OPINION AND ORDER KENNETH M. KARAS, District Judge: Plaintiff, Glen Vetromile (âPlaintiffâ or âVetromileâ), brings this action against JPI Partners, LLC (âJPIâ or âDefendantâ), his former employer, asserting breach of contract, quantum meruit, and unjust enrichment claims for the alleged failure of JPI to pay certain compensation and severance. Before the Court are the Partiesâ cross-motions for summary judgment. For the reasons stated herein, Defendantâs Motion for Summary Judgment is granted in part and denied in part, and Plaintiffs Cross-Motion for Summary Judgment is denied. I. Background A. Factual Background Plaintiff was employed by Defendant as the âsenior vice president and New York area partnerâ from on or about June 26, 2006 until on or about November 13, 2006, when he was terminated. (Def.âs Statement of Undisputed Facts Pursuant to Local R. 56.1 (âDef.âs 56.1 Stmt.â) ¶¶22, 27.) 1 *445 Plaintiff was an at-will employee of Defendant. (Id. ¶ 23.) Plaintiffs termination was not for cause, but due to âcultural differences.â (Aff. of Neil Sparber (âSparber Aff.â) Ex. F, at 88.) 1. Contractual Provisions and Plaintiffâs Claims Plaintiff asserts that he is entitled to three separate bonuses, participation in a profit sharing program, and severance benefits. (Pl.âs Mem. of Law in Oppân to Def.âs Mot. for Summ. J. & in Supp. of Pl.âs Cross-Mot. for Summ. J. (âPLâs Mem.â) 6-11.) These claims are grounded primarily in the contract signed by the Parties on June 16, 2006, which was entitled âArea Development Partners Profit Participation Planâ (the âContractâ). (Aff. of Jim Butz (âButz Aff.â) ¶ 3; id. Ex. A, at J52.) The Contract included provisions generally applicable to employees of Defendant at Plaintiffs level, and the accompanying âAddendum to Partners Profit Participation Planâ (the âAddendumâ), which contained provisions specific to Plaintiff. (Id. at J68.) a. The Bonuses The Contract and Addendum provide for multiple bonuses for Plaintiff. The first bonus is a $100,000 employment bonus dictated by the following provision in the Addendum: âFor the first three years of employment a minimum of $100,000.00 bonus will be paid as approved by the [Defendant] and the [Plaintiff] must be employed by the Company. The above stated bonus is not a draw and will not be netted with future Profit Participation payments.â (Id.) The remaining two bonuses are for $50,000 and $100,000, and are governed by the following provision in the Addendum: Notwithstanding any other provisions of the Plan, JPI will pay incentives according to the following parameters for the first three years of employment: 1. $50,000.00 per each executed deal as approved by the Investment Committee, put through due diligence, and earned money put at risk. ii. $100,000.00 per each deal with a completed purchase of land. (Id.) b. Profit Sharing Program Under the Contract, Plaintiff was entitled to participate in the Profit Participation Plan (âPPPâ), which entitled Plaintiff to 2% of certain revenues for any project listed in an amended Exhibit B to the Contract. (Def.âs 56.1 Stmt. ¶¶ 23-24.) The Contract provided that projects would be added to âamended Exhibit B[âs] in the Companyâs sole discretion,â and that Plaintiff âw[ould] have no interest in any future project until such project is added to an amended Exhibit B.â (Butz Aff. Ex. A, at J53.) No project was ever added to any amended Exhibit B provided to Plaintiff. (Def.âs 56.1 Stmt. ¶ 25.) 2. The Maritime Yards Project In or about July 2006 (Plaintiffs first month of employment with Defendant), Plaintiff, through his contacts with Clay Fowler, introduced a viable transaction to Defendant known as the Maritime Yards Project. (Id. ¶ 30.) Fowler has testified that the Maritime Yards Project was an off-market transaction, which means that it was not being advertised and that offers were not being actively sought. (Aff. of Paul T. Shoemaker in Supp. of PLâs Cross-Mot. for Summ. J. & in Oppân to Def.âs Mot. for Summ. J. (âShoemaker Aff.â) Ex. 5, at 9-11.) During the course of a friendly conversation, Fowler mentioned the project to Plaintiff. (Id. Ex. 5, at 10.) After *446 Plaintiff brought the project to Defendant, Plaintiff and Fowler engaged in negotiations over several months. (Id. Ex. 5, at 13.) These negotiations did not, during Plaintiffs employment, result in any signed agreements. (Def.âs 56.1 Stmt. ¶¶ 31-32.) At or around when Plaintiff was terminated, Plaintiff ceased to negotiate with Fowler and another JPI employee took over the negotiations. (Shoemaker Aff. Ex. 5, at 18-19.) A letter of intent was signed on November 16, 2006. (Id. Ex. 5, at 17-19.) Defendant approved the deal on or about March 15, 2007, and the purchase was completed on September 19, 2007. (Def.âs 56.1 Stmt. ¶¶ 35-36.) Fowler testified that his negotiations with Plaintiff produced predecessor documents to the letter of intent that was ultimately signed (Shoemaker Aff. Ex. 5, at 15-17), and that, though he had heard of Defendant prior to these dealings, he would not have known of Defendantâs interest in the project and Defendant would not have been involved had it not been for Plaintiff, (id. Ex. 5, at 9). 3. Plaintiffs Termination On November 13, 2006, Defendant sent a letter to Plaintiff entitled âRE: Agreement Concerning Termination of Employmentâ (the âTermination Letterâ) offering Plaintiff, inter alia, $35,828.31 âafter receipt of a fully executed copy of this Severance Agreement.â (Id. Ex. 1 ¶ 3.) The Termination Letter also specified that Plaintiff would, among other things, âfully release the [Defendant] and its Affiliates from any claims arising from your employment with the [Defendant] or otherwise.â (Id. Ex. 1 ¶ 9.) Plaintiff rejected this offer. (Pl.