 5.1 measures continuous service from the hire date to the date that a participant terminates employment with the company. A.R. 36 (YS & T Agreement § 5.1) (calculating âcontinuous serviceâ as service âfrom the participantâs last hiring dateâ to a number of fixed dates, including resignation, discharge, and termination). In short, the unambiguous terms of the YS & T Agreement simply do not contemplate the consideration of hours workedâ whether regular hours or overtime hours â in the calculation of continuous service. 4 This Court therefore rejects plaintiffs contention that the administrative record is somehow incomplete for failing to demonstrate how many overtime hours plaintiff actually worked. Contrary to plaintiffs argument, the Court agrees *145 with the PBGCâs assertion that such information is irrelevant to the determination of benefits in this case and that a remand to the agency is unnecessary. In light of the plain and unambiguous language of the YS & T Agreement, the Court is also unpersuaded by plaintiffs argument that an implied term of the agreement was created by the companyâs alleged practice of calculating continuous service based on hours worked. Although plaintiff correctly states that â[a]n employerâs established past practice can become an implied term of a collective bargaining agreement,â Bonnell/Tredegar Industries, Inc. v. NLRB, 46 F.3d 339 , 344 (4th Cir.1995), the agency did not abuse its discretion in this case by failing to investigate whether â more than thirty years ago â YS & T calculated the continuous service of other employees in a manner that would have been wholly inconsistent with the express, unambiguous terms of the YS & T Agreement. Finally, the Court finds significant that a 1980 regulation promulgated by the Department of Treasury, an agency partially responsible for administering ERISA, expressly authorizes an employersâ use of the exact method contained in the YS & T Plan when calculating a plan participantâs length of service for vesting purposes. 5 See 26 C.F.R. § 1.410 (a) â 7(a); Johnson v. Buckley, 356 F.3d 1067, 1072 (9th Cir.2004) (upholding against challenge the âelapsed-time regulation,â which permits to calculate entitlement to benefits âwith reference to the total period of time which elapses while the employee is employedâ) (quoting 26 C.F.R. § 1.410 (a) â 7(a)(1)(ii)); Swaida v. IBM Retirement Plan, 570 F.Supp. 482, 490 (S.D.N.Y.1983) (same), aff'd 728 F.2d 159 (2d Cir.1984). The regulation lends weight to the PBGCâs contention that its interpretation of the YS & T Agreement is reasonable, particularly because the method described and authorized by the 1980 regulation âwas a reflection of the manner in which vesting and benefit accrual for many private retirement benefit plans were already being calculated across the country.â Johnson, 356 F.3d at 1072 ; see also Swaida, 570 F.Supp. at 489 (explaining that before the passage of ERISA, the elapsed-time method âwas the almost universal method ..., accepted by labor and management alike to measure an employeeâs service for vesting purposesâ). In sum, the Court agrees with the PBGC that plaintiff is not entitled to benefits under the YS & T Plan because he did not meet the continuous-service requirement in the YS & T Agreement. The agencyâs determination therefore could not have been âarbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.â 5 U.S.C. § 706 (2)(A). IV. Conclusion For the foregoing reasons, the PBGCâs Motion for Summary Judgment is GRANTED. An appropriate Order accompanies this Memorandum Opinion. 1 . Plaintiff's daughter, Vikki Montgomery, acted on her fatherâs behalf in most of the proceedings before the PBGC. Moreover, various parts of the administrative record refer to the claimant as the "Estate of Leroy Montgomery.â Plaintiff is alive, however, so that des- . ignation was erroneous. This Court will not distinguish between plaintiff and his daughter when discussing the proceedings below, but notes that plaintiff was at no point represented by legal counsel at the administrative level. 2 . Although multiple pension agreements â reflecting the various plans that have succeeded the YS & T Agreement â appear in the administrative record, the parties agree that the YS & T Agreement is the governing document in this case. See Def.âs Mot. Summ. J. at 8 (referring to the YS & T Agreement as the "governing document for the YS & T Plan in 1973â); Pl.âs Opp'n to Def.âs Mot. Summ. J. at 8 (citing to the YS & T Agreement when referring to "[t]he relevant terms of the pension agreement in effect at the time of Plaintiff's resignationâ). 3 . The PBGC argues that plaintiff failed to make this argument during the administrative proceedings and that it is therefore outside the scope of this Court's appropriate consideration. Def.âs Mot. Summ. J. at 10. As discussed above, a review of the administrative record demonstrates that plaintiff did raise the argument that the overtime hours were sufficient to qualify him for a benefit under the YS & T Plan. See A.R. 18-19. That argument must be construed liberally because plaintiff proceeded pro se before the agency. See Calloway v. Brownlee, 366 F.Supp.2d 43, 55 (D.D.C.2005) ("[Tjhis Court and the agency must take pains to protect the rights of pro se parties against the consequences of technical errors.â) (citing Haines v. Kerner, 404 U.S. 519, 520 , 92 S.Ct. 594 , 30 L.Ed.2d 652 (1972)). The Court therefore rejects the PBGC's argument that this particular claim has been waived. 4 . Likewise, the application for benefits filled out by plaintiff in 1991 included spaces in which to report years, months, and days of employment, but provided no place to account for hours worked. A.R. 7. 5 . Of course, ERISA prohibits employers to require the length of service required by the YS & T Plan. But plaintiff has apparently conceded in this case that 29 U.S.C. § 1053 (a) does not apply to him. See generally Compl. (no reference to ERISAâs vesting requirements). The Court also agrees with the agency that plaintiff abandoned his argument that the YS & T Planâs vesting requirement was unconscionable and unreasonable by failing to address that claim in his opposition to the PBGC's motion. Based on that conclusion, the Court need not address whether that argument was properly presented at the administrative level. Case Information
- Court
- D.D.C.
- Decision Date
- March 2, 2009
- Status
- Precedential