âs 56.1 Stmt. ¶¶ 2-3.) Defendantâs written severance policy states that employees who are employed for fewer than six months are not entitled to severance, and that â[t]he severance pay policy is to be administered according to the discretion of management and may be altered or discontinued at any time without prior notice to Associatesâ (Butz Aff. Ex. D), but a November 13, 2006 internal email (the âNov. 13, 2006 Emailâ) to Defendantâs payroll department stated that Plaintiff was eligible for severance pay, (Shoemaker Aff. Ex. 7). B. Procedural Background This case was removed from state court to this Court on December 5, 2007. Defendant filed its Motion for Summary Judgment on May 1, 2009. Plaintiff filed his Cross-Motion for Summary Judgment on May 4, 2009. The Court held oral argument on February 11, 2010. II. Discussion A. Summa'ry Judgment Standard Summary judgment may be granted where it is shown that there is âno genuine issue as to any material fact and that the movant is entitled to judgment as a matter of law.â Fed.R.Civ.P. 56(c); see also Celotex Corp. v. Catrett, 477 U.S. 317, 322-23 , 106 S.Ct. 2548 , 91 L.Ed.2d 265 (1986). âWhen ruling on a summary judgment motion, the district court must construe the facts in the light most favorable to the non-moving party and must resolve all ambiguities and draw all reasonable inferences against the movant.â Dallas Aerospace, Inc. v. CIS Air Corp., 352 F.3d 775, 780 (2d Cir.2003); see also Tufariello v. Long Island R.R., 458 F.3d 80, 85 (2d Cir.2006) (noting that the court must draw all reasonable inferences in the nonmovantâs favor). A party seeking summary judgment bears the burden of establishing that no genuine issue of material fact exists. See Atl. Mut. Ins. Co. v. CSX Lines, L.L.C., 432 F.3d 428 , 433 (2d Cir.2005). If the non-movant would bear the burden of proof at trial, it âis sufficient for the movant to point to a lack of evidence to go to the trier of fact on an essential element of the nonmovantâs claim. In that event, the *447 nonmoving party must come forward with admissible evidence sufficient to raise a genuine issue of fact for trial.... â Jaramillo v. Weyerhaeuser Co., 536 F.3d 140, 145 (2d Cir.2008) (internal citations omitted); see also Goenaga v. March of Dimes Birth Defects Found., 51 F.3d 14, 18 (2d Cir.1995) (âOnce the moving party has made a properly supported showing sufficient to suggest the absence of any genuine issue as to a material fact, the nonmoving party, in order to defeat summary judgment, must come forward with evidence that would be sufficient to support a jury verdict in his favor.â). âWhen the moving party has carried its burden under Rule 56(c), its opponent must do more than simply show that there is some metaphysical doubt as to the material facts.â Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 586 , 106 S.Ct. 1348 , 89 L.Ed.2d 538 (1986) (footnote omitted); see also McPherson v. N.Y. City Depât of Educ., 457 F.3d 211 , 215 n. 4 (2d Cir.2006) (â[Speculation alone is insufficient to defeat a motion for summary judgment.â). A fact is material when âit might affect the outcome of the suit under governing law.â McCarthy v. Dun & Bradstreet Corp., 482 F.3d 184, 202 (2d Cir.2007) (internal quotation marks omitted). At summary judgment, a court is not charged with weighing the evidence and determining its truth, but with determining whether there is a genuine issue for trial. See Westinghouse Elec. Corp. v. N.Y. City Transit Auth., 735 F.Supp. 1205, 1212 (S.D.N.Y.1990). A courtâs goal should be to âisolate and dispose of factually unsupported claims.â Celotex, 477 U.S. at 323-24 , 106 S.Ct. 2548 . B. Interpretation of Contracts 1. General Principles Neither Party disputes that this case is subject to New Yorkâs substantive law of contracts. (Def.âs Mem. of Law in Supp. of Mot. for Summ. J. (âDef.âs Mem.â) 8-24 (repeatedly citing New York law); Pl.âs Mem. 12-21 (same)); see also Postlewaite v. McGraw-Hill, Inc., 411 F.3d 63, 67 (2d Cir.2005) (applying New York law when the parties did not dispute that it applied). In New York, âa written contract is to be interpreted so as to give effect to the intention of the parties as expressed in the unequivocal language they have employed.â Terwilliger v. Terwilliger, 206 F.3d 240, 245 (2d Cir.2000) (citing Breed v. Ins. Co. of N. Am., 46 N.Y.2d 351 , 413 N.Y.S.2d 352 , 385 N.E.2d 1280, 1282 (1978)). âUnder New York law, the initial interpretation of a contract is a matter of law for the court to decide. Where the agreement is unambiguous, a court may not admit extrinsic evidence and interprets the plain language of the agreement as a matter of law.â Kamfar v. New World Rest. Group, Inc., 347 F.Supp.2d 38, 48-49 (S.D.N.Y.2004) (internal citations and footnotes omitted); see also RJE Corp. v. Northville Indus. Corp., 329 F.3d 310, 314 (2d Cir.2003) (âWhere a âcontract is clear and unambiguous on its face, the intent of the parties must be gleaned from within the four corners of the instrument, and not from extrinsic evidence.â â (quoting De Luca v. De Luca, 300 A.D.2d 342 , 751 N.Y.S.2d 766, 766 (2002))); Terwilliger, 206 F.3d at 245 (â[Mjatters extrinsic to the agreement may not be considered when the intent of the parties can fairly be gleaned from the face of the instrument.â (citing Teitelbaum Holdings, Ltd. v. Gold, 48 N.Y.2d 51 , 421 N.Y.S.2d 556 , 396 N.E.2d 1029, 1032 (1979))). The mere fact that the Parties disagree on the proper interpretation of the contract does not render the contractual language ambiguous. See Metro. Life Ins. Co. v. RJR Nabisco, Inc., 906 F.2d 884 , 889 (2d Cir.1990) (âLanguage whose meaning is otherwise plain is *448 not ambiguous merely because the parties urge different interpretations in the litigation.â); O.D.F. Optronics Ltd. v. Remington Arms Co., No. 08-CV4746, 2008 WL 4410130 , at *11 (S.D.N.Y. Sept. 26, 2008) (â âThe language of a contract is not made ambiguous simply because the parties urge different interpretations.â â (quoting Seiden Assocs., Inc. v. ANC Holdings, Inc., 959 F.2d 425, 428 (2d Cir.1992))). With respect to a contract claim, a court may grant summary judgment when the contractual language is â âplain and unambiguous.â â Zurich Am. Ins. Co. v. ABM Indus., Inc., 397 F.3d 158, 164 (2d Cir.2005) (quoting Brass v. Am. Film Techs., Inc., 987 F.2d 142 , 148-49 (2d Cir.1993)). âContract language is not ambiguous if it has âa definite and precise meaning, unattended by danger of misconception in the purport of the [contract] itself, and concerning which there is no reasonable basis for a difference of opinion.â â Hunt Ltd. v. Lifschultz Fast Freight, Inc., 889 F.2d 1274, 1277 (2d Cir.1989) (alteration in original) (quoting Breed, 385 N.E.2d at 1282 ). %. Entitlement to a Bonus In general, and like other contractual entitlements, entitlement to a bonus only exists where the terms of the relevant contract require it. See Ireton-Hewitt v. Champion Home Builders Co., 501 F.Supp.2d 341, 353 (N.D.N.Y.2007) (âAn âemployeeâs entitlement to a bonus is governed by the terms of the employerâs bonus plan.â â (quoting Hall v. United Parcel Serv. of Am., 76 N.Y.2d 27 , 556 N.Y.S.2d 21 , 555 N.E.2d 273, 279 (1990))); OâDell v. Trans World Entmât Corp., 153 F.Supp.2d 378, 397 (S.D.N.Y.2001) (same). âHowever, this rule is limited by the âlong standing policy against the forfeiture of earned wages.â â Ireton-Hewitt, 501 F.Supp.2d at 353 (quoting Weiner v. Diebold Group, Inc., 173 A.D.2d 166 , 568 N.Y.S.2d 959 , 961 (1991)); see also Gruber v. J.W.E. Silk, Inc., 52 A.D.3d 339, 859 N.Y.S.2d 650, 651 (2008) (same). Consistent with this rule (and its limitation), where the employee has already earned compensation under the terms of his employment contract, his termination does not affect his rights to that compensation, but where the employer retains discretion to award a bonus (or other compensation), no forfeiture of earned wages occurs if the bonus is not paid. See Weiner, 568 N.Y.S.2d at 961 (distinguishing between âa âbonusâ payable at the discretion of the employerâ and âpost employment commissions ... as to which the employer has no right to withhold,â which, like âearned wages,â are ânot subject to forfeitureâ); Aquavella v. Viola, No.2002/06929, 13 Misc.3d 1234(A) , 2006 WL 323167 , at *7 (N.Y.Sup.Ct. Sept. 25, 2006) (distinguishing between âa discretionary bonus or [compensation] otherwise payable at the discretion of the employerâ and âearned wages or salary subject to the longstanding policy against the forfeiture of normal wagesâ (internal quotation marks omitted)), aff 'd as modified, 39 A.D.3d 1191 , 834 N.Y.S.2d 808 (2007); Guggenheimer v. Bernstein Litowitz Berger & Grossmann LLP, 11 Misc.3d 926 , 810 N.Y.S.2d 880 , 886 (Sup.Ct.2006) (stating that â[w]hen a bonus [ ] is an integral part of a compensation packageâ and âhas already been earned by the time the employer decides not to pay it,â âfailure to pay constitutes a breach of the employment agreementâ); Markby v. PaineWebber, Inc., 169 Misc.2d 173 , 650 N.Y.S.2d 950, 954 (Sup.Ct.1996) (âWhile earned wages are not subject to forfeiture, a âbonusâ is payable at the discretion of the employer, and thus is subject to forfeiture.â). If a contract is vague about the nature of the bonus, some courts have held that â[w]hether unpaid incentive compen *449 sation under a bonus plan constitutes a discretionary bonus or earned wages not subject to forfeiture is an issue of fact.â Gruber, 859 N.Y.S.2d at 651 ; see also Mirchel v. RMJ Sec. Corp., 205 A.D.2d 388 , 613 N.Y.S.2d 876, 878 (1994) (same); Markby, 650 N.Y.S.2d at 954 (same). However, where an employeeâs contract either leaves the bonus in the employerâs discretion or conditions it on an event that has not occurred, such as employment through a specific date, courts have decided such questions as a matter of law. See, e.g., Kaul v. Hanover Direct, Inc., 296 F.Supp.2d 506, 519 (S.D.N.Y.2004) (holding that the plaintiff was not entitled to a bonus when the amount of the bonus was expressly tied to the amount remaining due on a debt that had already been satisfied), aff 'd by 148 Fed.Appx. 7 (2d Cir.2005); Welland v. Citigroup, Inc., No. 00-CV-738, 2003 WL 22973574 , at *15 (S.D.N.Y. Dec. 17, 2003) (holding that the plaintiff was not entitled to a bonus where the bonus was conditioned on employment through a specific date and the plaintiff was not employed through that date), aff'd by 116 Fed.Appx. 321 (2d Cir.2004); Criscuolo v. Joseph E. Seagram & Sons, Inc., No. 02-CV-1302, 2003 WL 22415753 , at *10-11 (S.D.N.Y. Oct. 21, 2003) (holding that the plaintiff was not entitled to a bonus when the terms of the bonus stated âthat employees who âleft voluntarilyâ would âforfeitâ the ... bonusâ and plaintiff voluntarily resigned (internal brackets omitted)). C. Plaintiffs Claims 1. The $100,000 Employment Bonus Plaintiff claims that the Addendum entitles him to a $100,000 employment bonus. As outlined above, both Parties agree that the only contractual language relevant to whether Defendant owes Plaintiff this bonus is contained in the Addendum, which provides: For the first three years of employment a minimum of $100,000.00 bonus will be paid as approved by the [Defendant] and the [Plaintiff] must be employed by the [Defendant]. The above stated bonus is not a draw and will not be netted with future Profit Participation payments. After thirty-six months of employment, the terms of the [PPP] only is [sic] in effect. (Butz Aff. Ex. A, at J68.) Defendant initially contended that because Plaintiff was not employed for a full year, he was not entitled to the employment bonus, and, in the alternative, that payment of the bonus was subject to Defendantâs discretion. (Def.âs Mem. 10, 12.) Plaintiff disagrees with Defendantâs first argument and, as to the second argument, argues that even if Defendant retained some discretion over Plaintiffs bonus, Defendant was forbidden, under the covenant of good faith and fair dealing, from exercising its discretion in an âarbitrary and capriciousâ manner. (Pl.âs Mem. 15-20.) Under the Contract, the $100,000 employment bonus was discretionary. Therefore, it follows that the bonus was not earned wages, and that Plaintiffs invocation of New Yorkâs policy âagainst the forfeiture of earned wagesâ (PLâs Mem. 18), is unhelpful. See Weiner, 568 N.Y.S.2d at 961 (distinguishing discretionary bonuses from earned wages); Aquavella, 2006 WL 3232167 , at *7 (same); Markby, 650 N.Y.S.2d at 954 (same). Furthermore, the fact that the employment bonus was discretionary would make irrelevant the Partiesâ dispute about the interpretation of the phrase âmust be employed by.â Even if the Plaintiffs interpretation were correct, and the phrase did not require employment at yearâs end, it would not follow that Plaintiff was entitled to the bonus. However, at oral argument, Defendantâs counsel all but abandoned the claim that the bonus was discretionary and *450 suggested that if Plaintiff had been employed to the yearâs end, the bonus would constitute earned wages. (Tr. of Oral Argument (âTr.â) 54.) 2 Therefore, the Court must address whether there is a legally identifiable meaning of the phrase âthe Participant must be employed by the Company.â (Butz Aff. Ex. A, at J68.) The Court holds that there is not. Plaintiffs argument that the phrase merely requires employment at some point in the year would make it surplusage, as all of its content is contained within the phrase, â[f]or the first three years of employment.â (Id.) However, Defendantâs argument that employment was required until yearâs end finds no textual support. Put bluntly, neither the Contract nor the Addendum state the precise time by which Plaintiff must be employed to receive the bonus. For example, there is no explicit requirement that Plaintiff be employed at the end of each year, only ĂĄ requirement that Plaintiff âmust be employed by the [Defendant].â (Id.) There is no guidance in the text of the Contract or Addendum as to which interpretation is correct. Finally, there is a material dispute of fact as to what the extrinsic evidence demonstrates regarding the Partiesâ intent. Defendant initially suggested that the Contract would âguarantee a $100,000.00 bonus for first [sic] two years of employment.â (Butz. Aff. Ex. B, at 3.) Plaintiff asked for a third year, and Defendant agreed, though Defendant added the language making the bonus discretionary and requiring Plaintiffs employment with Defendant. (Def.âs 56.1 Stmt. ¶ 14; Butz Aff. ¶ 4.) Nothing in this exchange is conclusive as to the intent of the Parties, or the meaning of the final document. âAmbiguity exists when a contract is âcapable of more than one meaning when viewed objectively by a reasonably intelligent person who has examined the context of the entire integrated agreement and who is cognizant of the customs, practices, usages, and terminology as generally understood in the particular trade or business.â â Zurich Am. Ins. Co., 397 F.3d at 164 -65 (quoting Sayers v. Rochester Tel. Corp. Supplemental Mgmt. Pension Plan, 7 F.3d 1091 , 1095 (2d Cir.1993)). Therefore, both the motion and cross-motion seeking summary judgment are denied as to this claim. 2. The $100,000 and $50,000 Deal Bonuses Plaintiff claims that he is entitled to two bonuses from the Maritime Yards Project: a $50,000 deal bonus, and a $100,000 deal with purchase of land bonus. Both Parties agree that the key contractual language is, once again, contained in the Addendum, which provides: Notwithstanding any other provisions of the Plan, JPI will pay incentives according to the following parameters for the first three years of employment: *451 i. $50,000.00 per each executed deal as approved by the Investment Committee, put through due diligence, and earned money put at risk. ii. $100,000.00 per each deal with a completed purchase of land. (Butz Aff. Ex. A, at J68.) Defendant concedes that these bonuses were not discretionary and that if the conditions described in the Addendum were met, then the bonuses had to be paid. (Def.âs Mem. 14 (describing the conditions required for Plaintiff to be entitled to the bonuses).) Defendant argues, however, that these conditions had to be met while Plaintiff was still employed by Defendant. (Id. at 18. ) Therefore, according to Defendant, because these conditions were ultimately met only after Plaintiffs termination, he is not entitled to the two bonuses. To support its argument that Plaintiff âwas required to complete these targets during the time he was employed at JPI in order to be eligible for the incentive payments,â Defendant primarily relies not on the Contract, but on two cases: Anderson v. Sothebyâs, Inc., No. 04-CV8180, 2006 WL 1722576 (S.D.N.Y. June 22, 2006) and Grey v. Federal Deposit Insurance Corp., No. 88-CV-7452, 1998 WL 483460 (S.D.N.Y. Aug. 14, 1998). (PI.âs Mem. 14-19. ) In Anderson , the court âf[ound] that [plaintiffjâs continuing employment [with the defendant] was an implied condition precedent to receiving a bonus.â Anderson, 2006 WL 1722576 , at *20. Though the court in that case did not quote from the relevant contractual language, the decision was based on the fact that the bonus was a managerâs bonus based on the profits of the managed region and that the plaintiff sought the annual bonus based on managing the region from âJanuary 1, 2004 through February 17, 2004.â Id. at *3-4, *20. Moreover, the court found that the plaintiffs âbonus would vest sometime after year-end so long as he remained employed.â Id. at *20. In making that determination, the Court relied on the past practice of the parties. Id. In this case, there is no past practice to guide the Court. In Grey , the court was confronted with contractual language requiring that âconsideration [be] âactually received ... during [plaintiffs] initial nine month employment term.â â Grey, 1998 WL 483460 , at *13 (quoting the relevant contractual language) (omission and second alteration in the original). Unsurprisingly, the court in that case found that the plaintiff was only entitled to bonuses when the consideration was received during plaintiffs employment and not âfor transactions closed months after [plaintiffs] employment ended.â Id. at *14. Here, Defendant contends that â[t]he words used in the Addendum, such as âput throughâ and âcompleted,â [are] similar to [the] word âactualâ used in the contract in Grey , are clear and demonstrate that those events were to occur during the time [Plaintiff] was employed.â (Def.âs Mem. 16.) Defendantâs argument is unpersuasive. The phrase âactually received during plaintiffs initial nine month employment term,â is clear contractual language. See Grey, 1998 WL 483460 , at *13 (alteration, quotation marks, and ellipse omitted). The contract in this case has no such language. Key to the difference between Grey and this case is not the use of the word âactual,â as Defendant contends, but the use of an explicit time frame. If the bonuses were explicitly contingent on deals being âput throughâ or âcompletedâ during the Plaintiffs employment, then Grey would be a highly relevant case. They were not, and it is not. Thus, instead of these cases, the Courtâs analysis properly focuses on the language of the Contract and Addendum, the latter of which, by its own terms, modifies the Contract. (Butz Aff. Ex. A, at J68.); see *452 Rensselaer Polytechnic Inst. v. Varian, Inc., 340 Fed.Appx. 747 , 749 (2d Cir.2009) (summary order) (noting that rather than turning to extrinsic evidence, the Court should read the Contract âas a wholeâ and interpret each part âwith reference to the wholeâ so âas to give effect to its general purposeâ); Adams v. Suozzi, 433 F.3d 220, 228 (2d Cir.2005) (same); Westmoreland Coal Co. v. Entech, Inc., 100 N.Y.2d 352 , 763 N.Y.S.2d 525 , 794 N.E.2d 667, 670 (2003) (same). The Contract generally outlines two types of âincentive compensation:â âAdjusted Cash Flowâ and âAdjusted Project Cash Flow.â (Butz Aff. Ex. A, at J52.) Adjusted Cash Flow is calculated with reference to the profits accrued by Defendant within a âDesignated Geographic Area.â (Id. Ex. A, at J62.) âAdjusted Project Cash Flowâ is âcalculated on a project-by-project basis,â and âincludes both revenues and expenses from the ownership and operation ofâ qualifying projects. (Id. Ex. A, at J65.) Though the term âexecuted dealâ does not appear in the description of either âAdjusted Cash Flowâ or âAdjusted Project Cash Flow,â the deal bonuses are clearly calculated on a âproject-by-project basisâ and not based on a â[designated [g]eographic [ajrea.â It follows that the most natural reading of the bonuses granted to Plaintiff is as guaranteed minimum payments meant to supplement the âAdjusted Project Cashflowâ and âAdjusted Cashflowâ compensation categories. It is undisputed that the purpose of these deal bonuses was âto compensate Vetromile for the period of start up ..., whe[n] his compensation would not have been as high as a senior executiveâs salary in general.â (Def.âs 56.1 Stmt. ¶ 29.) It is also plausible that the $100,000 employment bonus was intended to serve as a minimum payment for the âAdjusted Cash Flowâ compensation category. Thus, the Addendum provided two categories of minimum payments designed to supplement the two categories of compensation in the Contract that would eventually provide Plaintiffs income once he had built up his, and the Defendantâs, portfolio. Plaintiff contends that the Contract and Addendum only required him to âbe a participantâ in the relevant transactions, but not to be employed through the period in which the various triggering conditions were met. (Pl.âs Mem. 14; PLâs Reply 5-6.) The âparticipantâ language may be drawn from the Contractâs description of the âAdjusted Project Cash Flowâ compensation category, which extends compensation for âprojects in which [Plaintiff was] a participant during [his] employment with the [Defendant].â (Butz Aff. Ex. A, at J52.) Indeed, other provisions used to define Adjusted Project Cash Flow repeatedly talk of participation. (Id. Ex. A, at J53 (defining âReal Estate Participation Amountsâ and âReal Estate Participation Percentageâ).) Defendant, in its response, provides further support for reading the deal bonuses as addenda to the Adjusted Project Cash Flow compensation scheme and for using âparticipationâ as the metric for determining whether Plaintiff is entitled to claim the bonuses. (Def.âs Reply Mem. of Law in Further Supp. of Mot. for Summ. J. & in Oppân to PLâs Mot. for Summ. J. (âDef.âs Replyâ) 9-10 (arguing that whether or not Plaintiff originated the deal in question is irrelevant and stating that Plaintiff would have earned the bonus if he âworked on a transactionâ that met the various criteria during Plaintiffs term of employment).) It is also undisputed that Plaintiff was not required to originate the deal in order to be eligible for these deal bonuses. (Def.âs 56.1 Stmt. ¶ 29.) One natural conclusion from all of this, is that Plaintiff was entitled to the deal bonuses when he participated in the relevant deal. However, while it is clear that Plaintiffs participation in the deal was necessary for Plaintiff to be entitled to the *453 bonuses, it is not beyond dispute that participation would have been sufficient. For example, had the Plaintiff merely photocopied a document or two, or participated in some other trivial manner, it is not clear that he would have been entitled to the bonuses. Plaintiffs counsel conceded at oral argument that it might be reasonable to read in a âmaterialityâ requirement to the Contract. Based on this criteria, Plaintiff has an argument that his participation was material as he originated the deal and provided the foundation for the ultimately successful negotiations. However, on a motion for summary judgment, it is not the Courtâs role to establish the most natural reading of the Contract and Addendum. Rather, in order to grant summary judgment, the Court must establish that âthere is no reasonable basis for a difference of opinion.â Hunt Ltd., 889 F.2d at 1277 (internal quotation omitted). Several considerations suggest that even if Plaintiffs reading might be plausible, it is not the only reasonable reading. First, though the Addendum creates two categories of minimum compensation which parallel the kinds of compensation outlined in the Contract, there is no reference in the Addendum, either implicit or explicit, to the compensation categories in the Contract. Specifically, there is nothing in the Addendum itself which ties the $100,000 and $50,000 deal bonuses to the far more detailed explanation of âAdjusted Project Cash Flowâ contained in the Contract. Second, even if the Addendum was intended to provide minimum payments to the compensation categories in the Contract, there is nothing in the language of the Addendum or the Contract which ties the requirements for compensation under the Contract to the requirements for compensation under the Addendum. In sum, there is nothing that directly links any language in the Contract to any language in the Addendum, and the language of the Addendum is silent as to whether Plaintiff needed to be employed when the various triggering conditions were met. Third, even if these considerations are not enough to make Defendantâs interpretation of the Addendum reasonable, Defendant could accept that the Addendum provided for minimum payments for the compensation categories created by the Contract, and that âparticipationâ is an appropriate measurement established by the Contract, and still argue that Plaintiff had to be employed through the triggering conditions. Even Plaintiffs counsel conceded that a materiality requirement might need to be read into the âparticipationâ language because the Contract (which discusses participation) establishes a discretionary compensation scheme, whereas the Addendum establishes a mandatory compensation scheme. Defendant could argue that the materiality requirement was defined by the Addendum â i.e. that only a project that met the triggering conditions during Plaintiffs employment would satisfy materiality. Of course, that would involve conceding that if Plaintiff had photocopied two documents, and thus participated in a deal, he would be entitled to the deal bonuses if he were employed through the triggering conditions. Taking these considerations together, the Court cannot say that the Plaintiffs reading is, as a matter of law, the only reasonable interpretation of the Contract and Addendum'. The Court will, therefore, consider Defendantâs extrinsic evidence. Defendant seeks to support its argument that Plaintiff was required to remain employed through the time that the conditions were satisfied with an affidavit from Jim Butz, Defendantâs Eastern Division âPresident and Managing Partner.â (Butz Aff. ¶ 1; Def.âs Mem. 17.) Butz attests that âJPI does not pay its employees bro *454 kerâs fees or finderâs fees.â (Butz Aff. ¶ 7.) In general that may well be true, but it is not dispositive here. Defendantâs general policy does not defeat the natural reading of the Contract, especially considering that the Addendum is specifically intended to conform the general corporate policy to Plaintiffs situation. (Id. ¶ 3 (acknowledging that the PPP was not an appropriate compensation system for Plaintiff in the early years of Plaintiffs employment with Defendant and stating that â[t]hus, other incentive compensation provisions were negotiatedâ); Def.âs 56.1 Stmt. ¶ 29.) The Butz Affidavit, therefore, does not clarify the Contract or the Addendum. A material dispute of fact exists concerning whether the Parties intended Plaintiff to have to remain employed when the deal bonusesâ milestones, as outlined in the Addendum, were reached. Accordingly, both summary judgment motions are denied as to these claims. S. Mantime Yards Project Profit Sharing In his Complaint, Plaintiff asserted an entitlement to $1,050,000 as payments due under the PPP. (Compl. ¶ 16.) Defendant has moved for summary judgment on this point. (Def.âs Mem. 19.) Plaintiff never responded to Defendantâs arguments, nor made arguments of his own on this issue despite filing a Cross-Motion for Summary Judgement and a reply memorandum. However, at oral argument, Plaintiffs counsel argued that Defendant could not deny Plaintiff these payments in bad faith. Defendant makes two arguments which it believes demonstrates that Plaintiff is not entitled to PPP payments. First, Defendant argues that PPP payments are only made on projects which are in an âExhibit Bâ to the Contract and that the Maritime Yards Project was never attached to Plaintiffs Exhibit B. (Id. at 19-20.) Second, Defendant argues that, under the Contract, it had âsole discretionâ to add projects to Exhibit B. (Id. at 21.) If both of Defendantâs arguments are correct, then the PPP payments would not be earned wages (which are not subject to forfeiture), but would be discretionary payments that had not vested when Plaintiffs employment was terminated. The Contract makes explicit that Plaintiff âwill have no interest in any future project until such project is added to an amended Exhibit B to this agreement,â and that the only eligible projects are ones âwhich ha[ve] been acquired[,] or on which construction has commenced ... as of the dateâ of the amended Exhibit B. (Butz Aff. Ex. A, at J53.) At his deposition, Plaintiff was asked if the agreement he signed had any projects listed on Exhibit B and whether he had ever received an amended Exhibit B. (Sparber Aff. Ex. F, at 85-86.) Plaintiff answered both questions in the negative. (Id.) Plaintiff, therefore, has no evidence suggesting that the Maritime Yards Project was ever attached to a relevant Exhibit B. Moreover, no such evidence is readily apparent in the record. Indeed, the relevant contractual language is quite explicit in stating that âprojects! ] will be added to an amended Exhibit B in the [Defendantâs sole discretion.â (Butz Aff. Ex. A, at J53.) Plaintiff is correct that discretionary decisions regarding contractual rights must be made in good faith. See Travellers Intâl A.G. v. Trans World Airlines, Inc., 41 F.3d 1570, 1575 (2d Cir.1994) (âUnder New York law, the implied covenant of good faith and fair dealing inheres in every contract.â); Sec. Plans, Inc. v. CUNA Mut. Ins. Socây, 261 F.R.D. 4, 9 (W.D.N.Y.2009) (âImplicit in all contracts is a covenant of good faith and fair dealing in the course of contract performance.â (internal quotation marks omitted)). However, the covenant of good faith âcannot be used to impose âobligations that were not *455 explicitly part of the agreement.â â Compania Embotelladora Del Pacifico, S.A. v. Pepsi Cola Co., 650 F.Supp.2d 314, 324 (S.D.N.Y.2009) (quoting Ari & Co. v. Regent Intâl Corp., 273 F.Supp.2d 518, 523 (S.D.N.Y.2003)). âTo state a cause of action for breach of the implied covenant of good faith and fair dealing, âthe plaintiff must allege facts which tend to show that the defendant sought to prevent performance of the contract or to withhold its benefits from the plaintiff.â â Dweck Law Firm, L.L.P. v. Mann, 340 F.Supp.2d 353, 358 (S.D.N.Y.2004) (quoting Aventine Inv. Mgmt., Inc. v. Canadian Imperial Bank of Commerce, 265 A.D.2d 513 , 697 N.Y.S.2d 128, 130 (1999)); see also Schroeder v. Capital One Fin. Corp., 665 F.Supp.2d 219, 225 (E.D.N.Y.2009) (noting that the covenant of good faith is breached âwhen one party acts to deprive the other of the right to receive the benefits under the agreementâ). Plaintiff has not demonstrated bad faith. Plaintiff was an at-will employee, and so could be fired at any time, for any reason. See Arbeeny v. Kennedy Executive Search, Inc., 71 A.D.3d 177 , 893 N.Y.S.2d 39, 44 (2010) (âThe implied covenant of good faith does not give rise to a contract action for the wrongful discharge of an at-will employee.â (internal citation omitted)); Trakis v. Manhattanville Coll., 51 A.D.3d 778 , 859 N.Y.S.2d 453, 455 (2008) (âWhere employment is at will, an employee may be terminated at any time, for any reason, or no reason at all. There is no requirement that the employee be discharged in good faith .... â (internal citations omitted)). Therefore, Plaintiff must demonstrate that the Defendant acted in bad faith at the time it made the decision not to give Plaintiff an amended Exhibit B, a decision that could not have been made, with respect to the Maritime Yards Project (or any other project), until that deal had closed. (Butz Aff. Ex. A, at J53 (requiring a project to âha[ve] been acquiredâ before it could be added to an amended Exhibit B).) However, Plaintiff was no longer employed by Defendant at that time and, so, Defendantâs actions were indisputably rational and reasonable. Given the clear and unambiguous contractual language, and the lack of a showing of bad faith, Plaintiff is not entitled to PPP payments for the Maritime Yards Project, and Defendantâs Motion for Summary Judgement on this claim is granted. J. Severance Benefits Plaintiff alleges a breach of contract claim for severance benefits. (Compl. ¶¶ 19-20.) Defendantâs severance policy states that â[severance pay is pay given at the discretion of the [Defendant]â âbased on the[] length of service in accordance withâ a schedule that states that employees whose length of service is under six months will receive no severance pay. (Butz Aff. Ex. D.) The policy also states that the âseverance pay policy is to be administered according to the discretion of management and may be altered or discontinued at any time without prior notice to Associates.â (Id.) Plaintiff points to no contractual terms that would entitle him to severance pay. Indeed, neither the Contract nor the Addendum mention severance pay. Instead, Plaintiff relies on the Termination Letter (which Plaintiff rejected), and the November 13, 2006 Email. (Pl.âs Mem. 20-21; Shoemaker Aff. Ex. 1; id. Ex. 7.) New York recognizes a breach of contract claim for an at-will employee who did not receive severance pay when that employee presents evidence of â â(1) a regular practice by defendant to make severance payments, and (2) [plaintiffs] reliance on that practice in accepting or continuing his employment.ââ Baguer v. Spanish Broad. Sys., Inc., No. 04-CV-8393, 2007 WL 2780390 , at *6 (S.D.N.Y. Sept. 20, 2007) (quoting Smith v. N.Y. State Elec. & *456 Gas Corp., 155 A.D.2d 850 , 548 N.Y.S.2d 117, 118 (1989)). In this case, Plaintiff presents insufficient evidence establishing Defendantâs regular severance practice, and offers no evidence whatsoever concerning reliance (PLâs Mem. 20-21; PLâs Reply 6-7), thus dooming his severance claim. See Hirschfeld v. Institutional Investor, Inc., 260 A.D.2d 171 , 688 N.Y.S.2d 31, 32 (1999) (dismissing a claim for severance payments for lack of evidence of detrimental reliance); Gallagher v. Ashland Oil, Inc., 183 A.D.2d 1033 , 583 N.Y.S.2d 624, 625-26 (1992) (stating that the standard was âa showing of a regular practice by the employer to provide the benefits now claimed, the employeeâs knowledge of the practice and his or her reliance upon such practice as evidenced by accepting or continuing employment as a result thereof,â and dismissing the claim for severance benefits because âthe record [was] bereft of evidence that plaintiff relied upon the availability of severance pay in accepting or continuing his employmentâ (emphasis in original)). In fact, Plaintiff essentially acknowledges that he has no claim for severance under New York contract law by making no arguments under New York contract law. (PLâs Mem. 20-21; PLâs Reply 6-7.) Instead, in his summary judgment papers, Plaintiff metamorphoses his claim into one arising under ERISA. 3 (PLâs Mem. 20-21; PLâs Reply 6-7 (complaining that âJPI does not deal with the ERISA basis for [Plaintiff]âs claimâ).) That will not do. A party may not automatically raise a claim at summary judgment that he did not plead. See Fed.R.Civ.P. 56(a) (stating that â[a] party claiming relief may move ... for summary judgment on all or part of the claimâ (emphasis added)); Fed.R.Civ.P. 8(a)(1) (stating that a pleading must contain âa short and plain statement of the claim showing that the pleader is entitled to reliefâ); Richards v. Conn. Depât of Corr., 349 F.Supp.2d 278, 291 (D.Conn.2004) (refusing to consider a claim made for the first time in opposition papers to a motion for summary judgment even though the underlying facts of the claim were pled in the plaintiffs complaint). Though the Court has discretion to adjudicate a claim that was not pled, the Court declines to exercise its discretion in Plaintiffs favor due to the utter lack of notice to Defendant and the accompanying prejudice to Defendant. See Richards, 349 F.Supp.2d at 291 (finding prejudice where the failure to plead a claim had âdeprived defendants of the notice necessary to permit them to conduct discovery and prepare a defenseâ). Defendantâs Motion for Summary Judgment on this claim, therefore, is granted. 4 *457 5. Quantum Meruit and Unjust Enrichment Defendant moves for summary judgment on Plaintiffs second and third causes of action for quantum meruit and unjust enrichment. (Def.âs Mem. 21.) Plaintiff responds by acknowledging that â[t]hose claims are irrelevant at this point because JPI does not deny the contract,â but asks that the claims be held in abeyance because they âwould ... be valid if and to the extent that the contract did not apply.â (Pl.âs Mem. 21.) Defendant interprets this as a concession that the claims have no legal basis. (Def.âs Reply 15.) Plaintiff does not respond (see generally PLâs Reply), for good reason as a âplaintiff may only assert a claim of quantum meruit in the absence of an agreement between the parties, be it oral, written or implied-in-fact.â Leibowitz v. Cornell Univ., 584 F.3d 487 , 509 n. 10 (2d Cir.2009); see also Kramer v. Lockwood Pension Servs., Inc., 653 F.Supp.2d 354, 382 (S.D.N.Y.2009) (stating that under New York law, ârecovery for unjust enrichment is barred by a valid and enforceable contractâ). Given that the Court has held that the Contract and Addendum do cover these claims (even if summary judgment cannot be granted on all of them), there is no future event which justifies holding these claims in abeyance. Therefore, the Court grants Defendantâs Motion for Summary Judgment as to these claims. III. Conclusion For the reasons given herein, Defendantâs Motion for Summary Judgment is granted in part and denied in part, and Plaintiffs Cross-Motion for Summary Judgement is denied. The Clerk of the Court is respectfully requested to terminate the relevant motions (Dkt. Nos. 20, 30). SO ORDERED. 1 . Unless otherwise noted, citations to Defendant's 56.1 Statement are citations to facts *445 undisputed by Plaintiff's Statement Pursuant to Local Rule 56.1 ("PL's 56.1 Stmt."). (See Pl.âs 56.1 Stmt. 1 (admitting, by omission, the facts contained in Def.âs 56.1 Stmt. ¶¶ 1-37).) 2 . Elsewhere during oral argument, while Counsel suggested that the $100,000 bonus was payable in JPI's discretion, he conceded that such discretion was limited by the "[(Implied duty of good faith and fair dealing.â (Tr. 50.) Here, Plaintiff alleges that Defendant breached the duty of good faith because the Parties intended this bonus as an employment bonus and Plaintiff was not terminated for cause. (PL's Mem. 16-17.) Because the Court holds that whether the bonus was contingent on employment at year's end is a jury question, if the jury finds for Plaintiff on that point, it could also find that withholding the bonus when Plaintiff was fired by the Defendant for "cultural reasonsâ was a breach of the implied duty of good faith. Thus, even if the bonus is discretionary, summary judgment must be denied as, assuming the bonus was not contingent on employment through yearâs end, a material dispute of fact exists as to whether the Defendant exercised its discretion to deny Plaintiff the bonus in good faith. 3 . If Plaintiff maintains that ERISA governs his severance benefits, then he was required to abandon his state law claims, as they would be pre-empted. See Aetna Health Inc. v. Davila, 542 U.S. 200, 209 , 124 S.Ct. 2488 , 159 L.Ed.2d 312 (2004) (noting that "any state-law cause of action that duplicates, supplements or supplants the ERISA civil enforcement remedy conflicts with the clear congressional intent to make the ERISA remedy exclusive and is therefore pre-emptedâ). 4 . Though the Court need not address Plaintiff's ERISA claim, the Court will make a few observations. Plaintiff has two potential arguments that he is entitled to severance under ERISA. The first is that Defendantâs offer to pay severance in the Termination Letter constituted an admission by Defendant that it owed Plaintiff severance. The second is that the Termination Letter, together with the November 13, 2006 Email, constitute evidence of Defendant's informal policy or practice under which Plaintiff is entitled to severance. Without rehearsing the full complexity of ERISA law, the Court notes that Plaintiff's first argument fails because statements made "in compromise negotiationsâ are "not admissible ... when offered to prove liability....â Fed. R.Evid. 408(a), (a)(2). At oral argument, Plaintiff's counsel argued that this rule was inapposite, but if an offer to pay monies Plain *457 tiff believed were due to him in exchange for a release from all legal claims is not a statement made during âcompromise negotiations,â then the Court is not sure that anything would be. See Alpex Computer Corp. v. Nintendo Co., 770 F.Supp. 161, 163 (S.D.N.Y.1991) ("All that is needed for Rule 408 to apply is an actual dispute, or at least an apparent difference of opinion between the parties as to the validity of a claim.â). Plaintiffs second argument could not rely on Defendant's written severance policy, because under the written policy Plaintiff is not entitled to severance (because he was employed for fewer than six months). See Giordano v. Thomson, 438 F.Supp.2d 35, 43-44 (E.D.N.Y.2005) (stating that to establish a claim under ERISA § 502(a)(1)(B), 29 U.S. § 1132(a)(1)(B), "a plaintiff must ... demonstrate that defendant has failed to comply with the terms of the planâ (internal citations omitted)). Therefore, Plaintiff would have to establish Defendantâs âpast practice of awarding severanceâ to employees in Plaintiff's position (in violation of its written policy). See id. at 41; see also Bennett v. Gill & Duffus Chems., Inc., No. 85-CV-4119, 1987 WL 34256 , at *3-4 (S.D.N.Y. Dec. 29, 1987) (finding that an informal ERISA plan existed based on the past practice of the employer). Yet, Plaintiff has offered no evidence that establishes any of Defendantâs past actions towards other employees in Plaintiff's situation and, therefore, has not established that a material dispute of fact exists concerning Defendant's past severance practice. Case Information
- Court
- S.D.N.Y.
- Decision Date
- March 30, 2010
- Status
- Precedential